Loading…
Loading…
3,769 results • Best match
Sewerage and Septage Management for sewer system with STP and laying, jointing, testing and commissioning of Sewerage System in six (06) ULBs of Cluster-5 including 1 year defect liability with 10 years O and M.
TERTIARY TREATMENT Coagulant Dosing System/Flash Mixer + Flocculation + Setting Tank/ Clariflocculator. The design values of the tertiary treatment units are to be considered from CPHEEO Manual on Water Supply & Treatment Flash Mixer Rapid mixing device design confirming to IS: 7090 of 1985. Detention time 60 sec, velocity gradient 300-400 sec-1 with fans gear and motor assembly as per design. Coagulant Dosing System Dosing Tanks-2Nos. With mixing, carrying, dosing with piping arrangement. Chemical Storage area as per data/specifications Flocculation Tank RCC Hopper bottom units having slope >45 Deg as per hydraulic and process design with detention period 20 minutes with flocculator paddles with gear and motor assembly as per design. Flocculator design conforming to IS: 7208-1974 (Type-C). Surface loading rate 8000 liters/hour/sq.m and depth 2.5m using PVC media with supporting arrangement and sludge collecting pipes as per detail specifications. Filter Feed Sump & Pumps Pressure Sand Filters for STP capacities less than 10MLD
Sinking of Borewell at STP at Mullur road at the place indicated by geologist and errection of motor pump arranging power supply of CMC Kollegal
Sinking of Borewell at STP at Mullur road at the place indicated by geologist and errection of motor pump arranging power supply of CMC Kollegal
ADDITION ALTERATION AND SPECIAL REPAIR TO BUILDING NO T 47 AND ADDITION ALTERATION AND SPECIAL REPAIR TO SEWAGE LINE AND STP IN INS ABHIMANYU AND CHARIOT COMPLEX AT NAVAL STATION KARANJA
Supply and fixing of 2 KLD prefabricated Packaged sewage treatment plant consists of both anreobic and areobic (MBBR/FAB) Techonolgy having infloe capacity 2 m3/Adys, Average flow of 100 lph, Peak flow of 300lph having dimension of 1.8mx1.0x1.6m having empty weight of 185 Kg and flooded weight of 3000 kg including Air Alower of Fujimac 120RII of Fujimac brand and Automatic Electical control panel IP65 for the STP operation inclduing air pump complete all as specified and directed by Engr-in-Charge Make :- Sustainable biosolutions Pvt Ltd or Equivalent as approved by GE
O and M of colony lighting network, 33/11 KV S/s, 11/0.4 KV S/s and its network and station lighting network at STPS plant and colony against TN-3213 Elect.
Part – A Operation and Routine /Breakdown Maintenance of electrical work and attending electrical complaints of colony lighting, Station Lighting and 33/11 KV,11/0.4 KV Sub Station and their Network Etc. at STPS Plant & Colony. (as per described in SECTION-D BSR/G-Schedule Part-A) Note:- GST is payable extra as applicable
Radaur Town, Providing and placing of MBBR Media and Sluice Gates at 3.50 MLD STP Jathlana Road Radaur, Block Radaur, Constituency Radaur District Yamuna Nagar.(RECALL)
Restoration of rain damages of Sewerage Scheme to Arki Town in Tehsil Arki District Solan HP SH_P and I of lab Equipment, instrument_apparatus at STP Kunihar