Loading…
Loading…
8,700 results • Latest
Pearl Millet Flour or Bajra Flour (V2) (Defence) (Q3) (3 (3 ))
desktop camputer
C/O PATH FROM H/O FAROOQ AHMAD BAJARD TO ONWARDS (W 10) AND C/O TILE PATH FROM H/O SAIYAN SOOD TO MASJID SHARIEF TUNGA W 11 UNDER ADP (PRI ) HALQA MAIDANAN BLOCK BONIYAR YEAR 2026-27
C/O DRAIN AT TUNGA PATTI WARD 4 AT SUMALI AND DRAIN FROM BASHIR TO ONWARDS WARD 7 AND DRAIN FROM MOHAMMAD SHAFI TO KAREEM WARD 8 UNDER ADP (DDC) HALQA MAIDANAN BLOCK BONIYAR YEAR 2026-27
CONSTRUCTION OF SINGLE SEATED FLUSH POINT NEAR MASJID SIDEEQ AT SIDEEQ COLONY LADOORA, SCHEME ADP(PRI) 2026-2027, BLOCK NADIHAL
CONSTRUCTION OF P. BUND AT GOUSIA COLONY NEAR H/O MOHAMMAD AKBAR MIR AND OTHERS AT LADOORA, SCHEME ADP(PRI) 2026-2027, BLOCK NADIHAL
CONSTRUCTION OF TILE PATH AT KARPORA LADOORA, SCHEME ADP(PRI) 2026-2027, BLOCK NADIHAL
FENCING 0F PUBLIC PARK AT ALLAHPORA WITH FENCING OF GRAVEYARD AT BUNSHARAN PYTT HALQA - LARKIPORA SCHEME ADP (PRI) FY -2026-27
DEVELOPMENT OF PANCHAYAT GHAR AT LARKIPORA PYTT HALQA - LARKIPORA BLOCK - HARDABOORA SCHEME ADP (PRI) FY -2026-27
DEVELOPMENT OF PUBLIC PARK AT HARDABOORA A PYTT HALQA - HARDABOORA A BLOCK - HARDABOORA SCHEME ADP (DDC) FY -2026-27
CONSTRUCTION OF DRAIN FROM BASHIR AHMAD PARRA TO GH MOHD PARRA AT LARKIPORA PYTT HALQA - LARKIPORA BLOCK - HARDABOORA SCHEME ADP (PRI) FY -2026-27
indoor FPV System
CONSTRUCTION OF TILE PATH AT AYUSHMAN AROGYA MANDIR AND PM SHRI HIGH SCHOOL, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, GOHAL TENGPORA, BLOCK, PATTAN.
CONSTRUCTION OF ROAD FROM BASHIR AHMAD BHAT TO FAROOQ AHMAD AND OTHERS, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, BURAN ZANGAM A, BLOCK, PATTAN.
IMPROVEMENT OF IRRIGATION CANAL BWO CC DRAIN VIA LAND OF AB HAMID WANI SHAHI HAMDAN COLONY NOWPORA B PANCHAYAT HALQA NOWPORA B PRI GRANTS, BLOCK SOPORE
Construction of Additional Multistorey Auction phar at F and V Market Sopore.
IMPROVEMENT OF SEKHAN KHUL WITH LINNING WALL BOTH SIDES AT RAKH HYGAM PANCHAYAT HALQA RAKH HYGAM PRI GRANTS, BLOCK SOPORE
DEVELOPMENT OF DRAIN FROM H/O GH RASOOL TANTRAY TO ONWARDS, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, PALHALLAN E, BLOCK, PATTAN.
CONSTRUCTION OF DRAIN FROM H/O GH NABI BAKSHI TO ONWARDS AT CHEK TAPPER, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, TAPPER WARIPORA, BLOCK, PATTAN.
CONSTRUCTION OF DRAIN FROM HOSPITAL TO HOUSE OF AB HAMEED DAR S/O AB SATAR DAR, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, GOHAL TENGPORA, BLOCK, PATTAN.
CONSTRUCTION OF DRAIN FROM H/O ABDUL RASHEED SOFI TO GHULAM NABI SOFI, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, PALHALLAN E, BLOCK, PATTAN.
