Loading
Loading…
Loading…
772 results • Latest
Protection work at left bank of Jhelum and right bank of Open Channel (d/s of Dam)
SITC OF 42 POINT DUAL LINE CGLS SYSTEM FOR URI POWER STATION
Lot-III Electro-mechanical works package of 240 MW (2X120MW) Uri-I Stage-II H.E Project, Baramulla District of UT of J and K
Engagement of Consultant for preparation of DPR and Tender Document for PROPOSED INSTALLATION OF ARTIFICIAL SKI SURFACE/TURF WITH COVERED MAGIC CARPET AND SLOPE EXPANSION AT THE EXISTING SKI DRAG LIFT SLOPE, GULMARG