Loading…
Loading…
20,784 results • Latest
Empanelment of manufacturers for 3phase 4wire 10_60 Amp. whole current static meter with pilfer proof meter box.
Construction of Concrete road from Himangshu Mannas house
Renovation of BL and LRO office building at Bagdah under Barasat Division, PWD during 2024-25
Construction of B. P. Road from house of Animesh Khanra
PROCUREMENT OFDESKTOP COMPUTER PRINTER UPS FOR DEPT OF COMMERCIAL TAX GoWB WITH BUY BACK FACILITY
RENOVATION OF RO BCAS KOLKATA ROOM
Additional laying of pipe line with UPVC pipe due to damage of existing pipe line and allied works and construction of IEP back wash drain under Augmentation work at Ashudi WSS at Habra-II Block within Bongaon Sub-Div under Barasat Division, PHE Dte
Yearly maintenance and repair works of Vigyan Chetana Bhavan, Salt lake, during the year 2025-2026 (Building Works only).
Construction of B. P. Road from Mahishamari Ghanashyam Samantas house
Renovation of Barasat Stadium under Barasat Division, PWD North 24 Parganas during the year 2025 - 2026 Vertical extension of existing boundary wall of 230 mtr. Back side of D,E and F block of Barasat Stadium Separation of Stadium Blocks etc.
SUPPLY AND INSTALLATION OF FULLY AUTOMATED RANDOM ACCESS BIOCHEMISTRY ANALYSER AT ESIH ASANSOL
Up gradation of Audio Visual System of Conference Hall for Department Higher Education,5th floor,Bikash Bhavan ,Salt Lake, Kolkata 700 091
Yearly maintenance and repair works of Vigyan Chetana Bhavan, Salt lake, during the year 2025-2026 (S and P Works only)
Construction of B. P. road from Ramesh Das house
manufacture, testing, supply and delivery of Three phase 4wire 20_100Amp energy meter fitted with pilfer proof meter box
Overhauling of 11KV Breaker and LT panel with repairing of PDB cum MCC panel and ATS panel at ISLS-III, AA-I at New Town under NTK Project.
Repairing and restoration of pipeline and allied works at Kharki Water Supply Scheme
URGENT RESTORATION OF AUDIO-VISUAL SYSTEM AT THE CONFERENCE ROOM OF 3RD FLOOR AT NEWTOWN FIRESTATION BUILDING UNDER DEPARTMENT OF FIRE and EMERGENCY SERVICES- REPLACEMENT OF DAMAGED COMPONENTS
Construction of B. P. road from the house of Hemanta Manna
Overhauling of 11KV Breaker and LT panel with allied works at DPS Point-F, AA-I at New Town under NTK Project.
Urgent repairing work to the car parking area and some allied work at Purta Bhavan during the year 2025-2026.
Trial Operation and maintenance of distribution system Jhikra under Deganga Block
Engagement of Guards for guarding arrangement at Basirhat Sub Division office premises, Dakshin Chatra Godown and Trimohini Godown under Basirhat Sub Division, P.H.E. Dte.(Period 1 year)
Urgent repairing work to 3rd Floor Room No 313 and 313A of Directorate of Pension and Profident Fund and Group Insurance during the year 2025-2026.
Manufacture, testing, supply and delivery of 3 ph, 4 Wire LT/HT CT/PT Operated, fully static DLMS Compliant Bulk Consumer Energy Meter
Replacement of damaged doors and installation of one collapsible gate in front of the corridor of Pension Section under Bidhannagar Treasury at Ground floor followed by replacement of damaged false ceiling of toilet adjacent to the office chamber....
Trial Operation and maintenance of distribution system at Kalijug Biswanathpur Water Supply Scheme under Deganga Block
Jackpushing and UC bullah pilling with approach road for Rampur DI pipe store under Hasnabad Sub-Division P.H.E. Dte.
SITC of new AC machines for CCTV server room at Krishnanagar IT Park
Manufacturing ,Testing, Supply and Delivery of DLMS Compliant A.C. Single Phase 2 Wire Solid State fully Electronic Energy Meter with box.
Emergent work for installation of fire extinguisher at West Bengal State Co-Operative Union at DD-18/6, Sector-I, Salt Lake City, Kolkata-700064 during the year 2025-2026.
PROCUMENT OF NETWORK SWITCHES
Annual Maintenance work of damaged soil line, rain water lines and W.C. block of Saishali Complex during the year 2025-2026 (S and P works).
Installation of new fire extinguishers and refilling of existing fire extinguisher at all floors including basement of Purta Bhavan , Salt Lake during the year 2025-2026.
creat a pannel of accredited vehile owners for hiring of vehicle at CMOH office
HORIZONTAL CONNECTIVITY AT THE OFFICES OF LABOUR DEPARTMENT OVER WBSWAN BACKBONE
Yearly maintenance work of ICDS DIRECTORATE office premises at 1st and 2nd floor of Shaishali Complex during the year 2025-2026 (Bldg. and S and P works)
COMPUTERIZATION OF SELECTED PRIMARY WEAVERS COOPERATIVE SOCIETIES
Bid for two complete units of laptops
Supply of Operating System for the West Bengal State Data Centre for Cloud Enablement
PROCUREMENT OF EQUIPMENTS FOR RUNNING OF WBSWAN HORIZONTALLY CONNECTED OFFICES
Hiring of Consultants - Milestone/Deliverable Based - CIVIL STRUCTURAL; Subject Matter Expert, Engineering Design, Structural Design of industrial structure; No; Hybrid(As specified in scope of work)
Digital Storage Oscilloscope (Q3)
WBSWAN CONNECTIVITY OF RTO ATRO OFFICES WB FOR TRANSPORT DEPARTMENT
WBSDCEXPANSION
SUPPLY AND INSTALLATION OF CLIENT SERVER ARCHITECHTURE AND LAN CONNECTIVITY AT DIRECTORATE OF STATE ARCHIVES GOWB 43 SHAKESPEARE SARANI
PROCUREMENT OF IT ASSETS FOR INTERNAL USE OF WEBEL
Sieve Shaker (Q3)
Thin walled flexible elastomeric cable single core with copper conductors for working voltage above 750 volts upto 1.8 KV conforming to RDSO's Specn. No. ELRS/SPEC/ELC/0019, Rev-4. Size: 25 sq.mm. Col
HEXAGON HEAD SCREW M10 x 30.