Improvement Works for Multi Media Filter to 28MLD STP in Thoothukudi City Municipal Corporation
Providing, laying, jointing, testing and commissioning of inlet, outlet, backwash and drain pipelines for Two Nos. Multi Media Filters (250 m³/hr each), including supply and fixing of pipes (MS/GI/HDPE/UPVC as required), fittings, butterfly valves, flanges, gaskets, nuts & bolts, pipe supports, excavation, backfilling, connection to existing plant, anti-corrosive painting, pressure testing and commissioning. Complete with all labour, tools, tackles and incidental works as directed at site.
Interception and diversion I and D and STP for Existing Drain in Bilari NPP
Electrical & Mechanical works at MPS The complete turnkey-based execution of an SBR-based STP of 3.90 MLD capacity with co-treatment of 5 KLD shall include manual fine screen, mechanical fine step screen, vortex grit removal system, diffusers, decanter mechanism, RAS and WAS pumps, blowers, mixers, aeration system, piping and valves including actuator-operated sluice valves, online DO and MLSS sensors, OCEMS, PLC–SCADA system with HMI, screw press/sludge dewatering machine with sludge feed pump, chemical treatment and dosing system, complete HT/LT electrical system with outdoor sub-station comprising transformers (1 Working + 1 Standby), HT/LT panels, cabling and earthing, DG set with AMF panel, complete campus lighting system, DG set and transformer foundations, fencing of the sub-station as per Indian Electricity Rules (IER) and statutory requirements, and all other associated, incidental and ancillary works required for proper and complete execution of the project.The scope shall cover design, engineering, supply, installation, testing, commissioning, trial run, training and documentation, and the work shall be treated as complete in all respects under a turnkey project. The coarse multi-rack mechanical bar screen of 20 mm spacing for MPS is also included in the STP cost.The STP shall be fully automatic and operated through SCADA; hence, all equipment shall be SCADA-compatible and integrated. A Main Control Station (MCS) shall be provided at the STP as per UPJN norms, including a 65" LED smart monitor, desktop computer with 32" monitor, required furniture, and air-conditioning system.No extra claim shall be admissible for any item required for the successful completion and operation of the STP. The item-wise BOQ breakup, covering all equipment, systems and associated works, shall be submitted by the contractor and shall be scrutinized, finalized and approved by the Department.Obtaining Consent to Establish (CTE), Consent to Operate (CTO), and all statutory approvals/NOCs, including those from the Electrical Safety Department and other authorities related to electrical works, shall be entirely within the contractor’s scope and at the contractor’s own cost. Supply of Multirake type Stainless steel (SS-316), Mechanical Course Bar Screm-20 gaping), Ultrasonic type differmial level sensor, control paned for course har screams, belt coveyor etc. complete in all respect suitbale to handle peak flow - 1 Job
Interception and diversion I and D and STP for Existing Drain in Bilaspur NPP
Design, Construction, Supply of all materials, Erection and Commissioning of co treatment facilities (4.80 MLD STP cum 7.00 KLD FSTP) with all the civil, LT/HT panel room, sub station building, DG set foundation, admin buidling, laboratories, meter room and campus development [Construction of Internal Road (CC Road, 3.5 m wide,min area approx 1600 sqm with 100 mm thick 1:2:4 over 150 mm thick PCC 1:4:8),fiiling of earth if required] fully furnished administrative building having fully functional testing laboratory, PLC/SCADA Rooms, Power Generation building, Blower building, sludge handling system & other building required for technology proposed. OCEMS system at inlet & outlet of STP and master control station (MCS) at STP. Conference room suitable for 15 people, 4 rooms with a attached toilet for supervisory staff and a toilet block, drinking water cooler, all office rooms and conference room (Air Conditioned)., staff quarters as per requirement and specification, external water supply (20KL tank including tube well and pumping arrangement, sanitation work) etc. all complete for STP with co-treatment facilities. STP shall be based on SBR Technology. The effluent quality for agricultural uses (PH-6.5 TO 8.3, SS-30 mg/l, Oil&Grease-10 mg/l, BOD-10mg/l) , COD-30 mg/l , Residual chlorine-nil , TKN-10mg/l, Nitrate N-10 mg/l, F.C.-230 MPN/100 ml, Dissolved P-5 mg/l (preferable 2 mg/l). ) shall be maintained as per CPHEEO manuals. Latest NGT norms for effluent discharge shall be adhered. The capacity of sub station and DG set shall be designed for cumbined load of MPSThe cost is inclusive of MPS (civil works).
Interception and diversion I and D and STP for Existing Drain in Milak NPP
Design, Construction, Supply of all materials, Erection and Commissioning of co treatment facilities (3.1 MLD STP cum 4.00 KLD FSTP) with all the civil, LT/HT panel room, sub station building, DG set foundation, admin buidling, laboratories, meter room and campus development [Construction of Internal Road (CC Road, 3.5 m wide,min area approx 750sqm with 100 mm thick 1:2:4 over 150 mm thick PCC 1:4:8),fiiling of earth if required] fully furnished administrative building having fully functional testing laboratory, PLC/SCADA Rooms, Power Generation building, Blower building, sludge handling system & other building required for technology proposed. OCEMS system at inlet & outlet of STP and master control station (MCS) at STP. Conference room suitable for 15 people, 4 rooms with a attached toilet for supervisory staff and a toilet block, drinking water cooler, all office rooms and conference room (Air Conditioned)., staff quarters as per requirement and specification, external water supply (20KL tank including tube well and pumping arrangement, sanitation work) etc. all complete for STP with co-treatment facilities. STP shall be based on SBR Technology. The effluent quality for agricultural uses (PH-6.5 TO 8.3, SS-30 mg/l, Oil&Grease-10 mg/l, BOD-10mg/l) , COD-30 mg/l , Residual chlorine-nil , TKN-10mg/l, Nitrate N-10 mg/l, F.C.-230 MPN/100 ml, Dissolved P-5 mg/l (preferable 2 mg/l). ) shall be maintained as per CPHEEO manuals. Latest NGT norms for effluent discharge shall be adhered. The capacity of sub station and DG set shall be designed for cumbined load of MPSThe cost is inclusive of MPS (civil works).
SITC of Electrical Control Panel with allied works at inlet unit of Ghitorni STP.
SITC of CCTV s at various location inside the premises of Vasant Kunj STP
SITC of CCTV's at various location inside the premises of Vasant Kunj STP with followings:- Supply of 16 ch NVR with h.265 and HTML5 technology, RTMP stream, alarm capture, send alarm information onmail4 K, one way audio support,1 sata with 16 tb capacity .support p2p,petrol grouping, support 8mp cameras, support smart 265, ,32 user support, mobile view, backup recording in MP4 format, and support VGA/HDMI, support ddns/ upnp. Support channel patrol grouping. support 16 ch ipc input (8 mp/D1+16 ch preview+4 ch playback) BRAND :ENDROID USA /MATRIX/HONEYWELL/ Any other STQC certified make