Loading…
Loading…
21,004 results • Latest
Repairing of pathway from BC cutout to Nabaprajanma Annex at Vivekananda Yuba Bharati Krirangan Salt Lake, during the year 2024-25
Emergent repair Seminar Room side Path way and site Cleaning work at the West Bengal National University of Juridical Sciences Dr. Ambedkar Bhavan, 12, LB Block, Sector-III, Salt lake City, Kolkata- 700106 during the year 2024-2025
Shifting of Underground Water Supply line and sewerage Line at the West Bengal National University of Juridical Science Dr. Ambedkar Bhavan, 12, LB Block, Sector-III, Salt lake City, Kolkata-700106 during the year 2024-2025
Emergent Leak repairing on One nos. 350 mm dia D.I. pipe and One nos. 500 mm dia D.I. pipe at Charial More, Ward No. 7 under Budge Budge Municipality.
Round the clock attendance service for fire protection system and periodical intensive checking of entire fire fighting system at Vivekananda Yuba Bharati Krirangan, Salt Lake, Kolkata during the year 2026-2027. (For One Year)
Supply and application of Bleaching Powder solution in the distribution system for 245 days for 4 (four) nos DTWs at Andul Purbapara and Chowdhury Para of Andul GP area under Andul Mohiary Zone-II FAWS Scheme.
Emergent repair Canteen side Path way and site cleaning work at the West Bengal National University of Juridical Sciences Dr. Ambedkar Bhavan, 12, LB Block, Sector-III, Salt lake City, Kolkata- 700106 during the year 2024-2025
Repair and wall cladding work between ramp-28 and 29 at Vivekananda Yuba Bharati Krirangan saltlake, during the year 2024-25
RENEWAL OF SEQRITE ENDPOINT SECURITY EPP TOTAL 7.6 WITH 1YEAR SUBSCRIPTION FOR 500 NODES/USER
Urgent Repair and painting of Pillar and Other Allied Work of Academic Building Front Block at National University of Juridical Sciences at 12LB Block, Sector-III, Salt Lake, Kolkata -106 during the year 2024-25.
Roof slope correction of toilet block nos- 4,5,6 in 5mtr.level at Vivekananda Yuba Bharati Krirangan Salt Lake, during the year 2024-25.
Special repair works in toilet of Block-C at Vivekanenda Yuba Bharati Krirangan during the year 2024-25(S and P)
Covering of window by M S grill at toilet no -3 and 4 at middle tier and other allied works of Vivekananda Yuba Bharati Krirangan during the year 2024-25
Round the clock attendance service for fire protection system and periodical intensive checking of entire fire fighting system at Joint Administrative Building, Salt Lake, Kolkata during the year 2026-2027. (For One Year)
Aluminium Partition and Painting work of University Canteen at the West Bengal National University of Juridical Science Dr. Ambedkar Bhavan, 12, LB Block, Sector-III, Salt lake City, Kolkata-700106 during the year 2024-25
Upgradation of Sandeshkhali RH from 30 to 60 bedded Hospital along with O.T and Labour Room complex at Sandeshkhali ii Block Under Basirhat Health District SITC of DG Set
Provision for Painting on track in front of block -B and block-C at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25.
Horticulture Service – Manpower Based Model - Maintenance of Garden/Lawn/Field/Nursery/Park; General Maintenance of Plant (Mowing, Strimming, Laying, Sweeping, Watering, Weeding); Gardner (Mali)
Providing fresh coat of painting at right side of media zone in damage part only at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25.
Repairing of road side toilet and other allied works at Vivekananda Yuba Bharati Krirangan, Salt lake during the year 2024-25.
Upgradation of Sandeshkhali RH from 30 to 60 bedded Hospital along with O.T and Labour Room complex at Sandeshkhali-ii Block Under Basirhat Health District... SITC of AC Machine
Emergent repair and painting of ramp near AD cutout at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25.
Annual tank cleaning work at Vivekananda Yuba Bharati Krirangan youth hostel (Old and Annex) car parking area and practice field during the year 2024-25.
Suppling, Fitting, fixing flexible prismatic reflective tape at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25.
Rate contract for repairing of Damaged_Defective Distribution Transformers of different Type and Capacity
Suppling, fitting, fixing APP on different location at Vivekananda Yuba Bharati Krirangan, Salt Lake, during the year 2024-25
Repairing Paver tiles at the media entry of at Vivekananda Yuba Bharati Krirangan, Salt lake during the year 2024-25
Providing 8 Nos. 2000 ltr. PVC water storage tank in place of damaged GI tank and other allied works at the roof of 5.0mtr. Level toilet block No- 04 of Nabaprajanma State Youth Hostel at Vivekananda Yuba Bharati Krirangan, Salt Lake during the year
ESTIMATION OF ENHANCEMENT DRAIN and ALLIED WORK NEAR ABOLTABOL PARK (W.T.P) at ward no 29.
Repairing of damage kerb channel both side of ring road at Vivekananda Yuba Bharati Krirangan, Salt Lake during the Year 2024-25.
Rectification and provision of underground S.W line near ramp-20 at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25
Emergent repair and installation of valve of swimming pool water line from pump Swimming pool at Netaji Subhas Sarobar Beliaghata, Kolkata during the year 2024-25.
Suppling, Fitting, Fixing M.S grill at toilet no -9 and 10 at Middle tier and other allied works of Vivekananda Yuba Bharati Krirangan during the year 2024-25
Cleaning, Jungle Cutting, removal of debris....and floating materials time to time (as and when required) of Borrowpit adjacent to Belghoria Expressway within Dum Dum Municipal area, for maintaining ...throughout for 6(six) months. (2nd call).
Fume Exhaust System with Scrubber or Fume Hood with Scrubber (Q3) (3 (3 ))
Roof slope correction of toilet block nos- 1, 2 ,3 in 5mtr.level at Vivekananda Yuba Bharati Krirangan salt lake, during the year 2024-25
Emergent repair and painting of Dormitory hall no. 26 to 30 at Nabaprajanma State Youth Hostel at Yuba Bharati Krirangan, Salt Lake, during the year 2024-2025.
Repairing and renovation of road and guard wall at Mahendra Nagar Kheler Math.
Repair and Renovation of various roads under Ward No 34 Baranagar Municipality .( List of 03 no roads are attached in Annexure I)
Development of Uttar Sulkuni Sub Health Center Boundary Wall at Mouza Sulkuni BH I G P
CONVERSION OF FORGED AXLE INTO AXLE FOR EMU TRAILER COACH AS PER INDIAN RAILWAY DRAWING NO. 2160
Repair and Renovation of various roads under Ward No 21 Baranagar Municipality .( List of 04 no roads are attached in Annexure I)
Construction of Guard wall and Boundary wall of Pinglaswar High School at Baduria Block Dist North 24 Parganas
Construction of Eucalyptus-bullah Barricading for arresting the floating materials, water hyacinth at Upasana Canal Point F DPS_5
Construction of Eucalyptus-bullah Barricading for arresting the floating materials, water hyacinth at Link Canal Point C DPS_4
Deployment of Security Personnel at different Buildings and other places under the jurisdiction of Bidhannagar Municipal Corporation.
Double door refrigerator net capacity 236 to 243L Qty 3921
Lead Acid Storage Batteries For Motor Vehicles with Light Weight and High Cranking Performance (V2) Conforming to IS 14257 (Q3)
Double door refrigerator net capacity 236 to 243L Qty 3811
Construction of Eucalyptus-bullah Barricading for arresting the floating materials, water hyacinth at Ghuni Canal Jatragachi DPS_3