Loading…
Loading…
2,850 results • Latest
C/O CC PATH FROM MAIN ROAD TO H/O AB GANI MIR
C/O FENCING OF GRAVEYARD PIR MOHALLA
C/O REPAIRMENT OF DRAIN WITH STEEL COVER JAMIA MASJID KHERPORA
C/O DRAIN FROM SHOP OF KHARSHEED AHMAD RATHER TO MARKAZI MASJID SHAREEF WITH FILLING WARD 2
C/O CULVERT ON KAVEN ROAD NEAR L/O AB KHALIQ KUMAR WARD NO 02
DEVELOPMENT OF JANAZGH BY WAY OF TILE AND ELECTRIFICATION WARD 01
C/O FENCING OF PUBLIC PARK OF GANIE MOHALLA AND PATH FROM MAIN LINK ROAD TO HABIBULLAH GANAIE WARD 04
C/O PATH WITH FENCING NEAR NAMDAR MALIK ONWARDS WARD NO 03
C/O CC PATH FROM JAMIA MASJID TO MOHD RAMZAN AND OTHERS
C/O DRAIN WITH PATHFORM L/O NZIR AHMAD TO ASHIQ HUSSAIN KHAN TANGDAJI
C/O P BUND FROM H/O MOHD SHAFI GOJAR TO BOOBA BEGUM MUGHAL MOHALLA
C/O P BUND NEAR H/O ZUBAIR AHMAD KHAN
C/O P BUND BACKSIDE NEAR H/O GH AH LONE, NISSAR AH LONE AND NADEEM AH LONE AT CHUNTIMULLA
C/O REMAINING PORTION FOR BALANCE WORK OF NEW HEALTH CENTRE AT S K PAYEEN
FENCING WITH R-WALL FOR GRAVEYARD BHAT MOHALLA KONAN
C/O FOT PATH FROM MOHD SHAFI TO NAZIR PASWAL WARD NO 3 SIRENDER
C/O FOOT PATH FROM RIVER TO BIJLI CHADAI AT WARD NO 2 SIRANDER
C/O PBUND NEAR L/O MUMTAZ AHMAD WANI TO GH AHMAD WANI ON ROAD SIDE AT ARIN B
C/O RWALL ALONG SHALWARI ROAD NEAR L/O GH MOHAMMAD WANI AT KHERPORA ARIN B
C/O PWALL AND FILLING FROM MAIN ROAD TO MOHD AFZAL LONE
C/O LINING WALL WITH PATH ALONG NALLA BEHIND H/O LATE MANZOOR AHMAD SHEIKH (DRIVER) AND OTHERS AT KHERPORA
C/O PWALL NEAR H/O SHABIR AH NAJAR AND OTHERS AT WARD NO 4
C/O P-WALL NEAR H/O NAZIR AH NAJAR TO ONWARDS NEAR GRAVEYARD AT GUNDPORA RAMPORA
REPAIRING OF PATH FROM H/O LT MOHD SHABAN TO GH RASOOL LONE AT GUNDPORA RAMPORA
C/O TILE PATH FROM GH RASOOL MALIK AND OTHERS AT ARIN B
CONSTRUCTION OF CULVERT NEAR HOUSE MOHD YASIR WANI S/O NAZIR AHMAD WANI
CONSTRUCTION OF CC PATH AND FOOT CULVERT WITH DRAIN NEAR HOUSE OF GH MOHD WANI TO ORCHARD OF GULZAR AH WANI S/O AB
C/O PCC PATH FROM MAIN ROAD NEAR L/O ALI MOHD MIR AT ABU ZAR MASJID SHARIF MALIKPORA SUMLAR
C/O CRATE BUND NEAR MADRASSA AL BANAT UL MOMINEEN AT LANKERGUND WARD NO 1 GUNDPORA
DEVELOPMENT OF PANCHAYAT GHAR SURINDER
C/O P BUND NEAR H/O AB MAJEED LONE S/O LT GH MOHD ONE WARD NO 01
C/O FOOTPATH WITH DRAIN FROM NAGISTAN MASJID TO GH NABI WARD NO 07
C/O CC PATH MAIN ROAD TO H/O HABIBULLAH WANI (INMBEREDAR) AND OTHERS (TILEPATH)
CONSTRUCTION OF PWALL (1) NEAR HOUSE OF ZAHOOR AH S/O GH HASSAN (2) NEAR H/O MOHD SALEEM S/O AB RASHID (3) NEAR ORCHARD OF LATE AB GANI WANI S/O RAHIM WANI
FENCING OF PANCHAYAT GHAR T A SHAH PH 3RD AND FENCING OF GRAVEYARD SHOKBABA GOJARPATI WO 7 T A SHAH
CONSTRUCTION OF DRAIN WITH TRUSS PLATE AT GOVT MIDDLE SCHOOL T A SHAH
