Loading…
Loading…
678 results • Latest
BM-Divn:Charges for Stress relieving and radiographic testing of HP welded joints during the ESD works for the year 2026 27
BM-Divn:Annual Contract for oil sample analysis of lube oils used in Fans APH and Mills for the year 2026 27
CAm-Divn:Repairs Servicing and Overhauling of Ms Bitzer make model CSH6563 60Y 40P Compressor and installation erection and commissioning works of TAC air dryer in TAC discharge air line of fly ash system in KTPS VII Stage
BM-Divn:Charges for arresting the steam leak from various HP valves on Boiler 12 as and when required during the year 2026 27
IC -Divn:Service Charges towards Annual maintenance contract offer for 6Nos PLC system 3nos GE intelligent platform PLC system 2Nos Schneider PLC System and 1No Honeywell PLC system for FY 2026 27
CAM Divn Certain 200 or 250 NB MS or CI Coupling gaskets along with ash intake valve and poke dummy gaskets replacement work in ESP passes as and when required during the 2026 27
CAM-Divn:Service Charges for deputation of service engineer to attend servicing or Overhauling of 4Nos of Chlorination strams which are available in CW Chlorination plant of KTPS VII Stage Paloncha for the year 2026 27
Biennial contract for rewinding of LT motors at CPP-2026
CAM-Divn:Annual maintenance contract of 100T weighbridges 2Nos in fly ash handling system for a period of one year from the date of commencement of service PO for the FY 2026 27
TM:Divn Testing of Fyrquel EHC N oil samples of Main HPSU skid, LPBP HPSU skid and Servo prime 46 oil used in MOT TDBFP A and B and Servo conval 46 oil used in HPBP HPSU Skid as and when required During the year 2026 27
BM -Divn:Charges for Deputation of service personnel along with equipments to carry out heat treatment works for replacement of grinding rolls from Journal hub of HP1103 Bowl mills as and when required during the year 2026 2027
CAM-Divn-Servicing charges for overhauling of 4Nos dryers instrument air plant area 2 nos model SI 080DA and instrument air silo area 2 nos model SI 040DA in fly ash handling system of KTPS VII Stage as and when required during the FY 2026 27
Tm-Divn:Labour Charges towards HP welding works for replacement of high pressure damaged and erodedlines and valves in TM Division during the year 2026 27
CAM-Divn:Certain inspection and replacement of filter bags and cages of vent filter at silo area and buffer hoppers at ESP area as and when required in CAM division during the FY 2026 27
Servicing charges for overhauling of 3 Nos of Package AC units in Hitachi AHP PLCC Control room and 3 Nos of Stulz make Package AC units in MCR Control room of KTPS VII Stage Paloncha ( Total 6 Nos of Package AC systems as and when required during the FY 2026-27
CAM-Divn:Servicing Charges for Overhauling of 3Nos.TAC air Dryers make mellcon model CSt 91 in fly ash handling System of KTPS VII Stage as and when required during the FY 2026 27
Gate valve, size: 1.5" x 300 Class as per Annexure I and TS, size: 2" x 300 Class as per Annexure I and TS, size: 3" x 300 Class as per Annexure I and TS
Providing of 1 No Jeep or Bolero including driver salary,fuel charges, fixed charges and maintenance charges, road taxes, Insurance, all statutory payments etc on hire basis at 12 hours per day for a mileage up to 1500KM per Month for the official utilization of Divisional Engineer BM OandM KTPS-VII-stage for the period w.e.f 01-04-2026 from the actual date of commencement to 31.03.2027
CAm-Divn-Annual maintenance contract AMC for Ingersoll rand I Ltd make 2nos instrument air compressors model SM55 AC at silo area in fly ash handling system of KTPS VII Stage for the FY 2026 27
IC-Divn:Service Charges for deputation of service engineer towards repair and rectification of M/s.HACH Make sodium and silica analyzers located at CPU service area and DM plant area for FY 2026 27
KTPS-VII Stage-TM Division- Complete overhaul of Planetary gear box of debris filter system in condenser inlet pipe line during any unit emergencies for the year 2026-27
Labour charges for Servicing overhauling of 3 Nos dryers Instrument Air compressors model FX 20 W in the compressor house of KTPS VII stage as and when required during the FY 2026 27
BM-Divn:Reconditionin g or Refurbishment of used coal compartment assemblies of KTPS VII Satge 1X800MW Boiler
CAM-Divn:Service charges for deputation of Service engineer to attend servicing of Ms Greaves cotton make diesel engine pertaining to Hydrant booster pump of fire fighting system in KTPS VII Stage paloncha for four visits in FY 2026 27
CAm-Divn:Annual maintenance contract of CUMMINS make 2Nos DIESEL ENGINE Model 4BTAA 62.5KVA pertaining to wet ash system of KTPS VII Stage paloncha in FY 2026 27
CAM:Divn: Repairing and Reconditioning of 300NB knife gate valves of of silo unloading system in Fly Ash handling system as and when required during the year 2026 27
TM :Divn:Certain machining works to be carried out during the year 2026 27
TM-Divn:Thermal insulation and spray insulation works to be carried out during emergency or running maintenance as and when required during the year 2026 27
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.07.2026.
