In Mohalla Qureshi Laying and joining of a 110 mm diameter PVC pipeline spanning 77 meters on Abdul Hadi Road from Raieny Graveyard to the weighbridge (Dharamkaata) and 160 meters from Nathu Singh house to Satveer house and from Jagram house etc
Laying and joining of a 110 mm diameter PVC pipeline In Mohalla Darbare Kalan, Mahal Wali Gali spanning 229 meters from Dr. Tauseef house to the houses of Farid, Samar Iqbal, and Majid and outside Moradabadi Gate 99 meters from Zulfiqar shop etc
Installation of fire hydrants at a total of 13 locations including Municipal Ward Nos. 03, 04, 06, 09, 11, 19, 20, 22, Kailsa Road Crossing, Gandhi Murti Crossing, T.P. Nagar Crossing, Hindu College Crossing, and Kalyanpura Road.
Construction of rain water harvesting at waterworks premises located in Mohalla Nal.
Construction and repair of rain water harvesting at Primary School located in Mohalla Daud Sarai.
The work of installing a Mini Tube-well near the Shelter Home behind the New Roadways Bus Stand under the Municipal Council of Amroha.
The work of constructing and repairing a Rainwater Harvesting system at the Primary School located in Mohalla Laxman wali Madhaiya at Atrasi Road.
The work of installing a Mini Tube-well near Mohalla Mullana Sheikh Chand under the Municipal Council of Amroha.
E-cart for Goods (Q3) (3 (3 ))
The work of laying and joining a total of 514 meters of 110 mm diameter PVC pipe line, including the repair of broken roads at the following locations Mohalla Lakra Islam Nagar Eidgah Road From Alishan house to Anwar house and Yamin house Lakra etc
The work of laying and joining a total of 612 meters of PVC pipe line, including the repair of broken roads at the following locations Mohalla Nal From Master Gulshad house to Nawazish house and Chhuttan house Alley adjacent to Babu Chakki Wala etc
The work of laying and joining a total of 883 meters of PVC pipe line, including the repair of broken interlocking and CC roads at the following locations Awas Vikas II From Jabbar house to Babbu Mansuri house, from Ikram house to Ration Shop etc
The work of laying and joining a total of 881 meters of PVC pipe line, including the repair of broken roads, at the following locations Mohalla Subodh Nagar From Patwari Rana house to Rana and Ramveer house Mohalla Pushkar Nagar at Mazar Road etc
The work of laying and joining a 772-meter PVC pipe line in Mohalla Kot Haudariya from Kids Convent School to the houses of Fahim and Sirajuddin, including its connecting side lanes followed by the repair of the broken road after the pipe laying
Construction of a total of 07 Rainwater Harvesting units at Tubewell No. 18 in Pirgarh Tubewell No. 14 in Qureshi Tubewell No. 20 in Kalyanpura Tubewell No. 21 in Mohammadi Madhaiya Tubewell No. 22 in Ashiyana Colony, Joya Road etc
The work of installing a total of 10 cold water drinking stations Pyau at main, public locations in the Municipal Council of Amroha.
New Construction of NH-09 Saitli Road to Tajbhatta Road
Construction Of V.R.B At Km. 4.000 Of Dhakiya Dy. under Project M.G.C. Stage-II IN DIST MORADABAD
Construction of Dhakiya dy from km 3.700 to km 4.200 under Project M.G.C. Stage-II IN DIST MORADABAD
Construction of Dhakiya dy from km 7.950 to km 8.400 under Project M.G.C. Stage-II IN DIST MORADABAD
10286763, 10287278, 10229834, 10282675, 10234679, 10241022, 10238750, 10244160, 10240287
Widening and Strengthening of Badaun-Bilsi-Bijnor road (SH-51) Ch - 142.000-154.00 and 156.700-164.00 in District Amroha
Construction of missing link between Takhatpur to Apraula
Construction of drain in Abadi portion of Khaikhera to Behlolpur road via Karmallipur-Rehdra-Kaserva
SR of Dhanaura Sherpur road to Mukeempura road
Tricycle or Rickshaw for Carrying Goods (V2) (Q3) (3 (3 ))
Construction Of V.R.B Cum fall At Km. 13.000 Of Kundarki Dy. under M.G.CSTAGE-II IN DIST MORADABAD
Construction Of V.R.B At Km. 14.300 Of Kundarki Dy. under M.G.CSTAGE-II IN DIST MORADABAD
Construction Of Out fall At Km. 15.100 Of Kundarki Dy. under M.G.CSTAGE-II IN DIST MORADABAD
Construction Of VRB At Km. 1.210 Of Kundarki Dy.Including Construction of kundarki dy from km 1.190 to km 1.230 under M.G.C. STAGE-II IN DIST MORADABAD
Construction Of VRB At Km. 8.335 Of Kundarki Dy. under M.G.C. STAGE-II IN DIST MORADABAD
Work No 14 Beautification work of the intersection near the pond on Damgadhi Road in Ikonda of Nagar Panchayat Saidnagli
Work No 13 Beautification work of the intersection in front of the house of Vinod Jatav in Mehandipur of Nagar Panchayat Saidnagli
Work No 12 Repair and renovation work of the primary school in Kakrua of Nagar Panchayat Saidnagli
Work No 11 Repair and painting work in the primary school at Chandpur in Nagar Panchayat Saidnagli
Work No 10 Repair and renovation work of primary school in Sabdalpur Sharqi of Nagar Panchayat Saidnagli
Work No 09 Repair and renovation work in Mehandipur Primary School of Nagar Panchayat Saidnaglii and the school in Madhaiyo of Sabdalpur
Work No 08 Nagar Panchayat Saidnagli Sambhal Bypass construction of drain from Omprakash Halwai shop to Ghanta Ghar
Work No 07 Construction of drain from Sambhal Bypass Pakbada Square to transformer in the populated area in Nagar Panchayat Saidnagli
Work No 06 Construction of CC road and drain from Pawan house to Bittu house in front of Chamunda Temple and in the subsidiary lanes in Ward No 09 Dharamshala of Nagar Panchayat Saidnagli
Work No 05 Construction of CC road and drain from the house of Puneet Prajapati to the house of Mahendra Kashyap via the house of Chhatrapal Kashyap in ward No 08 Ikonda East South of Nagar Panchayat Saidnagli
Work No 04 Construction of CC road and drain from Dr Fahim house to Hanif house in Ward No 06 Shani Dev Temple of Nagar Panchayat Saidnagli
Work No 03 Construction of CC road and drain from Ayub plot to Naeem house and from Shakir house to Babu house and from Farman house to Intezar house in Ward No 06 Shani Dev Temple of Nagar Panchayat Saidnagli
Work No 02 Construction of CC road and drain from Ayub Saifi house to Tara B house in Ward No 06 Shani Dev Temple of Nagar Panchayat Saidnagli
Work No 01 Construction of CC road and drain on the Chamunda Temple route from the main road to Rambharose farm in Ward No 02 Sabdalpur Sharqi of Nagar Panchayat Saidnagli
Substation Clamps/Connectors (Q3)
Substation Clamps/Connectors (Q3)
Tripping Coil (Q3)
Construction of CC tiles road and RCC U-type drain from Dinesh house to Kale house in Ward-24 Jalalnagar.
Construction work of CC tiles road/drain from Sajid house to Farman house in Ward-24 Jalalnagar.