8,856 results • Latest
Lanes and Drains of Sopore Town.
Fencing around dumping site/ proposed land for solid waste Management in estate Dharnambal Tehsil Sopore.
COMPLETE RECONDITIONING OVERHAULING OF EXISTING 630KVA AVR MEANT FOR AUXILIARY POWER SUPPLY TO POWER HOUSE.
COMPLETE RECONDITIONING AND OVERHAULING AND REVIVAL OF DAMAGED 250KVA AVR (LT-LT) MEANT FOR REGULATING AND STABILIZATION OF UNIT AUXILIARY SUPPLY AT LJHP POWER HOUSE.
Development of Play field by way of leveling, filling and constr. of sitting arrangement and changing room and flood lights at Jagir Ghat Sopore.
Dev. OF CFC at Behrampora, Panchayat Behrampora B, under Scheme ADP(PRI). (2026-27)
C/o Lanes and Drains different spots Behrampora B, Panchayat Behrampora B under Scheme ADP(PRI). (2026-27)
NUTRITION ITEMS FOR ICDS
C/o Lanes and Drains different spots Behrampora A, Panchayat Behrampora A, under Scheme ADP(PRI). (2026-27)
Y-Junction to Salamdeedar (erstwhiile part of NH-701A Baramulla to Y-Junction road KM-21 to KM-33.83) under permanent restoration-SASCI-1
Up-gradation/ Improvement of BRC at Tangmarg Zone Tangmarg.
Construction of Patwar Khana at Hayatpora Tangmarg Baramulla.
Construction of Nayabat Office Hariwatnoo Baramulla
Construction of Nayabat Office Chukar Baramulla.
Construction of Nayabat Office HQ Kunzer Baramulla
Construction of Nayabat Office Hajibal Baramulla
C/o Fencing G. Yard and Dev. Of Drain on main road to onwards at Budden Panchayat Saripara, under Scheme ADP(PRI). (2026-27)
Fencing of Eidgah and Fencing GMS Yarbugh, Panchayat Yarbugh, under Scheme ADP(PRI). (2026-27)
CONNECTING ROD OF GEN SET 2 KVA, BIG END CELL OF GEN SET 2 KVA, HEAD VALVE OF GEN SET 2 KVA, PISTON AND RING SET OF GEN SET 2 KVA, PACKING SET OF GEN SET 2 KVA, AVR OF GEN SET 2 KVA, SLEEVE OF GEN SET 2 KVA, OIL FILTER ASSY OF GEN SET 2 KVA, FUEL FILTER ASSY OF GEN SET 2 KVA
C/o Langer Khana at Gurduwara Yarbug, Panchayat Yarbug under Scheme ADP(PRI). (2026-27)
Up-gradation of Road at New Colony Waripora Barzulla upto Main Road
Construction of Toilet Block at BHS Shouch Palpora Zone Nehalpora.
Fencing / Protection / Retention wall of MC Park at Tangmarg near Jamia Masjid (Phase 1st).
Raising of Existing Crate work b.w.o R/R Masonary wall near house of Arshid Ahmad Tanga and Others on Sangri Nallah.
Flood Protection Work by way of crate work on Nallah Nageen at Budan near house of Ajaz Ahmad Bhat
Soil and Moisture conservation work in Co.25 K of Yamberzalwari Range Kandi.
Construction of Crate Protection Work on Venmi Nallah near Land of Nazir Ahmad Dar and others at Malpora
Construction of Ghat on Right side Embankment of OFC at Badambagh Sopore
Construction of RR Masonry Wall near house of Tanveer Ahmad Khan at Cherdari Nallah
Flood Protection work by way of crate work on Nallah Nageen at Budan near House of Gh. Nabi Bhat and Mohd. Saleem Bhat
Construction of Flood Protection work by way of crate work at Tragpora near house of Nazir Ahmad Najar and Farooq Ahmad Najar
Construction of Flood Protection Work by way of crate work at Dandoosa near Namji Head
Construction of Flood Protection Work b.w.o R/R Masonary on Roni Nallah near House of Mohd Asadullah Sheikh and Others.
Construction of Flood Protection Work b.w.o. RR Masonry near house of Rubeena Begum w/o Isaq Nazir on Fatehpora Nallah
Up-gradation of road from PMGSY road Ringawali to Kohli Mohalla from H/O of Mohd. Ayoub and others Tangmarg
Construction of Flood Protection Work by way of crate work on Binner Nallah near Masjid Usman
Link Roads of Wussan Village (Balance) by way of G-2nd 75mm Thick Wet Mix, 50mm thick BT, 25mm thick Semi dense with 6mm thick seal coat
CONST OF TILE PATH various spots at umer mohalla Pyt. Mughalpora Block. Khaipora under . ADP(PRI) year.2026-2027
Dev. of Park at Dandoosa near Ziyarat, Panchayat Dandoosa under Scheme ADP(DDC). (2026-27)
Macadamisation of Moominabad road at Shirpora by way of G-2nd 75mm Thick Wet Mix, 50mm thick BT, 25mm thick Semi dense with 6mm thick seal coat
Construction of Crate Protection work on Venmi Nallah near House of Gh Hassan Thoker and Others.
Construction of Crate Protection Work near land of Aashiq Ahmad Khan on Upper Sangri Nallah
Upgradation of Hurcheck Nehalpora Road
Construction of Synthetic volleyball and Badminton Courts at HSS Mirgund..
Fabrication of Aluminum Cabins (04 No.) for Staff at Divisional Office, Baramulla
CONST. of fencing graveyard umer mohalla Pyt. Mughalpora Block. Khaipora under . ADP(PRI) year.2026-2027
AMC Of 02 Nos Bauer Make HP Compressors Of Power House Of Uri Power Station For 03 Years