Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,282 results • Latest
Construction of PMGSY Road to Ambajharan road in the district of Bolangir under MMSY for the year 2026-27
Construction of Road and Drain with Cover Slab From Salil Das res to Backside of Pratima tent house,,W.No-20
Construction of road and drain with cover slab from Aju res to nalini sahoo res,W.No-20
Construction of Road and Drain with cover slab From Raju Mahakur res to Nilanchal res,W.No-20
Renovation Works to 220 132 33 KV Grid Sub-Station Control Room at Budhipadar (Provision of Inside plaster, painting, Vitrified tile flooring and Sanitary Installations)
Construction of Paver Road from Rashmi Pattnaik res to Behera Babu res, Mahalaxminagar, W.No.18
Construction of Paver Road and Drain with Cover Slab from Salepali Bandha to Trilochan Mahapatra res, Salepali, W.No.18
Construction of Road from Barai Nagar to Binyak Nagar, W.No.18
Const. of Road from Sailandre Banka Res to Srikanta Mishra Res Via Kanhei Niwas, Alok Nagar, W.No.21
Const. of Paver Road from Panda Res to Tuna Seth Res W.No.1
Const. of Paver Road from BipinKalsai Res to MeherSamaj, Swadhin Nagar, W.No.1
Const. of Paver Road from Ganesh Rout Res to LaxmipriyaSethi Res, Shantipara, W.No.1
Refilling of Fire Extinguisher Cylinders - Water CO2 9L DCP 9kG DCP 10kG AFFF 9L CO2 5KG; 9L 9KG 10KG 9L 5KG; More than 5 Years
Construction of Paver Block Road from Lakhiya Meher res to Asit Behera res, Lane-2 , Jyotinagar,W.No.1
Construction of Additional Class Room Building at RENGALI GOVT.NUPS
Construction of Additional Class Room Building at MALIMUNDA UPS
Distribution Transformer, 3 Phase, upto and Including 200 KVA ISI Marked To IS 1180 (Part 1) (Q2)
Renovation of Canal System of Hirakud Dam Project of Sukha Canal Section Barpali Irrigation Division Barpali
Anti Bird Spike (Q3)
FUZE PERCUSSION DA NO. 117 (EMPTY) MK. 20 WITH CAP TO DESIGNERS REF NO. L5/10744/GE/341, PART NO: QX- 244
Construction of E-type Quarter (Block-II) for staff of Upper Lanth Irrigation Division, Belpada.
Construction of D-type Quarter (Block-II) for staff of Upper Lanth Irrigation Division, Belpada
Construction of Boundary wall and approach road with gate at CHC, Saintala
Construction of First floor in IPD Hospital Building of Govt. Ayurvedic College,Balangir
Supply, Installation, Testing and Commissioning of 1 no. of 16 Passenger Lift and 1 No. of 20 Passenger Lift for BBMCH/DHH Balangir in the district of Balangir
SHELL 125MM HE 1A (EMPTY) TO DRG PART NO ISX-61 GE(DESIGNER'S REF NO. CQA(A)/AMN/2590) DC-NO. 37147- A
HEAD FUZE B429E (EMPTY ASSY) TO DRG. PART NO. IQX-74 GE. DC NO. 34663 A. DT. 11.7. 89. EXCEPT COMPONENT S T
BASE TO DRG. 3-026892, 4* 40-1 SHEET-1&3 DC NO. 35958-A, DT. 22.05. 95 SHEET-2 DC NO. 37240-A DT. 17.12. 09(
Percentage Rate Contract (PRC) on MES SSR 2020 for maintenance of civil works in O.F.BADMAL Estate Type- I, II and III area.
Percentage Rate Contract (PRC) on MES SSR-2020 for maintenance of civil works in O.F. Badmal Security Perimeter Wall inside factory area.
Replacement of damaged/cracked ACC sheet, north light curves, north light glass, MS/AC/GI valley gutters of storage bldg. inside factory.
Percentage Rate Contract (PRC) on MES SSR-2020 for maintenance of civil works in O.F. Badmal Estate Type-IV and V.
Percentage Rate Contract (PRC) on MES-SSR-2020 Part-II for maintenance of electrical installation inside the factory area at O.F. Badmal.
Face lifting works of road side concrete structure, iron structure, public buildings and welcome maintenance of residential quarters in estate area.
Modification of existing damaged RCC deck slab culvert into RCC Hume Pipe Culvert at front of Gate-I and before way to water supply section of VIP road at OFBL estate area.
EXECUTION OF 3 NOS. LIS WITH INTAKE POINTS ON TEL RIVER , UNDER RIVER (PATHARLA ISS INCLUDING ITS DIST. NETWORK UPTO 1 HA CHAK HAVING PLANNED CCA 4330HA IN CLUSTER-XXXVI INCLUDING POWER SYSTEM CONNECTIVITY AND O AND M FOR 15 YEARS ON EPC TURNKEY MODE
Renovation/up-gradation of 12Nos. suites at first floor of FTH (Guest house No.02) in estate.
Supply ,Fitting and fixing of barriading and other necessary venue set up arrangement and alied civil work for celebrtaion of independence day at district head quarter Balangir for the year 2026-27
PRINTER
Construction of Limpara to Kherat (NH 59 Road) in the district of Bolangir under MMSY-TRIP for the year 2024-25
Engagement of user fee collection agency on the basis of E quotation through e-tender at Nuapada fee Plaza at Km 117.400 Strengthening of 2 lane to 2 Lane Carriageway with paved shoulder of Bolangir Khurda section of NH-57 in the State of Odisha
RELIANCE 4 Core XLPE Cable, Conductor Area - 25 sq mm Brand: RELIANCE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687786026019 dt.24/08/2026)
HYDROPNEUMATIC PRESS CYLINDER, TYPE-K1.51. 50.5, MAKE-TOX PRESSOTECHNIC GMBH. CO, HYDROPNEUMATIC PRESS CYLINDER TYPE S2.50. 12 PRESS FORCE 20KN AT 10 BAR PRESSURE TOTAL STROKE 50MM, HYDROPNEUMATIC PRESS CYLINDER TYPE S1.50. 12 PRESS FORCE 10KN AT 10 BAR PRESSURE TOTAL STROKE 50MM
SUPPLY OF PVC INSULATED, ARMOURED, UNSCREENED, UNDERGROUND RAILWAY SIGNALLING CABLE[COPPER CONDUCTOR] SIZE 24 CORE X 1.5 Sq mm TO RDSO SPECIFICATION No IRS:S:63/2014 (REV 4.0) OR LATEST, IF ANY
Design Fabrication Supply Installation Demonstration
Construction of RD Road to Banjipada road in the district of Bolangir under MMSY for the year 2026-27
Construction of Desil Luthurbandh PWD road to Dumdumi road in the district of Bolangir under MMSY for the year 2026-27
Const. of Additional Classroom Building at Sialjhudungi Govt PS under Kholan GP.
Development and Beautification of Adiyogi Sclupture surrounding at Deobandh Pahad , Titlagarh.
Band Saw Machine (Q3)