Annual Maintenance of Rolling Shutters, M.S. gates and other miscellaneous structural steel works in HWPM colony for the year 2026-2027.
SRLIP Distributary Package No.3 Earthwork excavation, forming of embankment, providing CC lining, and construction of CM and CD works for formation of 19R Distributory (at Km 100.225 on main canal of SRLIP) from Km 0.00 near Vinobhanagar (V) to Km 14.125 near Sujatha nagar (V), Julurupadu (M), Bhadradri Kothagudem (District), 20R Distributory (at Km 101.400 on main canal of SRLIP) from Km 0.00 near Vinobhanagar (V) to Km 15.500 near Vinobhanagar (V) , Julurupadu (M), Bhadradri Kothagudem (District) and Distributories of 21L Branch canal (at Km 113.500 on main canal of SRLIP) from Km 0.000 near cheemalapahad (V), Singareni (M), Khammam (District) to Km 20.800 near Jastipalli (V), Kamepalli (M), Khammam District including formation of minors and subminors with CM and CD works
Redevelopment and Rejuvenation of Sree Seetha Ramachandraswamy Vari Devasthanam, Bhadrachalam including expansion and infrastructure Development of Temple Complex, Temple Precinct and immediate surrounding projects under Phase -I - 2nd call
Aluminium cladding sheet in rolls as per annexure - TS
Supply and Installation of Passive Fire Protection System for cables at Substations of Mainplant 2026.
Providing Manpower with T and Ps to carry out erection of 02 nos Wet Ball Mill for FGD system
Renovation of Training Hall 3 of works building and providing and fixing aluminium partition works at open area in front of recruitment section as video conference room.
Providing Elevated Morcha near East Gate and Watch Tower near Coal Handling Plant (CHP) at HWPM.
Temporary Illumination arrangements at Godavari ghat for Ganesh Nimajjanam 2026 on rental basis
Reconstruction of Sri Kodanda Ramalayam, Ramachandrapuram (V), Mulakalapalli (M), Bhadradri Kothagudem District
ER to Bhadrachalam - Chandrupatla road from Km 40/0 to 65/0 in Bhadradri Kothagudem District 2nd call
ER to Bhadrachalam to Chandrupatla road from Km 0/4-2/2 and 10/0-40/0 in Bhadradri Kothagudem District-3rd call
Laying of CC roads in Fish market area and Aadivasi Colony in Manuguru Municipality
Construction of Dormitory to STGH Cherla (V) of Cherla (M) in Bhadradri Kothagudem District
PAL - Unit XVIII: Pulp wood: Felling of Eucalyptus trees, conversion of billets up to 13 cm girth into 1.00 mtr. to 1.50 mtr. long billets, debarking and stacking. Faggot wood: Conversion of below 13 cm girth and harvesting of enumerated dried trees into 1 mtr billets and stacking.
Carrying Out Miscellaneous Electrical cable laying work and LDB readiness as NITTCC chapterIII clause no 2 for the Closure of Pending Points at 4X270 MW BTPS Project
Supply of self cleaning strainer mechanical seal
M and R to water supply lines and supply of materials to Ramavaram, 3 and 4 incline, Kothagudem area for the year 2025-26
Laying of CC road from New Panchaayt Office Building to Morredu vagu at Mangapeta in Kothagudem Corporation under Nagarabhivrudhi
Repairs to the Flooring and aPainting of Bus station Yellandu in Bhadradri Kothagudem District (D)
Laying of CC Road from Palthiya Badri (H) to Crematorium at Mangapeta in Kothagudem Corporat ion under Nagarabruvrudhi