Loading…
Loading…
466 results • Latest
Decorative Lightning Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Facility Management Services - LumpSum Based - Supply and installation Frp Designer Pillar; Supply and installation Frp Designer Pillar; Consumables to be provided by service provider (inclusive in contract cost)
Supply and Fixing of 7 Mtr Ashok Stambh
Repair and protective work of the approach road of Faguia bridge located at km 02 of Allahnagar Faguia Dhobaha Ghat link road.
Mural wall work on both sides of the main roads located in Tulsipur Nagar Panchayat in Balrampur district.
Renewal of Babagaj Rehra Marg se Badhya Marg to Badhya Farid Khan Ram Sagar Purva Shankarpurva shankardih South pukki link road
Octagonal Pole (V2) (Q3), LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of High Level Bridge i/c Approach Road Across Iria River on Karamdiha – Bengo Road.
Janpad Balrampur ki Tahsheel Balrampur me Tahsheeldar, Tahsheeldar (Nyayiyk) va Nayab Tahsheeeldar hetu Type 3 ke 03 avas evam Type 4 ke 01 avas ke nirman ka karya (Vidhyutikaran ka karya)
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Rope Light (LED Strip Light) Conforming To IS 10322 (Part 5/Section 9) (Under BIS Scheme - II) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
RENOVATION OF SANAWAL TANK SCHEME.
Construction Of High Level Bridge i/c Approach Road Across Moran River on Kapildevpur – Basera Road.
Construction of High Level Bridge i/c Approach Road Across Iria River on Wadrafnagar – Mendhari Road
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
As per Tender Document
As per Tender Document
As Per Tender Document
Lot 1
Tourism development work of the ancient Shiva temple located at Ram Sabha Rahmatpur, Rehra Bazar, Development Block, Balrampur district
As per Tender Document
LED Luminaire For Road And Street Lights Conforming To IS10322 (Part5/Section3) (V3) (Under BISScheme-II) (Q2)
Nagar Palika Parishad Balrampur Seemantragat Supply and installation of cctv cameras and establishment of control room
Repair and protective work of the access of the minor bridge located at Km. 02 of Khajuriya Sonpur link road.
Repair and protective work of the approach road of 3x6 m span mini bridge located at Km 02 Laldih of Balui to Mirzapur link road.
Repair and protective work of the approach road of the small bridge located in km 1 of the Balrampur Bahraich road to Paigapur (Pyagpur) link road.
Repair and protective work of the approach road of the small bridge located at km 02 of the Tedua to Rachhauda link road.
Design and Construction of 02 lane ROB at LC 136 SPL/3E On Bahraich Tulsipur Marg (NH-730) Near Jharkhandi in Tulsipur Assembly Constituency of District Balrampur, U.P. on EPC Mode.
Handpump Sub-Assemblies (Deepwell Hand Pumps Components) Conforming IS 15500 (Part 3) (Q3), Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3), Cast Iron Components (Deepwell Hand Pumps Components) Conforming to IS 15500 (Part 5) (Q3), Brass/Bronze Components (Deepwell Hand Pumps Components) as per IS 15500 (Q3), Rubber Components (Deepwell Hand Pumps Components) as per IS 15500, IS 12732 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Bituminous Painting on Approach Road of constructed V.R.B. at km. 120.510 of Rapti Main Canal in Distt.-Siddharth Nagar
Construction of RE Wall and Approach Road both side on 4 Lane Rail Over Bridge Between Level Crossing 86B-2 to 550m in East under Barhni Bypass of Gorakhpur Rail Section in District Siddharth Nagar
Nagar Palika Parishad Balrampur Me Tulsipur Road Se MRF Tak CC Road Ka Nirman Kaarya
Construction of High Level Bridge i/c Approach Road Across Leedo River on Syahi – Sanawal (M.D.R) In K.M.1/6.
Nagar Palika Parishad Balrampur Me Chouk Se Major Chauraha Hote Huye Kali Mai Than Tak CC Road Ka Nirman Kaarya
Ward Bhagwatiganj Dakshini Me Stith Shiv Mandir Ke Prangan Me Avsthapna Tatha Suvidhaun Ka Vikas Kaarya
Ward Purabtola Purvi Me Shiv Mandir Ke Bagal Upvan Yojna Ka Kaarya
SEE IN TECHNICAL BOQ
NIT 1125 Construction of CC Road Under MMGGPY PKG NO MMGGPY-BLP-14(03 Works), District-Balrampur
Work of external painting etc of PM Shri Kendriya Vidyalaya building
Repair work in BRC building in Primary School Badalpur Chaikhadiya campus.
Repair work in BRC building Primary School Sekhuikalan campus
As per Tender Document
Earth work in clearance of thecks and obstruction Between km 0.000 to km 4.500 in Girgitahi Feeder Drain
Earth work in clearance of thecks and obstruction Between km 0.000 to km 5.000 in Chittaurgarh Feeder Drain-2
Earth work in clearance of thecks and obstruction Between km 0.000 to km 2.500 in Bhagwanpur Feeder Drain
Earth work in clearance of thecks and obstruction Between km 5.000 to km 10.000 in Majhagawan Feeder Drain.
Earth work in clearance of thecks and obstruction Between km 0.000 to km 4.000 in Dhawai Drain
Earth work in clearance of thecks and obstruction Between km 0.000 to km 4.500 in Sangrampur Drain.
Earth work in clearance of thecks and obstruction Between km 4.000 to km 8.300 in Sakalda Drain