Loading…
Loading…
8,967 results • Latest
Construction of Resource room at Higher Secondary School Chandoosa
Construction of elementry Boundary wall at Girls Middle School Larridora zone Fatehgrah
Construction of elementary Boundary wall at Girls Middle School Gujjar Patti Kalayban Zone Fatehgrah
Vehicle Hiring Service - Per Vehicle-Day basis - SUV/MUV; 2025, 2024, 2023, 2022, 2021; Local + Outstation; Plain and Hilly both; 250Kms x 8Hrs; Round Trip
Implementation of Upgraded ISO/IEC 27001: 2022 Standard at Uri Power Station.
Suspension bush complete kit, Brake Shoe, Synchroniser Ring set, Complete gear assy set, Main Shaft Assy, Gear Box Hub Assy, Gear Box release Brg Assy, Tie Rod Assy, Fan Belt, Crown Wheel Brg, Spacer Brg Lock, Spacer Ring Lock, Piston Ring, Solenoid Switch 24V, CR Bearing, Cam Shaft Assy, Cam Bush Set, Head Gasket, Oil Filter, Fuel Filter, Water Separator, Engine Packing set Complete
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) (3 (3 ))
Solenoid Operated Valve, Injector Nozzle, Pump Housing, Distributor Head, Vane Pump, Tank Collant Vehicular, Clutch Master Cyl, Adjusting Pin, Friction Washer
Clutch Disc Assy, Cover Assy, Disc Clutch, Brg Clutch Release, Cable Assy Complete, Pull Cable Accelerator, Assy Propeller Shaft, Reverse Light Switch, Pressure Plate Assy, Clutch Release Brg, Clutch Maste Cyl, Brush Gear Assy, Bush King Pin
Repair and Overhauling Service - cars; Injector spindle kit replace of 04 nos nozzle and over hauling with FIP pump overhauling of Bolero; Yes; Buyer Premises
Combination switch, Head light assy, Clutch plate, Condenser assy, Fuel tank, Intercooler, Silencer assy, Starter, Steering ball joint set, Radiator, Steering box assy, Drive assy, Door visors
Repair and routine maintenance of Building Pertaining to RnB Division Baramulla for the year 2026-27
REPLACEMENT OF 110V 2X55 NO 300AH BATTERY BANK AT GRID SUBSTATION SHEERI UNDER JURISDICTION OF TLMDIII AMARGARH
CM/KND/NIV/CL2/50 UNDERPANT WOOLLEN (IMP VER) SIZE - 105CM
Clutch plate, Pressure plate, Break shoes, Break booster assy, wheel disk, Caliper assy, Oil filter, Self startor, Alternator, Air filter, Accelerator sensor
Procurement of Data wall or display system for unit
SPL REPAIR TO BLDG NO T-27 (C COY LINE) AND T-30 (A COY LINE) AT PATTAN UNDER GE 969 EWS
Construction of ACR at Primary School Chopanpati Sultanpora Chandoosa.
Major Repair of School building PS DEH Kanispora
Modular climate control bin CRCA powder coated single layer
Major repair of school building SSA (PS) Saloosa (Lone Mohalla), Zone Wagoora.
Supply Installation Testing and Commissioning of Shaft Sleeve of Unit-I and Unit-III of LJHP Power House
UPC MODULE FOR NEYRPIC T. SLG WITH EXISTING SOFTWARE VERSION FOR URI-II PS, SPC MODULE FOR NEYRPIC T. SLG WITH EXISTING SOFTWARE VERSION FOR URI-II POWER STATION
Maximile Transmission Oil, DAFC 50, DOT4, Maximile Ultra Engine Oil 5W30, Power Steering Fluid
MEAT DRESSED FROZEN
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) (3 (3 ))
REPAIR/REPLACEMENT TO ROOF SHEET, SCANTLING, WOODEN JOINERY,FLOORING AT PATTAN UNDER GE 969 EWS
HOSE PART NO. 30Z7180441, HOSE PART NO. 727101460, HOSE PART NO. 727101470, HOSE PART NO. 30Z6180529, HOSE PART NO. 30Z6180489, HOSE PART NO. 160EC61105, HOSE PART NO. 160EC61113, CLAMP PART NO. CCC0108020, HOSE PART NO. 160PS91009, HOSE ASSY PART NO. 157PH02209, CUT HOSE PART NO. CHH3029922, HOSE PART NO. 160PH91166, HOSE PART NO. CHH2200608, HOSE PART NO. CHH2210612
Repairing of 100 KVA HT transformer at Lift irrigation scheme Sohkhul Goshbugh of MISD Pattan.
Custom Bid for Services - Comprehensive AMC of Two (02 nos) 20KVA UPS and One (01 no) 20KVA lighting inverter for 2 years (4 visits per year) installed at Uri-II power Station Similar Category AMC/CAMC of Hydro Energy Power Plants
REPAIR/MAINT/REPLACEMENT OF SECURITY LIGHT INCLUDING FIXTURE AND FITTINGS AT BARAMULLA, PATTAN, GULMARG, HAWS UNDER GE 969 EWS
Construction of Road from PMGSY road Gwalta to Dhariyan and Construction of 1x17 mtr span plate girder Bridge on Nallah Gwalta
PT Uniform ( Sports Shorts ) - Defence (Q2) (3 (3 ))
Engagement of Consultant for carrying out the Feasibility Study and Preparation of Bankable Detailed Project Report Imported for proposed Passenger Ropeway at Khadniyar, District Baramulla, Kashmir on PPP mode.
Major Repair of School building GPS Branwari Zone Baramulla
Major Repair of School building PS Frasdub Zone Singhpora Kalan
HYDRAULIC HOSE, STEERING HOSE, STEERING FILTER, FUEL STRAINER CAPE, BEARING REAR AXLE, CLUTCH SEAL, TRANSMISSION SERVICE KIT, MAIN CLUTCH SERVICE KIT, FUEL FILTER, OIL FILTER
Major Repair of School building MS Takiya Zone Singhpora Kalan
Construction of Concrete Bedding and Tin Fencing around SWM at Hardi Bani Kunzer.
Construction of Dilapidated Primary at Primary School Gundaripora (Excluding Electrification)
Construction of Biology lab and library Room (Excluding Electrification) at Boys Higher Secondary School Gund Khawaja Qasim Pattan
Construction of Art Craft Room libaray Room and Science Room (Execluding Electrification) at High School Hammaray
Manpower for Operation, Upkeep and Maintenance of Gulmarg Golf Course
Major repair of school building MS (SSA) Athoora Payeen, Zone Wagoora.
Major repair of school building BMS Burzwachan, Zone Wagoora.