Loading…
Loading…
172 live123 closing this weekmost from Director Cum Chief Engineer RED and U P Irrigation Department (Civil)
172 results • Latest
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, CANE TRANSPORTATION FOR CENTRE GANGAPUR BHYURA
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, CANE TRANSPORTATION FOR CENTRE KAKRAHA AT MANJHAW
Handling and Transport on Lumpsum Basis - Handling Service, Transport Service, CANE TRANSPORTATION FOR CENTRE BEGAMPUR
Customized AMC/CMC for Pre-owned Products - AMC OF VARIOUS WEIGHMENT SOFTWARE; AMC OF VARIOUS WEIGHMENT SOFTWARE; Annual Maintenance Contract (AMC); Annually; No
Facility Management Services - LumpSum Based - THATCHED HUT CUNSTRUCTION WORK SIZE 8x12x12 AND HAND PUMP INSTALLATION ON OUT CENTRES; THATCHED HUT CUNSTRUCTION WORK SIZE 8x12x12 AND HAND PUMP INSTALLATION ON OUT CENTRES; Consumables to be provided by..
Construction Of Pathway in Tha Primary Scool Chandradevapurwa Godhiya No.1
Upgradation work of Health Sub Centre Lalpur At Huzurpur
Upgradation work of Health Sub Centre Nasrapur
Construction of a pathway within the premises of Upper Primary School, Nasirganj
CONSTRUCTION WORK OF MINOR BRIDGE, APPROACH ROAD, ADDITIONAL APPROACH ROAD AND PROTECTIVE WORKS BETWEEN GOSAINPURWA AND PANDITPURWA AT VILLAGE JOTCHANDPARA ON THE SARYU RIVER IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHANSABHA-MAHSI
Upgradation work of Health Sub Centre Gobraha
Upgradation work of Health Sub Centre Gauriya At Huzurpur
Upgradation work of Health Sub Centre Katghari At Huzurpur
WIDENING AND STRENGTHENING WORK ON THE KHAIRA BAZAR TO KODAHI KANERA ROAD (ODR) FROM CHAINAGE 0.000 TO 10.700 (TOTAL LENGTH 10.700 KM) IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHAN SABHA-MAHSI WITH FIVE YEAR MAINTENANCE
CONSTRUCTION OF A NEW BOUNDARY WALL TO REPLACE THE DILAPIDATED BOUNDARY WALL OF THE INSPECTION HOUSE CIVIL LINES IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27
Construction Work Pathway in Tha Premises Of Primary School Jagannath Mahatopurwa Godhaiya No. 3
Upgradation work of Health Sub Centre Guduwapur
Upgradation work of Health Sub Centre Newasi At Huzurpur
Construction of Pathway in the Premises Of Composite School Sohram Matrepur
Upgradation work of Health Sub Centre Laukhai At Huzurpur
Construction of Pathway in the Premises Of Composite School Godhiya No.2
Upgradation work of Health Sub Centre Mallahan Singh Chilhariya
Upgradation work of Health Sub Centre Premadas Kutti Huzurpur
Handling and Transport on Lumpsum Basis - Transport Service, CANE WEIGHBRIDGE TRANSPORTATION FROM MILL GATE TO CENTRE AND AFTER CRUSHING SEASON 2026-27 CENTRE TO MILL GATE TRANSPORTATION WORK
WIDENING AND STRENGTHENING WORK KUNDASAR-MAHSI-NANPARA (MDR) KM-44 (SINGIYA NASIRPUR MOD) TO NAKWA MOD COVERING CHAINAGE 0.000 TO 3.350 IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHAN SABHA-MAHSI WITH FIVE YEAR MAINTENANCE
Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 12.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 15.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 17.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 20.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 22.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 25.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 27.5 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 30.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 35.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 40.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 45.0 H. P, Supply of Smart Controller (Fully Automatic Air Break Star Delta Starter Panel) 50.0 H. P
SUPPLY OF WEIGHBRIDGE SPARES
SUPPLY OF WEIGHBRIDGE HARDWARE SPARES
SUPPLY OF 100 TON ELECTRONIC WEIGHBRIDGE IRON
Upgradation Work of Health Sub-centre Patupur
Construction of Pathway in the Premises Of Primary School Kandauli
Construction Work Pathway in Tha Premises Of Higher Primary School Jagannath Mahatopurwa Godhaiya No. 3
Construction Of A Canopy At The Kapurthala Auditorium In Bahraich District.
Facility Management Services - LumpSum Based - Government Sugar Mill; Supply of Electronic and Machenical Weighbridges Spares; Consumables to be provided by service provider (inclusive in contract cost)
RENEWAL WORK OF DAULATPUR-MAHESHPUR LINK ROAD IN DISTRICT BAHRAICH FINANCIAL YEAR 2026-27 VIDHAN SABHA-BALHA
WORK OF ROOF TOP RAINWATER HARVESTING OF NON-RESIDENTIAL BUILDINGS 04 NOS DIVISIONAL OFFICE BUILDINGS PROVINCIAL DIVISION AND CONSTRUCTION DIVSION-1 AND CONSTRUCTION DIVSION-2 PP AND CONSTRUCTION DIVSION-3 INB AND CIRCLE OFFICE BAHRAICH
paddy handling work in bahraich
RENEWAL OF HEAD REGULATOR BRIDGE ROAD OF SMC AND SITE OFFICE FRONT ROAD AT SARYU BARRAGE.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Hospital; Microscope; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Hospital; Anesthesia Workstation; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Hospital; Dental X-Ray Machine; Service Provider
Bio Medical Waste Management Service - Per bed basis - As Per Scope of Work; Medical colleges & institutions; Medical colleges & institutions
Construction of Gramin Stadium At Village Gangudever, Tehsil-Payagpur District- Bahraich.
Gram Panchayat Chandrawa me Prathmik Pathshala se Ramsamujh ke ghar tak 170 Meter lambai me interlocking karya, Vikas Khand Viseshwarganj_10
Gram Panchayat Babanagar Kodri ke Majra Pakdi me Pich Road se Ram Narayan ke ghat tak 200 Meter lambai me interlocking karya, Vikas Khand Viseshwarganj_09
Gram Panchayat Narayanpur ke Dhamshideehwa Pich Road se Sureshwar Nath Dube ke ghar tak 330 Meter lambai me interlocking karya, Vikas Khand Payagpur_08
Gam Bhakla Sidrakha Damar Road se Anil Singh ke baag tak 235 Meter lambai me interlocking karya, Vikas Khand Kaisarganj_06
Gramsabha Gurchahi ke Shukulpurwa me C.C. road se Mahesh Kumar Shukla ke ghar tak 155 Meter lambai me interlocking karya, Vikas Khand Payagpur_05
Gram Panchayat Gajipur Kodri me Pich Road School hote huye Pul tak 315 Meter lambai me interlocking karya, Vikas Khand Huzoorpur_07
Gam Gulriya Gazipur Nahar Puliya se jai Prakash Tripathi Shashtri Factory hote huye Shamshaan tak 250 Meter lambai me interlocking karya, Vikas Khand Kaisarganj_02