Loading…
Loading…
17,860 results • Best match
Operation and Maintenance of Sewage Treatment Plant of 10 MLD Capacity at Sangavi ISBR-Technology
Supply, installation and commissioning of various special analysers for measuring (BOD, COD, TSS and PH) and Online monitoring software for Sewage Treatment Plants with data connectivity at Kanaganeri, Puducherry
Spectrometry Sensor for Detection of BOD/COD/TSS etc. • Measurement Principle: Measurement of full wave lengths spectra • (UV-VIS Spectrometry) from 200-720 nm, • Multi parameter probe ideal for monitoring of BOD/COD/TSS in Waste water • Direct in-situ measurement in inlet/outlet of waste water treatment plant • The sensor with efficient integrated ultrasonic cleaning facility. If the ultrasonic cleaning can't be provided then the bidder should include the air-pressure cleaning system to ensure long maintenance intervals for this sensor. • The Material of construction is Titanium or equivalent. • The sensor is completely reagent free for operation. Measurement Principle: Uv Vis Spectrometry (200-720 nm) Light Source: Xenon Flash Lamp Accuracy in Standard Solutions: +_3% of the measured value or +_2.5 mg/l Ambient Conditions: Operating temperature: 0 deg * C to 45 deg * C Storage temperature: - 10 deg * Cto + 50 deg * C Carbon parameters To measure the organic load of water, the parameters COD or BOD are used. The differences in these parameters (marginal column) show that these measurements are not identical and that the measured values therefore cannot be equal. In-situ measurement Continuous measurement => fast response time, suitable for control strategies CarboVis® 705 IQ TS
Annual Maintenance of Sewage Treatment Plant 500 KLD Capacity of Todhunter Nagar Campus at PWD Government servant Quarters Todhunter Nagar Saidapet Chennai 15 for the period from April 2026 to March 2027
The STP will be operated and maintained. The manpower considered for Operation and minor maintenance shall be as follows: 1. 2-Nos of person in Plant Operator for General shift & Night shift (2 shift -24 Hours) to operate the STP plant. 2. Carrying out routine and preventive maintenance to ensure optimum productivity levels. Please note that our operator will operate the plant and take care of break down maintenance by our operators. 3. Maintaining proper logbooks of water analysis report by our operators and shall be submitted to official officers in the required format on weekly / fortnightly. 4. Any change in water quality to be shared with our technical team on regular basis to give better performance. 5. Chemicals like hypo, bio culture for STP shall be in GWP scope. 6. Monitor stock level of chemicals on daily basis to avoid stock out situation shall be taken care by our operation team. 7. We need minimum 15 days to depute operators at site from the date of release of PO. Plant Operator for General shift & Night Shift (2 shift - 24 hours) to operate the Sewage Treatment Plant. capacity (500KLD STP) in Todhunter Nagar campus
Comprehensive Operation And maintenance of High Tech 50 MLD Capacity Sewage Treatment Plant based on SBR Technology with other facilities in Sector-12, Kalamboli, Navi Mumbai.
Karur City Municipal Corporation_KFW Scheme_Construction of 35.25 MLD capacity sewage treatment plant at Arasu colony with operation and maintenance for the period of 10 years at Karur Corporation package 3
NAME OF THE WORK: CONSTRUCTION OF 35.25 MLD CAPACITY SEWAGE TREATMENT PLANT AT ARASU COLONY WITH OPERATION AND MAINTANENCE FOR THE PERIOD OF 10 YEARS AT KARUR CORPORATION PACKAGE 3
Operation and Maintenance of various capacity distribution transformers/substations of sewage pumping stations and sewage treatment plants in KDMC area for the period of three years.