Loading…
Loading…
50 results • Latest
Thiram Water Dispersible Powder For Slurry Seed Treatment (V3) Conforming To Is4766 (Q2)
Master controller complete Specification :- CLW drg no. 1 TWD.241.115 Alt.11 with latest Alt.with two part drg.no.- 4TWD.241.094 Alt.2 with latest Alt.and 2TWD.241.140 Alt.1 with latest Alt.
Facility Management Services - LumpSum Based - PREMISES OF RAJKIYE ENGINEERING COLLEGE ATARRA; O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)
Comprehensive Reassessment of Hydrological Analysis and Design Flood Studies of Bariyarpur Pick up Weir, Banda Barrage and Pailani Barrage under Ken-Betwa Link Project
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Power House Equipment, The work of replacement of damaged VCB Panels at various 33/11 KV Sub-Stations as Sub-Stations Protection works under Business Plan 20..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Work of special maintenance and repairing of 33 KV, 11 KV and LT Lines damaged due to heavy storm at 33/11 KV Sub-Station, ..