Loading…
Loading…
9,212 results • Latest
Construction of CC Road from H/O Haradhan Bera towards H/O Sasanka Bijoli 85 mtr Bijoli Para Booth no. 7, Mouza- Sapkhali
Repairing of Toilet at Fulbari Shitala H.S. Booth NO. 6 , Mouza- Sapkhali
Repairing of Humepipe Pit near H/O Tapan Adak, Paschim Para. Booth NO. 6, Mouza-Sapkhali.
Construction of BP road from H/O Ajoy Gayen towards H/O Ganga Patra. Dakshin Para. Booth No. 6, Mouza- Sapkhali.
Construction of BP road from H/O Sambhu Sheet towards H/O Sunil Jana. (134 Mtr). Paschim Para. Booth No. 6, Mouza- Sapkhali.
Construction of Culvert over the river Bhareteswari. booth NO. 5, Mouza-Kastala
Temporary Civil works for erection of strong temporary structures like shed pandal with bamboo Salbullah frame for PP training commissioning DC CC strong room temporary toiets other urgent civil works at premises various PS as required WBLA 2026
Repairing of ICDS 4 (Gouranga ICDS) booth no. 5, Mouza- Kastala
Repairing of SGFS road from the H/O Kalipada Maity to H/O Kalipada Das. Booth NO. 5, Mouza- Kastala
Upgradation of Sri Gourango F.P School a/s Shed to roof ceeling 20x20, Booth no. 5, Mouza-Kastala
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4)
High Level Medical Device Disinfectant (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Biorad D10Dual Reorder pack
Multi-functional color Ink Jet printer A4 and legal size, core function : Print, Scan and copy, RAM : 2048, Feature : Secure Print, Fax. Operating system Compatibility : Windows 10 and above. Auto duplexing printing/copying (both side feature) : Yes
Large Outer Diameter Casing Pipes (Petroleum Industry) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Rapid Test Kit for HIV/Syphilis/Hepatitis B Virus (HBV) Hepatitis C Virus (HCV) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Urine Test Strip (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Reagent Grade Distilled water (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Inter connection due to increase of additional length from existing Tubewells to OHR site for improvement of water within Zone No-I of Falta Block under Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur, District South 24 Parganas.
Construction of switch room cum chlorine room (4.88m x 3.66m) including Sanitary arrangement as per departmental drawing at the site of Augmentation of Basanti W/S Scheme (Zone-I) , Block - Basanti under Canning Sub-Division, PHE Dte.(PH No. -II)
INSTALLATION OF SOLAR STREET LIGHT ( 09 NOS) AT DIFFERENT LOCATION AT BOOTH NO - 170, MOUZA - DHABLAT
INSTALLATION OF HUME PIPE NEAR THE HOUSE OF SUKUMAR SAMANTA AT BOOTH -161, MOUZA - CHEMAGURI
INSTALLATION OF LED SOLAR STREET LIGHT 2 NOS AT DIFFERENT LOCATION OF BOOTH NO 147 AT GANGASAGAR MOUZA.
Solar Street Light near house of Ashok Kamila Booth No.133 at Mouza Bishnupur
Solar Street Light near house of Rabin Jana Booth No. 133 at Mouza Bishnupur
Solar Street Light at ICDS Center No.231 Booth No.133 at Bishnupur Mouza
Installation of Solar LED Street Lights ( Seven Nos) at different location at Booth No 149 Mouza Narayani Abad
INSTALLATION OF SOLAR LED STREET LIGHT AT DIFFERENT LOCATION (3 NOS) AT GANGASAGAR MOUZA BOOTH NO -146
Analogue Addressable Multi Sensor
Installation of Solar LED Street Light (7 Nos) at different location at Booth No 145 Mouza Gangasagar
Professional Painting Service - Metals; NA; Pipelines, Structure
Installation of Solar LED Street Light (5 Nos) at different location at Booth No 134 Mouza BISHNUPUR
UPGRADATION OF CC ROAD FROM MAHESWARI F.P SCHOOL GATE TOWARDS PITCH ROAD, SAMANTAPARA (46MT) MOUZA - KHASRAMKAR, BOOTH NO - 67
Sinking of new Tube well At Dhaspara Sumatinagar S.C.F.P School , Booth No 42 Dhaspara.
Piling and repair of BP Road near the house of Malay Gayen at Booth No. 138, Mouza Beguakhali
CONSTRUCTION OF CC ROAD FROM H/O JANSAR SAHA TO NABIR ALI SAHA (120M) (MOUZA-HARINBARI BOOTH NO-81)
SINKING OF TUBEWELL NEAR HOUSE OF MURARI DHARA
REPAIRING OF BRICK ROAD FROM BIJOY PATRA HOUSE TO HOUSE OF SWAPAN MONDAL
REPAIRING OF ROAD WITH PILING WORKS FROM THE HOUSE OF BASANTI PUKUR TOWARDS THE HOUSE OF ANIL KHANRA (70M) AT BOOTH NO - 170, MOUZA - DHABLAT
UPGRADATION OF ROAD FROM THE HOUSE OF ACHINTYA DAS TOWARDS THE HOUSE OF SATYABRATA DAS (350M) AT BOOTH NO - 170, MOUZA - DHABLAT
UPGRADATION OF ROAD FROM THE HOUSE OF DEBASISH SAHU TOWARDS THE HOUSE OF DHIRENDRANATH MAIKAP (110M) AT BOOTH NO 159, MOUZA CHEMAGURI
SINKING OF TUBEWELL NEAR THE HOUSE OF ANIMESH SANTRA AT BOOTH NO 159, MOUZA CHEMAGURI
REPAIRING OF ROAD FROM THE HOUSE OF SWAPAN PATRA TOWARDS THE HOUSE OF PULIN DAS WITH PILING WORKS AT BOOTH NO 152 , MOUZA PURUSOTTAMPUR
UPGRADATION OF ROAD FROM THE LAND OF SHIBRAM GUCHCHAIT TOWARDS HARIMANCHA ( L-100 M ) AT BOOTH NO 152 , MOUZA PURUSOTTAMPUR
Repairing of Road with Piling works from the house of Basanta Mandal towards the house of Lalmohan Mandal Booth No 149 Mouza Narayani Abad
Colouring work and construction Kitchen Shed at Narayani Abad ICDS Center No 114 at Booth No 149 Mouza Narayani Abad
SINKING OF TUBEWELL AT NATENDRAPUR TRANKPAR, NATENDRAPUR MOUZA, BOOTH NO 148
REPAIRING OF NATENDRAPUR HEALTH SUB CENTRE AT NATENDRAPUR MOUZA, BOOTH NO 148
REPAIRING OF CC ROAD WITH PILING NEAR THE POND OF SUBIMAL BERA AT GANGASAGAR MOUZA, BOOTH NO -146
CONSTRUCTION OF C.C. ROAD AT DIAMOND PARK INFRONT PARK SIDE ROAD IN WARD NO.-143.