Loading…
Loading…
988 results • Latest
Reconstruction of 125 Meter Boundary Wall at NMY Rath Under Mandi Samiti Rath
CONSTRUCTION WORK OF A SMALL BRIDGE IN PLACE OF THE CULVERT LOCATED ON MADARAR DRAIN IN LAHORA LINK ROAD IN BANDA DISTRICT
CONSTRUCTION OF A SMALL BRIDGE IN PLACE OF THE CAUSEWAY LOCATED ON THE PONGRI DRAIN ON THE KHALARI LINK ROAD IN BANDA DISTRICT
Construction/Installation of 05 no. of Medium Deep Piezometers at DTH sites in Div Banda Under UP Atal Bhujal Yojna
Construction/Installation of 05 No.of Medium Deep Piezometers at DC sites in Div Banda Under UP Atal Bhujal Yojna
CONSTRUCTION OF RCC NALA IN FRONT OF GAUSHALA NEAR APOLLO TYRE TOWARDS BISANDA IN ORAN BANDA MARG.
CONSTRUCTION OF RCC NALA FROM KAMASIN TIRAHA TO HOUSE OF BINDA PANDEY IN ORAN.
CONSTRUCTION OF RCC NALA FROM HOUSE OF NEMCHANDRA SAHU TOWARDS KAMASIN IN ORAN KAMASIN MARG AT ORAN.
Iron Chaukhat with all installation and fixing with concrete work
Exhaust with frame
CT 100/50/5 and 150/75/5-5
Other Work and Patch Repair in VR Road Under Block Jaspura Part-B
Other Work and Patch Repair in ODR Road Under Block Jaspura
Other Work and Patch Repair in VR Road Under Block Jaspura Part-A
ADDN/ ALTN TO CHAIN LINK FENCING FOR DEFENCE LAND AT BANDA BASTI AREA MHOW UNDER GE (MCTE) MHOW
PRASASNIK BHAWAN MAIN LINE WIRERING AND REPAIRING 150MTR CABLE FITTING, BLOCK B LADIES TOILET REPARING, SANSTHAN SUMERCIABLE REPAIRING, SOLAR PRASASNIK BHAWAN MAIN PANEL AND INVERTER REPAIRING, PRASASNIK BHAWAN RO MACHINE REPAIRING WORK, CANON IR2004N PHOTO COPIEYAR REPAIRING WORK, CANON G2010 INKJET PRINTER REPAIRING, OFFICE DESKTOP COMPUTER REPAIRING, PLACEMENT CPU REPAIRING WORK, COPA LAB DESKTOP OS INSTALATION, FITTER CLASS ROOM SMART BOARD UPS REPAIRING, PRASASNIK BHAWAN TTL MITTI BHARAEE PER SQ MTR, PRASASNIK AUR PRASISHAN BHAWAN WATER TANK CLEANING WORK, BARSAAT KE PANI NIKASI KA WORK 100MTR, CHANEL PAINTING WORK 12 X 8 FIT, ROLLING SHATER PAINTING WORK 6X 8 FIT, VRASHA ROPAN KA DIGGING A HOLE, SANSTHAN PARISAR ME PEDH PAUDHE AUR JHADI KI KATAI KA KARYA
Rainwater harvesting work at Circuit House Banda
Annual Maintenance Contract of street light and high mast for 3 years at I.A. Bhuragarh Distt. Banda and Bargarh Distt. Chitrkoot.
Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3) (3 (3 ))
Electric Utility shifting at Tindwari Bagiya Piprahri Amlor Road in Banda District
Repair and Maintenance of Madhaulikala Adhawal Ghat Pantoon Bridge on Yamuna River
Repair and Maintenance of Bara Galauli Pantoon Bridge on Yamuna River At Km-15 of Pailani Bara Road
Other Work and Patch Repair in VR Road Under Block Badokharkhurd Part-B
Other Work and Patch Repair in VR Road Under Block Badokharkhurd Part-A
CONSTRUCTION WORK OF NAUHAI LINK ROAD -INCLUDING 5 YEARS MAINTENANCE-
Construction of Padhohara to Padhoharapar dera Link Road Including 5 year Maintenance
Construction of Khaptihakala Sandi Road to Suwansha Dera Link Road including 5 year Maintenance
Construction of Gawain River Itawa to Parampurva Link Road Including 5 Year Maintenance
Construction of Khaptihakhurd to Bugeha Link Road Inclulding 5 Year Maintenance
Maintenance, Repair and Painting of 10 No. A Type Shops, 14 No. B Type Shop and 10 No. C Type Shop at NMY Muskura.
Other Work and Patch Repair in VR Road Under Block Tindwari Part-B
Other Work and Patch Repair in VR Road Under Block Tindwari Part-A
Other Work and Patch Repair in ODR Road Under Block Tindwari
CONSTRUCTION WORK OF BAHUNAGI LINK ROAD -INCLUDING 5 YEARS MAINTENANCE-
CONSTRUCTION WORK OF ANTHUVA TO TINDUHI LINK ROAD -INCLUDING 5 YEARS MAINTENANCE-
CONSTRUCTION WORK OF NAGNEDHI TO TINDUHI LINK ROAD -INCLUDING 5 YEARS MAINTENANCE-
CONSTRUCTION OF LINK ROAD FROM BHOLENATH INTER COLLEGE IN GARGPUR TO MADWARA VIA SITARAM KUSHWAHA PURVA -INCLUDING 5 YEARS OF MAINTENANCE-
CONSTRUCTION OF KOLHU BABA LINK ROAD FROM FATEHGANJ POLICE STATION -INCLUDING 5 YEARS MAINTENANCE-
CONSTRUCTION OF LINK ROAD FROM BHOLENATH INTER COLLEGE IN GARGPUR TO MADWARA VIA SITARAM KUSHWAHA PURVA -INCLUDING 5 YEARS OF MAINTENANCE-
CONSTRUCTION WORK OF BOX CULVERT AT KM 02 OF KURAULI LINK ROAD IN BANDA DISTRICT
8330040704, 8390990054, 8330201244, 8330101154, 8330994644, 8332621604, 8384127764, 8330103094, 8330203434, 8330201604, 8330011724, 8355222474, 8355312914, 8355212264, 8333210534, 8331564604, 8330996204
Patch repair work on various VR roads in Baberu Development Block under Assistant Engineer III
Patch repair work on various SH and ODR under Assistant Engineer II
Patch repair work on various VR roads in Kamasin Development Block under Assistant Engineer III
Construction work of community hall/marriage hall in Jamrehi village panchayat of Mahuva development block.
Construction work of link road from Baberu Marka Road Chhoti Inguwari to Bari Inguwari via Canal Track in Banda district.
Construction of Type-III Residence (S Plus 3) Block-A (12 Nos.) at Government I.T.I. Campus, District- Banda (U.P.)
As per BOQ
Construction work of Primary Health Centre in Village Jaurahi of District Banda (U.P.)
Construction of Roof Top Rain Water Harvesting System AT Dist Insti of Education and Training DIET BANDA