Running Maintenance of Air Compressors, Boiler Feed Pumps, Fuel Oil Transfer Pumps, Chemical dosing pumps and Ammonia system etc. of Boiler group at CPP
Silica gel breather, silica gel of 1 kg qty capacity as per Technical specification
Hydraulic Governing Oil Filter element for TG 1, 2 as per Annexure TS and attached drawing
Pedestal mount type fan, 600mm sweep, Industrial purpose, 1-ph, as per technical specifications
Material Code: W90318103168 RTDS FOR OIL PURIFICATION UNIT: 1 NO EACH TYPE AND RANGE FOR BHADRADRI PRO, MATERIAL CODE: W90318103192 LEVEL SWITCH FOR OIL PURIFICATION UNIT: 1 NO. OF EACH TYPE AND RANGE, Material Code: W90318103206 FLOW METER/INDICATOR FOR OPU SPEC: ST39013 REV: 08, Material Code: WS9818103637 LT SWITCH GEAR ITEM FOR OPU AS PER DRAWING NO 41810E11002 AND SPEC NO ST
Construction of Annadana Building at Sri Gouthameshwara Swamy Temple, Manthani (V and M), Peddapalli District
BTPS-CHP-Removal of spilled over coal, fine dust and wet coal of BCN-3A/B tunnel, FG-5 and 6 floor at TP-2, ground portal, gallery and head end areas and contigency-1 and 2 area of 3A/B including FG floors and reclaim belt conveyor and reclaim chain feeders by head loads on to running conveyor feeders as and when required in MM-I subdivision of MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
BTPS - CHP - Removal/lifting of spilled coal from counter weight areas of BCN- 3AB and below the conveyor galleries of BCN 3A/3B, outside areas of TP-1, TP-2, Crusher house area, TP3, TP4, TP5, conveyor BCN-4A/4B, 5A/5B, BCN 6A/6B, 7A/7B and below all the conveyor galleries and transporting to stock piles yards for the FY-2026-27
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS/Sail Hard liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-1A/B, 2A/B, AFD-1 and 2 and connecting chutes at TP-1 and FG-1,2,3 and 4, BCN-3A/3B and connecting chutes at TP-2 and FG-5 and 6 and contingency-1 and 2 chutes in MM-I Sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
BTPS - CHP - Replacement of new/reconditioned flap gates, diversion plates, actuators, guide pipes, counter weight structer, oil top up and greasing, belt sway, etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN-1A/1B, BCN-2A/2B, BCN-3A/B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 from 01.04.2026 or actual date of commencement of work to 31.03.2027 required in MM-I sub division of MM/CHP/BTPS.
BTPS - CHP - Replacement of New/Reconditioned rollers and frames, fabrication and erection of skirt rubber, scrappers etc. for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN - 1A/1B, BCN - 2A/2B, BCN - 3A/3B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 in MM- I sub division in MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027
BTPS - CHP - Maintenance of conveyor equipment viz pulleys, bearings/sleeves of pulleys, realignment and Geared coupling, periodical and breakdown works as and when required for the conveyors-BCN-1A/1B, 2A/2B, 3A/3B, reclaim belt conveyors-1 and 2, ILMS and flap gates required in MM-I subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Up-Keeping and cleaning of all field control panels, VGF panels, VFD panels, SM and ILMS Rectifier panels, Lighting LPs, Power and control JBs, LPBS, Sump Pumps along with their panels, all LT PMCCs, from BCN-1A/1B to BCN-3A in all TPs and up to Crusher House etc. in LT-I subdivision of Operation and Electrical/CHP/BTPS for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027
PURCHASE OF LED LIGHTS FOR MAINTENANCE OF STREET LIGHTS AT KOTHAGUDEM MUNICIPAL CORPORATION
Operation and Maintenance of 12 MWp Solar power plant at Heavy Water Plant (Manuguru)
Painting of Electrical Poles on National Highways line at Kothagudem Municipal Corporation
BTPS - CHP - Replacement of engine cylinder head/liner and track repair work, repairs and reconditioning of radiators, Silencers, Oil coolers, cabin glasses, windows, electrical and AC repair work, repair and reconditioning of self -motors, alternators, fuel injection pump(FIP) and turbo chargers, Replacement/Rearrangement of brake band shoe/liner, lift cylinder seals, tilt cylinder seals and track recoil cylinder seals of BD-355/BD-155 bull dozers as and when required in MM-IV sub division of MM/CHP/BTPS during the FY 2026-27
Cleaning of floor and Drains at Bioiler basement area
Supply of Weak Base Anion Exchange(WBA) RESIN
Providing Pavilion Platform for Football Ground in HWPM Colony. Phase_I
LEVEL TRANMITTER FOR LPBP- W99318145594
Clearing of drain chokes in and around the Residential and Public buildings at HWPM Colony for the years 2026_2028.
