Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
180 live109 closing this weekmost from Department Of Atomic Energy and TELANGANA POWER GENERATION CORPORATION LIMITED
180 results • Latest
Manufacture, inspection, testing, packing and safe supply of 500Nos. of high density graphite caps
Supply of 100KVA, 415/400V Dry type transformer as per Annexure-A
Bayonet Lampholders (V2) ISIMarkedto IS1258 (Q2)
Polyscience make kit for Pump head & Motor with fittings for recirculating chiller
DC solar cable, color: Black, Color: Red
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2), Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS 15549 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Non Modular Piano Type Domestic Electrical Switches ISI Marked To IS 3854 (Q2), Capacitors for Electric Fan Motors as per IS 1709 (V2) (Q3), Non Modular Piano Type Domestic Fan Regulator Conforming To IS 11037 (V2) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Hylam Sheet for Electrical Switch Board-13x11 inches ass per Annexure-I, Hylam Sheet for Electrical Switch Board- 12x12 inches ass per Annexure-II, Hylam Sheet for Electrical Switch Board-8x8 inches ass per Annexure-III
Repairs to damaged drains in Rudrampur, Gowthampur and Dhanbad, Kothagudem area
HT XLPE Cable 6.6 KV 3C-185 AL ARMOURED
High density poly ethylene HDPE bags as per enclosed technical specification
SUPPLY OF HYDRATED LIME CONFIRMING TO IS: 1540-1990 GRADE-A ON AS AND WHEN REQUIRED BASIS
Firefighting Equipment Checking and Maintenance of HWP(M)
Strainer Kitfor Compressor Model AC540of M/s Burton
Hastalloy-C (C-276) Pressure Transmitters Range: 1-100 Bar as per Annexure-I, SS316L Electronic Differential Pressure Transmitters Range: 0.13-13 mtr- WC as per Annexure-II, SS316L Electronic Differential Pressure Transmitters Range: 0.5-50 mtr- WC as per Annexure-II
Construction of Mini Water Tank at Sub Market Yard Tekulapally Under AMC Yellandu. Kothagudem District. ( 3rd Call Tender )
Earthwork in formation (Cutting and Banking) and Construction of Bridges for Railway Siding and Marshalling Yard for (4x270MW) BTPS, Manuguru, Bhadradri Kothagudem District
PACKAGE-IX - KOTHAGUDEM CONSTITUENCY - NO.OF WORKS 02 - TOTAL EST COST RS. 40.00 LAKHS (1/2) CONSTRUCTION OF COMMUNITY HALL AT CHATAKONDA GP IN LAXMIDEVIPALLY MANDAL EST.COST. RS.15.00 LAKHS (2/2) CONSTRUCTION OF COMMUNITY HALL AT KOTHAGUDEM IN CHUNCHUPALLI MANDAL OF BHADRADRI KOTHAGUDEM DISTRICT. EST COST RS. 25.00 LAKHS
TGGENCO - BTPS (4X270MW) - Clearing of jungle and babul trees to facilitate for plantation over soil heap at reservoir and track hopper area at BTPS, Manuguru.
M and R and other miscellaneous works to public buildings at Kothagudem area for the year 2026-27
KTPS-V-CAM-Rubber lining of certain Tanks in DM plant 2x250MW and 1x500MW Units-Reg
Servicing and Testing of Plug Valves during MTA 2027 in Main Plant of HWPM
Flange joints maintenance work in XU 1 during MTA 2027 at Main Plant of Heavy Water Plant Manuguru
Removal and re fixing of Plug Valves during MTA 2027 in XU 1 of Main Plant in HWPM
Tadiran Lithium Thionyl Chloride AA Non Rechargeable Batteries (SL-360/S) as per Annexure-A
Manufacturing and Supply of Top seal components for Plug
Diaphragm valves and Spare Diaphragms of BDK make Weir
Rupture Discs and Ferry Cap Screws in sizes and
Construction of Brick pedestals with CM(1:5) at Upstream side of Bund and over deposited ash to extend the existing ash slurry disposal points of Stage - I and II into the pond -1 for effective utilization of capacity of ash pond - 1 at BTPS
M and R and other Misc.works for Singareni Coony, for a period of one year i.e., 2026-27, Yellandu Area, BK Dist, TG.
M and R and other Misc.works for Mines and Office buildings at KOCP including repairs to Coal Transport Road from KOCP to Railway gate near Central work shop at kothagudem, for a period of one year i.e.,2026-27, Yellandu Area, BK Dist, TG.
Emergency reparis by providing Dors and water supply to the R and B Sub-Division office at Aswaraopeta in Bhadradri Kothagudem
FDR to Re-Construction of compound wall to R and B inspection Bunglow at Yellandu in Bhadradri Kothagudem district
Construction of Toilets and Bath Rooms to AGHS Ulvanoor (V) Palvancha (M) in Bhadradri Kothagudem District
FDR to Existing Building of R and B Cicle Office at Kothagudem in Bhadradri Kothagudem District 2nd call
Construction of BC welfare Hosterl (pre and post Metric) Kothagudem Mandal in Bhadradri Kothagudem District Sub work Laying of Balance Ground floor slab to BC welafare Hostel (Pre and post metric kothagudem Mandal in Bhadradri Kothagudem district 4 th call
FDR to approaches of HLB at Km 6/0 of PWD Road to Rukma Thanda via Rollapadu in Bhadradri Kothagudem District 2nd cll
Providing Iron Sheeting at Singareni Ground ( Beside fore office) in Yellandu in Bhadradri Kothagudem District 2nd call
Repairs to windows and doors,erection of meeting shed and other miscellaneous repairs to MLA Camp Office located at YEllandu in Bhadradri Kothagudem DIstrict 3 rd call
BTPS - CHP - Clearing of chute jams from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division for a period of 03 months i.e from 01.01.2027 or from actual date of commencement of work
Repairs to inspection Bunglow at Yellandu in Bhadradri Kothagudem District
BTPS - CHP - Checking of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor in Operation and Electrical/CHP/BTPS for a period of 03 months i.e. from 01.01.2027 or from actual date of commencement of work..
TGGENCO-BTPS-STAGE-II- CAM Division-180 degree Angular Rotation of Ash Slurry Disposal Line-1,2 and 3 from Ash Slurry Pump House to plant boundary wall during the year 2026-27
Supply of Sodium Hydro Sulphide Solution (NaHS on 100% Basis) as per enclosed specifications
electricalpurpose (V2) ISImarkedto IS7809 (Part3/Sec1) (Q2)
KTPS-VII Stage-CAM-Divn:Laying of 200NB or 150NB pipes of fire fighting system in pipe rack pertaining to ash plant from TP 8 area to H2 cylinder storage shed for providing of fire fighting points to avoid onto ward incidents in KTPS VII Stage
KTPS-VIIStage-CAM-Divn:Replacement of piston rings of compressors of KIRLOSKAR make 2Nos KWK 390.24 water cooled screw chillers model AC units in UCB A C plant of KTPS VII Stage