Loading…
Loading…
19,136 results • Best match
ARSENIC FREE WATER TREATMENT PLAN NEAR HOUSE OF ABUL KASEM MOLLYA AT POLTA SANSAD IX UNDER ATURIA G P OF BADURIA DEV BLOCK
ARSENIC FREE WATER TREATMENT PLAN NEAR HOUSE OF ABUL KASEM MOLLYA AT POLTA SANSAD IX UNDER ATURIA G P OF BADURIA DEV BLOCK
ARSENIC FREE WATER TREATMENT PLAN NEAR HOUSE OF ABUL KASEM MOLLYA AT POLTA SANSAD IX UNDER ATURIA G P OF BADURIA DEV BLOCK
ARSENIC FREE WATER TREATMENT PLAN NEAR HOUSE OF ABUL KASEM MOLLYA AT POLTA SANSAD IX UNDER ATURIA G P OF BADURIA DEV BLOCK
Construction of Sajal Dhara Water Treatment Plant 1000 Ltr Capacity Beside H/O Mannan Dhabak at Saheb Danga Uttar XVIII, ID No. 120361148
Construction of Sajal Dhara Water Treatment Plant 1000 Ltr Capacity Beside H/O Mannan Dhabak at Saheb Danga Uttar XVIII, ID No. 120361148
Augmentation of Existing Water Supply Treatment units at Mayang Imphal IB and Khuman Ningthou, Mayang Imphal Project No. 18 (A)
Design, Drawing, construction, Testing and Commissioning of RCC Aerator of 4 – 5 m height above GL consisting of at least 4 to 6 cascades with space requirement of 0.70 m2 per MLD exposed faces line with china glazed colour tiles of approved pattern i/c fixing & providing inlet pipe & internal fittings of suitable pipes i/c smooth finishing of supporting columns and vertical walls, watering, curing, weatherproof painting two coats and giving water tightness test, etc. complete at Mayang Imphal IB WTP (capacity 0.92 MLD).
Supply and delivery of Liquid Chlorine Gas Cylinder in 900Kgs at Kabilakurichi Water treatment plant in Namakkal City Municipal Corporation.
Lifting and transportation of leachate water stored in storage tank from SLF Ghazipur to leachate treatment plant at Tehkhand ESLF
Lifting of leachate water from storage tank at SLF Ghazipur by making suitable pumping system and further transportation and disposal of it to the leachate treatment plant at Tehkhand E-SLF by deploying suitable capacity machine as per prevailing waste disposal norms and guidelines of Honorable NGT/ CPCB (The tentative quantity of leachate water to be transported is 30 KL per day i.e. 30KL * 365 days = 10950 KL in 1 year).