DUAL CHANNEL BAR GRAPH INDICATOR SPECIFICATIONS AS PER ANNEXURE
Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
BTPS - CHP - Preventive and breakdown maintenance of coal sampling system, ventilation system at MCC-3 and ERH, DE system-1,2,3,4 at bunker floor required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
KTPS-V VI Stages- Civil- O M-I- Providing CC pedestals to the steel columns of ETP area and GCI sheet roofing to the boiler, I C stores shed, cladding to the silos and brick walls to the storage shed of CAM sub division of KTPS-VI Stage
Construction of Toilets and Bathrooms to STGH Yellandu (V) Yellandu (M) of Bhadradri-Kothagudem District with an estimated cost of Rs.10.00 Lakhs
C/o RWH Pits (7 Nos.) to ZPHS Aswapuram, ZPHS Korrajulagutta (V) of BCM (M), TWREIS Gundala, TTWURJC (G) MNGR, TWREIS Mulakalapalli, TW Ashram HS Elchireddypalli (V) of Pinapak (M), TWREIS (G) Sudimalla (V) of YLD (M) in B.K. District (3rd Call)
BTPS - CHP - Erection of rubber bellows for ring granulators, Fabrication and Replacement of chute liner plates, Chute patch welding at coal hitting areas for all chutes and greasing to all bearings, scoop couplings, geared couplings, gear boxes, Carden shafts belongs to crusher, VGF, BF and Flap gates in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Cold vulcanization belt joints, pulley lagging for the 1400mm BW conveyors, BCN-4A/B, BCN-5A/B,BCN-6A/B, 7A/B and BCN-10 of conveyors as and when required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027.
De Chocking of coal bunkers, cleaning of oil guns and transportation of coal
Sheeting, Tickings and Bedsheets (V2) as per IS 175 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Handloom Wool Blanketsasper IS894 (Q2)
Laying of CC Road from CC Road to Palle Prakruthi vanam of Seetharampuram (V) of Dammapeta Mandal in Bhadradri Kothagudem District Est Cost Rs.100.00 Lakhs
Softhard make Micro-computer based motor protection device
Emergency repairs to Off Take Sluices of Senaga Cheruvu, Papakollu (V) of Kothuru Habitation, Julurupadu (M), Bhadradri Kothagudem Dist (3rd Call)
SUPPLY AND APPLICATION OF COLD INSULATION ON EXCHANGERS,PIPELINES,EQUIPMENT LIKE COLUMN,VESSELS ETC.,AT MAIN PLANT OF HWPM
SPARES FOR THREE WAY MOTORISED TEMPERATURE
Maintenance of playgrounds i.e, Cricket Ground, Hockey Ground, Joggers park and CISF Unit line area in HWPM colony for the year 2026_2028.
Revolving Chair (V5) (Q2)
Composite Office Tablesconformingto IS8126 (V2) (Q2)
Motor circuit breaker, 3 pole, 415 V AC, 50 Hz, Thermal protection adjustment range 0.4A to 0.63A, Thermal protection adjustment range 0.63A to 1A
Spare Rotor (25m, 13.2m3/hr) for canned motor pumps as per Annexure I, Spare Bearing Monitor for canned motor pumps as per Annexure I, 2.97m3/hr) for canned motor pumps as per Annexure I
Hydrometerological instruments
Re-insulation and Re-winding of AVK make 1250KVA DG alternator , type DKBN 120/1670 4TS, 415V,50HZ,1500 RPM
SUPPLY OF SODIUM HYDRO SULPHIDE NaHS ON 100percent BASIS AS PER IS 297 2001 IN SUPPLIERS ROAD TANKERS ON AS AND WHEN REQUIRED BASIS DETAILED TECHNICAL SPECIFICATIONS ENCLOSED
ASTM A193 Grade B7M studs and ASTM A194 Grade 2HM
Providing 1.5 TR Split A.C Unit to Guest Houses
Improvements to Shyama Vihar and V.B.C Cottages
Construction of Chain link mesh fencing around the 130.41 Ha Non-forest land at Koyagudem OCP-I, Yellandu Area, Bhadradri Kothagudem District, Telangana State.