Loading…
Loading…
1,626 results • Latest
Vikas Khand Khalilabad mein Jas Vi Deva Hata pitch marg se jagannath chaudhary adarsh inter college hote huye mathurapur tak interlocking road nirman karya
Vikas Khand Semeriyawa mein gram asnhara mein sharavan pande ke ghar se kathinaiya nadi ke pul tak interlocking road nirman karya
Vikas Khand Khalilabad Gram Belpokhari road se anteyasthi sthal marg par interlocking road nirman karya
Vikas Khand Khalilabad Gram Gadsarpar Manjhariya road se ferusa nahar patari par interlocking road nirman karya
Vikas Khand Khalilabad gram panchyat rasulabad NH 28 ke patnahi mata ji ke mandir tak interlocking road nirman karya
Vikas Khand Semeriyawa mein jagdishpur urf lahuradeva prathmik school ke bagal se harijan basti avm jawaharlal tripathi ke makan tak interlocking karya
Vikas Khand Semeriyawa gram kohariyawa telpurwa se kohariyawa keshwapur marg tak interlocking karya
Vikas Khand Haisar bazar chakiya pitch road kali ji sthan hote huye bhola kumhar ke ghar tak interlocking karya
Vikas Khand Haisar bazar rupin marg se suraina sampark marg tak interlocking nirman karya
Vikas Khand Nathnagar khajuriya raja nahar se badarwa prahlad nav ke ghar tak interlocking road nirman karya
Vikas Khand nathnagar ke gram panchyat githni raghav ke ghar se nanhu ke ghar tak interlocking karya
Vikas Khand nathnagar ke gram panchyat balhi se githni siwan tak interlocking road nirman karya
Vikas Khand Bankati ke gram panchyat kathaicha cc road se badgopur hote huye gosaijote sarhad par interlocking tak pitch road nirman karya
Vikas Khand Parasrampur ke madnapur tower se sameep(Bagal) se nandnagar newada marg udaypur tak pitch road nirman karya
Vikas Khand Bahadurpur mein gauriya pitch road se daulat chak pitch road tak pitch nirman karya.
Gram Sabha Sandpur mein khanan singh ke ghar se hanuman mandir hote huye harijan basti tak pitch avm cc road nirman karya
Vikas Khand Bankati mein kakrauli harijan basti se khirihwa Puliya tak pitch nirman karya
Vikas Khand Hanumanganj suruwar kala marg se kudi khuthna bankatiya mein pitch road nirman karya
Bansi Dhani marg par sakarpar pul se sonaura gaon tak pitch road nirman karya
Vikas Khand Itwa ke rasoolpur se semra mod tak lepan karya
Deipar Bhiriya Marg par Isthit Rehrwa Chaurahe se suratgarh marg ka awashesh bhag ke cc road nirman karya
Vikas Khand Gaur mein belwariya jungle gram sabha mein kanta bagiya se ramji soni ke makan tak cc marg ka nirman karya
Vikas Khand Gaur mein babhnan sonha sampark marg par chamrahiya purwa ke baburam ke ghar se banglwa purwa ke ram dheeraj ke ghar tak pitch road ka nirman karya
Annual repair work of residential building of type-2 Mukhtarakhana DM office campus,CDO office campus,Mahuli tiraha,near dak bangala,near harijan chhatrawas of departmental / pooled housing
Annual repair work of residential building of type-4 (at Ladies Club, Dak Bangala, Chandmari, Harijan Chhatrawas) of departmental / pooled housing
Annual repair work of Non - Residential building of departmental / pooled housing.
Construction of Repair work at Rajkiya Anusuchit jati Hostel (New) Civil Line Distt Basti
Construction of a 4 seater Pink toilet near Amhat Ghat
Construction of a boundary wall, drain, and pathway for water conservation at the pond located in Ward No. 21, Rameshwarpuri Babhangaon (eastern side)
Construction of a CC (cement concrete) road in Ward No. 23, Mishrauliya, extending from Pachpedia Culvert to the area beyond Makrana Marble.
Construction of a 4 seater community toilet, a 5 seater Pink toilet, a 3 seater urinal, a bathroom, a care taker room, and a boundary wall in Ward No. 10, Malitola.
Construction of 3 toilet units within the Kateshwar Park premises in Ward No. 19, Orijot
Renovation of the community toilet (comprising 8 toilet units and 2 urinal units) located in Ward No. 11, Pathan Tola.
Construction of a park in Ward No. 23, Awas Vikas.
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3)
Sambhagiya Sahayak Sambhagiya Parivahan Karyalay Basti Ke Anurakshan Marammat ka karya
CONSTRCUTION O RANIPUR LAD TO KALIMATA MANDIR ROAD KA AWASHESH BHAG ROAD
Construction of C type tower at Bhitaria pump canal on rapti rever crossing for 33 kv line khantara emanation from 132 33 kv ss dumariyaganj siddharthngar and construction of C type tower in 33 kv line rewa on rapti crossing near village pachaus
RENEWAL OF TINICH KAPTANGANJ TO BANDARKHAL ROAD
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), Octagonal Pole (V2) (Q3)
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Workshop; Complete Execution of Activity; Buyer premise; Full day
High End Multipara Monitor (V3) (Q2)
Annual repair work of residential building of type-1 of departmental / pooled housing