Loading…
Loading…
6,655 results • Latest
STEEL PIPE 40MM, PVC PANELING, WALL PUTTY, TOUCH WOOD, TURPENTINE OIL, PATRI 8inch 6 inch 4inch, WOOD FILLER, VARNISH, BRUSH, PAINT SILVER, PAINT BROWN, STEEL BINDING WIRE 6MM, LIGHTING BOARD BAR, CHAIR CUSHIONS COVER, LED CONSOLE LIGHT, LED FOCUS LIGHT, MICA SHEET 8FT X 4FT, SR FEVICOL 500ML, ROUND TABLE, TEA THERMOS 5LTR, TEA THERMOS 2LTR, CASSEROLLE, CUP SAUCER SET, TABLE SPOON, MOSQUITO RAQUET, TABLE CLOTH, TRAY CLOTH, HAND TOWELS, LARGE TOWELS, FOOTMAT, BED SHEET DOUBLE, BED SHEET SINGLE, PILLOW, BLANKET DOUBLE BED, STEEL JUG, PILLOW COVER, BLANKET SINGLE BED, WALL HANGING 3FT X 5FT, WALL HANGING 2.5FT X 4FT, PAINT TERRACOTTA, SHOWER CURTAIN, ROD FOR SHOWER CURTAIN, DOOR STRIP, LED ROUND LIGHT, BED SHEET WITH PILLOW COVER, BLANKET MONTE CARLO, UMBRELLA LARGE, WATER MOTOR 0.5HP, WALL MOUNT FAN, PLASTIC BUCKET, PLASTIC MUG, ELECTRIC KETTLE 2LTR, QUILT DOUBLE BED, EXHAUST FAN, NOTICE BOARD 3FT X 4FT, TOWEL SET BOMBAY DYIENG
Purchase of Mod Eqpt
Procurement of Books oblique Magazines
Refined Groundnut Oil (V4) (Defence) (Q3)
Refined Groundnut Oil (V4) (Defence) (Q3)
Refined Groundnut Oil (V4) (Defence) (Q3)
Refined Groundnut Oil (V4) (Defence) (Q3)
Refined Sunflower Oil (V4) (Defence) (Q3)
Refined Sunflower Oil (V4) (Defence) (Q3)
Metal Shelving Racks (Adjustable Type) conforming To Is 1883 (V2) (Q2)
Refined Sunflower Oil (V4) (Defence) (Q3)
Refined Sunflower Oil (V4) (Defence) (Q3)
Raising of drain with slab and main hole from H/O Ab Gani Lone to Zahoor Ahmad Beigh at Sarnal Bala ward No 13 Anantnag
(A). Construction of Lift Shafts at Transit Accommodation And (B). Design, SITC of 21 Nos (Gplus3) 05 Passsenger Customized MRL lifts at Transit Accommodation at RanbirPora/Wantrag Anantnag.
(A)Construction of Lift Shafts at Transit Accommodation And (B) Design,SITC of 20 No (Gplus3) 05 Passsenger Customized MRL lifts at Transit Accomodation at Shangus Anantnag
Nandpora Nathpora at RD 350
Construction of Central drain from H/O Altaf Ahmad to Mohd Yousuf Mir at Ganjiwara Anantnag
Extraction, Conversion and Supply of Firewood from Various Compartments of Lidder Forest Division including other operations Complete Job
Repair of damaged fencing and slope protection structures around power house and along canal at MHP Pahalgam
Non Paper Printing Services - Area Based - Nameplates & Signages; Digital; PVC (as per ISO/IEC 7810), Acrylic, Metallic, Non Paper Printing Services - Area Based - Flex & Banners; Digital; PVC (as per ISO/IEC 7810)
Dry Fruits and Nuts (Q3) (3 (3 ))
Dry Fruits and Nuts (Q3) (3 (3 ))
Repair works inside power house like repairing of transformer bed stairs front store work including machine hall floor control room floor stairs and arresting of water leakages in machine hall at MHP Pahalgam
Stage contract for the year 2026 27
Face lifting including completion of balance works of sub divisional hut and forebay hut at MHP Pahalgam.