Outsourcing of Histopathology Services for PM JAY patients
C/O P/WALL AT NAID KHUL NEAR ORCHARD OF BASHIR AH LONE AND OTHERS
UPGRADATION/DEVELOPMENT OF SHEIKH KHUL FROM BAHAR ABAD UP TO SHAHGUND VIA VIJPARA
Replacement of existing worn out 10 cusec 10 m 60 HP pumping unit along with pipes bend, foot valve etc at Lift Irrigation DW Scheme Texoo
Fixation of rate Stage contract for various items pertaining to Divisional Store of Hydraulic Division Gurez for the financial year 2026-27 under various heads
fog lamp assy for scorpio, lock nut washer for scorpio, fuel filter, AC filter for scorpio, Relay for scorpio, Screw TPRF, Rubber plug, Flip seal window screen, Rubber plug dia 31, Rubber plug 25 x 30, rubber plug slot, damper hood, weather strip hood rear, kit floor assy center, cap driprail, fan belt for SML Amb, fuel filter rakshak plus, fuel water separator for SML Amb, hand brake cable for sml amb
washer for rakshak plus, washer for swaraj mazda Amb, turbo overhauling scorpio, injector overhauling scorpio, hose, rubber grommet for safari, timing belt for safari, gasket oil pump for safari, rubber hose crankcase to oil cooler for safari, gasket water pump for safari, gasket elbow to bypass pipe for safari, rubber hose uc pipe to EGR cooler for safari, hose coolant tube to pipe for safari, fan belt for rakshak plus, fan belt for safari, fan belt for sml amb, fuel filter for scorpio, fuel filter for sml amb, fuel filter for safari, fuel pipe for safari, fuel pipe 19 and 17 banjo rakshak plus, fuel relay 4 pin for safari, hand brake cable for safari, hand brake cable for rakshak plus, hand brake cable for sml amb, cyl head gasket for rakshak plus, hub stud nut and bolt for rakshak plus, radiator assy, knuckle bearing for scorpio, main relay 4 pin for safari, oil seal rear axle for rakshak plus, oil seal rear wheel for rakshak plus, oil seal front axle for rakshak plus
TYRE 245/75 R16 120/116 R/T/L (TYRE FOR RAKSHAK)
CONSTRUCTION OF FOOT STEPS AT CHITTAYBANDAY C NHO LATE MOHD QAIM MIR SO LATE AB REHMAN MIR
Stair Steps from wooden bridge to the House of Mukhtiyar Khan Aziz Khan and others with tile path Pyt Gujran Block Tulail 4th Call
Construction of CC Drain from Wooden Bridge to the House of Aziz Khan Manzoor Khan and others Pyt Gujran Block Tulail 4th Call
Development of GDC Tulail link Road B.W.O GSB filling,WBM G-II and C/O Causeway at Sheikhpora Tulail
PROCUREMENT OF KEY MATERIALS FOR VB-GRAMG WORKS FOR PANCHAYAT BADUAAB BLOCK TULAIL for the year 2026-27
PROCUREMENT OF KEY MATERIALS FOR VB-GRAMG WORKS FOR PANCHAYAT BUGLINDER A BLOCK TULAIL for the year 2026-27