Loading…
Loading…
9,247 results • Latest
Construction of Concrete covered Drain From the house of Mahadeb Halder to Parbati halder Land at Madhusudanpur
Construction of Concrete covered Drain From the house of Kanai Singha to Baro Khal at Dakshin Gabberia
Construction of Concrete covered Drain From the house of Maidul Molla to Rashid Molla at Raypur I
CONSTRUCTION OF CC ROAD FROM HEDE PARA TO HEDE POND VIA PWD ROAD AT SANSAD V
Suction Catheters (V2) (Q2)
Replacement of 8 nos draw shutters 6 nos at 14vent sluice at Dhosa and 2 nos at 4vent Lenin sluice and servicing of all hoisting system all within the Block PS Baruipur Dist24 PRGS South
Construction of Concrete covered Drain From the house of Dilip baidya to Najibol sekh at Gabberia k
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF SIRAJ GHARAMI TO THE HOUSE OF ARJED GHARAMI AT SANSAD III.
Sterile Single-Use Insulin Syringesfor Human Use Conformingto IS12227 (Q2)
Replacement of 6 nos damaged shutters 3no Draw shutter and 3 nos flap shutter and servicing of screw hoisting system of 3 vented Balarampur Sluice and servicing of 32 nos sluices shutters at Hanra Chitamari Garankati Kulpi Tangra all with in Ku
CONSTRUCTION OF PUCCA DRAIN FROM THE HOUSE OF SIRAJ MONDAL TO THE HOUSE OF SAIFUL MONDAL AT NORE SANSAD IV.
Emergent restoration of Sundarban Embankment damaged due to New moon kotal on and from 11.08.2026 to 15.08.2026 from Ch. 8.93 km. to Ch.9.06 Km. for a length of 130.00 metre facing Bay of Bengal at Mouza Baliara under Mousuni (I) Sub - Division
SINKING AND INSTALLATION OF SUBMERSIBLE PUMP WITH OVERHEAD TANK NEAR DURGO MASJID AT SANSAD III.
INSTAL OF SUBMERSIBLE PUMP WITH TANK WITH PLUMBING CIVIL WORK NEAR HOUSE OF IDRISH MONDAL XIII 109200330 XVFC
REWINDING AND NECESSARY REPAIRING OF 180HP 132 KLW 3 PHASE SQURREL CAGE INDUCTION MOTOR AT ADDITIONAL UTTARBHAG PUMPING STATION DURING YEAR 202627
Emergent restoration of Sundarban embankment damaged due to New Moon kotal on from 11.08.2026 to 15.08.2026 for a length of 60 m in between Ch.7.3 km to Ch 7.36 km. km facing river Hatania-Doania (R) at Mouza-Dwariknagar under Mousuni
Emergent restoration to Sundarban embankment damaged due to New moon kotal on from 11.08.2026 to 15.08.2026 for a length of 60m from Ch. 3.65 km to 3.71 km at Mouza-Uttar Narayanganj, in Block- Namkhana facing left bank of Muriganga under Mou
INSTAL OF SUBMERSIBLE PUMP WITH TANK WITH PLUMBING CIVIL WORK NEAR HOUSE OF MANIK SARDAR XXVII 109200283 XVFC
Emergent 10 (Ten) nos ghoge repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 11.08.2026 to 15.08.2026 for a length of 100.00 m in between Ch 7.00 km and ch 8.50 Km, Ch 16.30 Km to ch 16.310 Km,Ch 14.00 km and ch 14.50 Km
Emergent restoration of Thakurpukur Bibirhat Bakrahat Raipur Road from Ch. 18.00 Kmp to 20.25 Km in different stretches in the district of South 24Parganas under South 24Parganas Division, P.W.D. during the year 2026- 2027.