CONSTRUCTION OF DRAIN FROM H/O AB LONE TO L/O HABIBULLAH LONE AND CONSTRUCTION OF DRAIN FROM H/O MANZOOR AHMAD KUMAR TO RAILWAY WITH FOOTSTEPS NHO SHAMIM AHMAD AND MUSHTAQ AHMAD, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, BURAN ZANGAM B, BLOCK, P
DEVELOPMENT WORK OF PANCHAYAT GHAR AT PALPORA, UNDER ADP (PRI) FY, 2026-27, PANCHAYAT HALQA, NILLAH PALPORA, BLOCK, PATTAN.
C/O ROAD FROM H/O FAROOQ AHMED MIR TO ONWARDS AT GANTMULLA PAYEEN UNDER (ADP PRI) .P/H GANTMULLA PAYEEN BLOCK NARWAHA
UP-GRADATION OF ROAD FROM GRAVEYARD TO H/O MANZOOR AH. WITH TILE PATH AT MALIK MOHALLA (HALQAGOKHAMA, BLOCK KUNZER) UNDER ADP (PRI) 2026-27
ESTABLISHMENT/ IMPROVEMENT OF PYT GHAR ALIED ITEMS AT GONIPORA. (HALQAGONIPORA, BLOCK KUNZER) UNDER ADP (PRI) 2026-27
P/WALL AROUND NEW GRAVEYARD NAMBLINAR YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
C/O P/BUND NEAR GRAVEYARD CHONTIPATHRI YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
C/O PATHS AT PANDITPORA NAMELY BASHIR AHMAD MIR TO AB RASHID MIR, FHO NAZIR AHG MALIK TO GH MOHD MIR, FHO AB SALAM LONE TO MOHD SULTAN MAGRAY, FHO GH MOHIDIN MIR TO HILAL AH MIR AND FHO GH QADIR RESHI TO BASHIR AH MIR YEAR 2026-27 BLOCK TANGMARG PANC
C/O TILE PATH NEAR MASJID SHARIEF BUNPORA CHONTIPATHRI YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
I/O ROAD AT RATHER MOHALLA NAMBLINAR YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
C/O FENCING AROUND MASJID SHARIEF AT PANDORI YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
FENCING AROUND GRAVEYARD AT ALPATHRI YEAR 2026-27 BLOCK TANGMARG PANCHAYAT BABARESHI ACTT HEAD ADP(PRI)
Repair of Op Track at 12 Inf Bde and 17 Inf Bde
Reqmt of Stores for TMG at 17 Inf Bde
Sorghum Flour or Jowar Flour (V2) (Defence) (Q3) (3 (3 ))
Supply and Construction of Combined Bathroom Toilets
Payload Dropping Drone (VTOL)
C/O CONCRETE DRAIN AT PLAYGROUND GORIWAN MERCHIPORA YEAR 2026-27 BLOCK TANGMARG PANCHAYAT PANDITHPORA ACTT HEAD ADP(PRI)
Calibration repair of Tonbo Sight Incl service charge (Regd No 116625)
Improvement of HT/LT lines including installation of transformers 03 nos 100kVA at different spots in Block Rohama of ESD Watergam
Custom Bid for Services - ONSITE REPAIR OF 01 SET OF GUIDE VANES OF URI POWER STATION Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Augmentation of 63kVA to 100kVA transformer at Ward no 04 Lari of ESD Mohura
Augmentation of 63kVA to 100kVA transformer at Ganie Mohalla Ward no 05 Trikanjan of ESD Mohura
Upgradation of 100kVA to 200kVA transformer for Bachi Ward no 5 6 and 7 of ESD Mohura
R and M of 250kVA substation along with shifting / relocation at Machis Factory Baramulla of ESD Baramulla 1st
Installation of electric wires and electric poles at ward no 1 and ward no 03 at Salamabad A of ESD Mohura
Installation of 63kVA transformer at Brezwachan of ESD Wagoora
Shifting of Transformer near jamia masjid Usman Ward no-3 and shifting of transformer at ward no- 2 of ESD Mohura