Loading…
Loading…
17,994 results • Best match
Design, Construction, Supply, Installation, Testing and Commissioning (Civil, Electro-Mechanical, Electrical, Instrumentation & Other necessary works) of Sewage Treatment Plant (SBR Technology) capacity of 1 MLD, Sewage collection tank for DSC area ... 1MLD STP for ...
8724/E8- REPAIRS / MAINT OF SEWAGE TREATMENT PLANT, REPAIR / REPLACEMENT OF GI PIPE, DOSING PUMPS, REPLACEMENT OF FILTER MEDIA, CLEANING OF EQUALISATION TANK, MBBR, PVC CONNECTING PIPE, UG CABLES, CONTRACTORS, MCCB, MCB, REPAIR TO HYPO DOSING, DWPE
M&L of cleaning of Oil and Grease chamber,Equalization tank,MBBRs, Screening Bar and Centrifuse filter press Chlorine contact tank including cleaning of pumps, LT Panels, DG Set, tertiary filters, micro filter, dosing drums, motors and cleaning will be carried out twice a month for Sewage Treatment Plant of capacity 200 KLD at Brookshabad (electrically operated containing the machinery) all as specified and as directed by Engineer-in-Charge. Note :- (i) All chemicals required for smooth functioning of STP shall be measured and paid separately under appropriate items. (ii) Cleaning of Oil and Grease chamber, Screening Bar and Centrifuse filter press and removal of sludge cake shall be carried out.
Comprehensive Operation and maintenance of sewage treatment plants having capacities 45MLD at Vadolgaon and 09 MLD at Chikhloli with pumping stations and all allied electrical works including 750KVA 1600KVA and 2000KVA transformers and all alied work
Comprehensive Operation & maintenance of sewage treatment plants having capacities 45 MLD at Vadolgaon & 09 MLD at Chikhloli with pumping stations and all allied electrical works including 750 KVA, 1600 KVA & 2000 KVA transformers and all allied works of STP including sludge management system etc.
Custom Bid for Services - 3300012238 ETP SLUDGE PIT SLUDGE REMOVAL, PROCESSING as per procedure as mentioned in SCC for 6 Months including GST to be quoted in GeM, Custom Bid for Services - 1051050 MOBILISATION/DEMOBILISATION CHARGES- ETP as per ... Effluent/ Sewage Treatment ... Effluent/Sewage Treatment Plant ... Treatment Plant Operation ... Effluent/ Sewage Treatment ... Effluent/Sewage Treatment Plant ... Treatment Plant
SDP Sabarimala- Operation and maintenance of sewage treatment plant for monthly pooja temple opening days from February 2022 reg(Retender)
Provn of qty 05 x Fd Sewage Treatment and 10 x Soak Pit Chamber
Supply and Installation of Bio digestor Septic tank (ultra Modular) : FRP bio digester tank of capacity 5000 Ltr (internal dimensions: L=2.5 m, B=2.0m, D=1.00m) FRP bio digester tank is an anaerobic reactor for on site human waste treatment. Tank shall be corrosion-resistant, leak proof, thermally insulated, and suitable for underground/above ground installation. Tank should have one 100 mm pipe with ball valve at the bottom of the tank (for drainage in emergency) and one 100 mm pipe with ball valve at the top Soil waste water Level of the tank to be connected with soak pit chamber . Detailed Tech specifications given as per Appx 'A'