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 200.00 m in between ch 10.00 km to 10.20 Km of Banstala river right embankment at Mouza Taktipur, Block Kakdwip
INSTAL OF SUBMERSIBLE PUMP WITH TANK WITH PLUMBING CIVIL WORK NEAR HOUSE OF SUCHANDAN MONDAL VII 109200246 XVFC
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 300.00 m in between ch 4.00 km to 4.30 Km of Banstala river left embankment at Mouza Koaberia, Block Kakdwip under Kakdwip
INSTAL OF SUBMERSIBLE PUMP WITH TANK WITH PLUMBING CIVIL WORK NEAR HOUSE OF GOPAL NASKAR XXVIII 109200216 XVFC
Emergent restoration to sundarban embankment damaged due to new moon kotal on and from 11.08.2026 to 15.08.2026 for a length of 205 M in between Ch. 1.050 Km to 1.300 Km at mouza -Phuldubi in Block- Sagar facing left bank of river Hooghly under Sagar
Clearing and removing water hyacinth from Godakhali Branch khal from Metharpole to Dhancheberia for length of 2000 metre, Block - Budge Budge II, District South 24 Parganas under Canals Division during the year of 2026. (2nd call)
Replacement of old damaged submersible pump allied plumbing works of cooling system at Utterbhagh Pumping Station Block PS Baruipuri DistSouth 24 parganas
Internal electrification works for structural plant and compound of proposed 12 TPD Municipal Waste Processing Plant and Internal electrification pump operational F. P. Box work for structural plant and compound of proposed 12 TPD Municipal Waste Pr.
Emergent restoration to Sundarban Embankment damaged due to New moon Kotal on and from 12.08.2026 to 15.08.2026 for a length of 110.00 M in between ch.1.400 Km to 1.510 Km facing Bay of Bengal at Mouza Mahishamari under Sagar Irrigation
Providing Concrete Pathway within the Compound Premises of Karbala Stack-yard along-with Protecting Pond Sides by Bullah Pilling and Cleaning the Stack-yard under LKPHS of DH Highway Division, in the District of South 24 Pgs.
Day to day annual operation, repair and maintenance of Rising Main and Distribution System for different zones at Satjelia (Zone-I,II,III) and Sudhangsupur W/S Scheme under Canning Sub Divn of Alipore Divn., PHE Dte. (for 365 days) (2nd Call)
Mathurapur Health Centre Road from 0.00 Kmp. to 0.95 Kmp. Pot Holes Repairing in patch and Surfacing Work in Different Stretches including Protective Work under Lakshmikantapur Highway Sub-Division of DH Highway Division,in the Dist.of south 24 Pgs
Bank protection with CC lining for a length of 165 m at the left bank of Kantakhali Main Khal alongwith Rehabilitation of Kantakhali Sluice within GP Mallickpur Block PS Falta Dist South 24 ParganasMECH PART
Instrument Lubricant IP spray with> 5% non-ionic. Surfactants, > 30% aliphatic hydrocarbons, solvents
Protection against Slipping out of Flank Earth by providing UC Bullah Pilling at Ch. 0.40 Kmp. (LHS) of Jamtala Petkulchand Road under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Bank protection with CC lining for a length of 50 m at the left bank 50m at right bank of Balarampur Main Khal along with Rehabilitation of Balarampur Sluice within GPFalta Block PS Falta Dist South 24 ParganasMECH PART
Emergent Repair of Pot Holes in stretches by Brick Stitching of Petkulchand to Kishorimohanpur Road from 0.00 Kmp. to 16.00 Kmp. under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Surgical Sutures (Q2)
Surgical Sutures (Q2)
CONSTRUCTION OF RCC COVER DRAIN FROM SASANKA BAG HOUSE TO TAPAS MONDAL HOUSE
Premonsoon maintenance repair work of rope drum hoisting mechanism painting of flap draw shutters covers sf of ropes etc of 10 vent sluice at Chemaguri PSSagar DistSouth 24 PGS during the years 202627
Internal electrification works for structural plant and compound of proposed 18 TPD Municipal Waste Processing Plant and Internal electrification pump operational F. P. Box work for structural plant and compound of proposed 18 TPD Municipal Waste...
Surgical Sutures (Q2)
CONSTRUCTION OF RCC COVER DRAIN FROM RAMESH HALDER HOUSE TO BOLSIDDHI MATH
Construction of Glass canopy at entrance of MDC in IIMC campus.
CONSTRUCTION OF RCC COVER DRAIN FROM MANIK HALDER HOUSE TO PANKAJ HALDER HOUSE
Construction of shed with provision for solar panel installation at car parking of MDC in IIMC campus.
CONSTRUCTION OF RCC COVER DRAIN FROM DAYAL MONDAL HOUSE TO PRASENJIT BAIDYA HOUSE
Construction of CC Cover Drain from the house of Ramen Mondal to Gopal Mondal house at Baneshwarpur under Banganagar-II GP
Construction of CC cover drain from Akram Molla house to Motilal Molla house at Ponkamra under Nowpukuria GP