Loading…
Loading…
20,982 results • Latest
MACHINING OF CONTAINER CARTRIDGE TO DRG. NO. : CIA/AMN/793, PART NO. : ITV 30 WITH OFDC MATERIAL WITH
PROCUREMENT OF HELICOPTER SPARES
Supply, installation and maintenance of Video Conferencing Cameras
Procurement for Selection of Agencies for Publishing of Tender Advertisement in the Leading Daily Newspaper
Construction of new covered drain from the house of Sabir to that of Gafur within Chandigarh RohondaI G.P. Booth No 118/265 under Barasat-II Development Block
Supply of chemical, Micron cartridge filter and other consumable for operation and maintenance of 01 no. Integrated water supply scheme at Trimohini Bazar in Sdk-II Block, capacity of the plant 1 cum/hr. for the period of 1 year
Construction of Concrete Road from H/O Anil Pramanik to H/O Lalit Patra under Kirtipur- I Gram Panchayat within Barasat-II Panchayat Samity
SUPPLY OF DAILY PARADE STATE REGISTER
Donor Bed with Couch system
Supplying of Miscellaneous articles
O and M of 01 no. Pond Based Ultra Filtration Plant at Bhabanipur Parghata Pond within Hasnabad Block under Hasnabad Sub-Division, PHE Dte. For the Period 1 year.
Supply of chemical, Micron cartridge filter and other consumable for operation and maintenance of 01 no. Integrated water supply scheme at Dakshin Tushkhali Adibasi FP Schhol in Sdk-II Block, capacity of the plant 1 cum/hr. for the period of 1 year
Annual repair and maintenance Civil and S and P works of Swasthya Sathi building and Annexe I building in the campus of Swasthya Bhawan Complex for the year 2026 27
SUPPLY, INSTALLATION, AND INTEGRATION OF A UHF RADIO FREQUENCY IDENTIFICATION (UHF RFID) SYSTEM FOR THE CENTRAL LIBRARY, HIRALAL MAZUMDAR MEMORIAL COLLEGE FOR WOMEN
Supply Books For College Library
O and M of 01 no. Pond Based Ultra Filtration Plant at Bhabanipur Molla para Pond within Hasnabad Block under Hasnabad Sub-Division, PHE Dte. For the Period 1 year.
ESTIMATE OF LABORATORY EQUIPMENT
O and M of 01 no. Pond Based Ultra Filtration Plant at Bhabanipur Hospital Pond within Hasnabad Block under Hasnabad Sub-Division, PHE Dte. For the Period 1 year.
Sofa (V3) (Q2)
Entry and Mid Level Desktop Computer (Q2), Computer Printer (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Cleaning Compound Premises surrounding of Office of The Executive Engineer , North Division ,........same including some allied works for a period of one year.
Canteen Service - Employee Welfare Model - Vegetarian, Non-Vegetarian; Breakfast, Lunch, Snacks, Beverages; Inside Building Premises (exclusive for employees/patients in house personnel)
O and M of 01 no. Pond Based Ultra Filtration Plant at Amlani Pond within Hasnabad Block under Hasnabad Sub-Division, PHE Dte. For the Period 1 year.
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Bergoom-II GP under Habra-I Dev Block
Cleaning Compound Premises of Jungles, Plants etc. including Maintenance of Trees at UGR at Salkia, Howrah for one year.
A4and Legal Size Multifunction Printer (MFP) (Q2)
ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system, Repair and Overhauling Service - Ductable Air Conditioner; Voltas; Yes; Buyer Premises
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Bergoom-I GP under Habra-I Dev Block
Procurement of 20 KL TRANSFORMER OIL TANKER
Customized AMC/CMC for Pre-owned Products - Data Center Non IT product; Miscellaneous; Comprehensive Maintenance Contract (CMC); As per scope of wrok; No
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Maslandapur-II GP under Habra-I Dev Block
Repairing of damaged existing guard wall for a length of 54 meter with repairing of existing pitching work for a length of 64 meter and bullah protection work for a length of 20 meter along right bank of Upper Bagjola Khal at ch.2430 meter within Wa
Electric Hoist (Telpher) asper IS3938 (Q3)
Purchase of Spares
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Maslandapur-I GP under Habra-I Dev Block
Providing and Installation of fabric Curtain and other allied works in guest rooms at 1st and 2nd floor of State Guest House on plot no. IID 41 Premises on 04 4444 New Town, Kolkata under Bidhannagar East Division, PWDte.
supply of cooked diets to the indoor patients at ESI Hospital Baltikuri
Emergent restoration of Sundarban river embankment near Majherpara for a total length of 1135.00 m. damage occurred on 21.06.2026 at Mouza-Atapur, G.P.-Monipur, Block- Sandeshkhali-II along of R/B of river Borokalagachi under Kalinagar Irrigation Sub
Supply of cooked diet at ESI hospital Gourhati
supply of cooked diets to the indoor patients at ESI Hospital Serampore
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Kumra GP under Habra-I Dev Block
Repair and Renovation of various roads under Ward No 11 in Panihati Municipality under Pathashree Urban II .( List of 01 no roads are attached in Annexure I)
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Rautara GP under Habra-I Dev Block
Supplying, fitting and fixing of Auto Sensor Door, Toughen glass Door at main entrance of HIDCO BHABAN, repairing and painting of inside Walls of Atrium Hall and allied works, New Town, Kolkata.
Supply and Hire Charges of different type of items of VBG-RAM-G works (As per Annexure-I) within Prithiba GP under Habra-I Dev Block
Supplying of miscellaneous articles
Manpower Outsourcing Services - Fixed Remuneration - Healthcare; Dresser Gr III or OT Assistant Gr III; High Secondary school with Science subjects or equivalent from recognized Board with experience of working in operation theatre and Experience of ..
Operation and running maintenance of existing chlorination plant at Salt lake UGR and collection of water and measurement of residual chlorine by field kit test method in connection with supply of portable water from 5 MGD capacity UGR under BMC
Supply of 05 nos. new 120 litre capacity water purifier and water cooler with providing compressive AMC of those machines for five years at office premises of Department of Planning and Statistics, Joint Administrative Building, Salt Lake