Construction of retaining wall along with drain around back side of switchyard generator room and hut at MHP Pahalgam.
lubs and greases
SPECIAL REPAIR TO BLDG NO P 18 AGAINST JOB NO W SR BLDG 02 STN HQ KHUNMOH 2025 26 UNDER GE 861 EWS
SPECIAL REPAIR TO BLDG NO P 51 AGAINST JOB NO W SR BLDG 03 STN HQ KHUNMOH 2025 26 UNDER GE 861 EWS
SPECIAL REPAIR TO BLDG NO P 49 AGAINST JOB NO W SR BLDG 01 STN HQ KHUNMOH 2025 26 UNDER GE 861 EWS
Form Fill Seal FFS Machine, Cold Press Juice Extraction Machine, Automatic 100 LPH Shell And Tube Type Juice Pasteurizer, Industrial Vacuum Dryer, Shrink Wrapping Machine Table top, Semi Automatic Lug Capping Machine, Jam filling machine, Vegetable AND Fruit Slicer, Continuous Induction Sealer, Handheld Smart Date Coder Thermal Inkjet Printer, Band sealer
Front Wheel Outer and Inner Brg, Check Nut, Sleeve Cyl Assy, Snap Ring Washer, Differential star cage assy with Bearing, Rear door Hinge, Brake pad assy
Providing and Installation of 1 No. 12.5 Mtr Motorised High Mast with 4 No.s of 200 w LED Flood Lights Complete with Earthing, and Foundation at Power House Pahalgam
Tensioner Belt, Piston Assy, Sleeve Linner, Piston Ring, Cam Bush, Main Bearing, CR Bearing, CR Bush, Head Valve, Head Seat, Thermostat Joint, Injection pipe, Clutch plate, Pressure Plate, Clutch release Bearing, Drive Shaft, Hose Pipe, Shaft Bearing
Realigning of HT Wire existing over Agricultural Land at Mir Danter under CDF,43-Anantnag-West.
Providing and fitting of additional column pipes and associated works at water supply scheme Herbuchoo Sikhbasti (Well No. 01) under M and R
Procurement of Defence Material
PROVN OF BOUNDARY PILLARS FOR DEMARCATION IN RESPECT OF A1 DEFENCE LAND AT DARANG COB UNDER GE 861 EWS
Ordinary Portland Cement (V3) Conforming to IS 269 for Bulk Buying (Q3) (3 (3 ))
Empanelment of Engineering Consultants for Providing Consultancy Services (Architectural, Structural, Etc.) for Various Building Projects /Works of RnB Division Anantnag.
Ordinary Portland Cement (V3) Conforming to IS 269 for Bulk Buying (Q3) (3 (3 ))
Construction of Lane and Drain form H/O Manzoor Ahmad Beigh to Tahir Ahmad Khan at Sarnal Bala Ward No 13
Construction of Road from H/O Waseem Ahmad Mir upto wall of Daughter of Mohammad Ibrahim Mir Gaswatu at Sarnal Bala (Phase Ist)
Construction of Lane / Bathroom at Masjid Shareef Batapora Anchidora Anantnag
Construction of Drain form H/O Nasir Ahmad Sheikh to H/O Nazir Ahmad Hafiz , Mushtaq Ahmad Wani Gratbal Anchidora Anantnag.
Construction of Lane from Farooq Ahmad Khanday to Shabir Ahmad Khanday Bon Mohalla Anchidora Anantnag
Maintenance nd Repairment of Various Quarters of Housing Colony Khanabal nd other Buildings of RnB Division Anantnag.
Augmentation of 100 KVA to 250 KVA sub station at Astan Mohalla Hardpora under CDF Grants 41-Dooru