Loading…
Loading…
678 results • Latest
ISMB as per enclosed Technical Specifications
Indure make 200NB manually operated Knife Edge Gate Valve for DFACS system, Indure make 300NB manually chain operated Knife Edge Gate Valve for DFACS system, Indure make 300NB Pneumatically operated Knife Edge Gate Valve for DFACS system
Seat Ring A Size 1.5inches and 2inches As per Annexure IA, Seat Ring A Size 3inches As per Annexure IA, Seat Ring A Size 4inches As per Annexure IA, Seat Ring A Size 6inches As per Annexure IA, Seat Ring A Size 12inches As per Annexure IA
Siliconesealant (Q3)
Pin Insulator assembly as per enclosed Drawing and detailed specification Annexure TS
M/s AROTO make Rotary Gear pump, Foot Mounted, Model- G3
LEAK PROOF MAKE BALANCED SINGLE MECHANICAL SEAL TYPE: 80B, 1.75", SET OF SECONDARY ELASTOMERS CONSISTS OF SIZE: 1.75" FOR ABOVE SEALS
E-Tourist Vehicle/Golf Cart (Q2)
Aluminium Paint, Heat Resistant as per IS 13183 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
VERTICAL TURBINE PUMP SPARES FOR ASH HANDLING
Replacement of PVC flooring in MCR of CPP at HWPM.
Housekeeping of CPP buildings at HWPM for the year 2026-2028.
Impeller fitted with wear ring Part no. 2 8 MOC SS316, Impeller bolt with washer and lock washer Part no. 26 24 24a MOC SS316, Shaft with keys Part no 6 32 46 MOC SS316, Gasket casing Part no. 73 MOC SS316 by Asb filled, Bearing cover IB Part no 35 MOC CI, Bearing cover OB Part no 37 MOC CI, Casing wear ring Part no 7 MOC SS316.
Supply and Installation of Pultruded FRP cooling tower for 1000 KVA DG set at CPP
Remnant Life Assessment and Condition Assessment of SG#2
Overhaul of CEPs and CCWPs
KTPS-V stage -EM and MRT-Machining and Fabrication works to be carried out in EM and MRT Division of KTPS-V Stage during the year 2026-2027-Reg
KTPS-V stage -EM and MRT-Testing of Transformer Oil samples of Outdoor power Transformers of KTPS-V Stage during FY 2026-27-Reg
Goods Transport Service – Per Trip based Service - SS Drums filled with special material; Heavy Commercial vehicle; 19 feet length X 7 feet width to maximum 25 feet length X 8 feet width, Capacity 9 MT on carrier risk basis
Supply of Laboratory Record Books as per enclosed
Thermodynamic steam trap; PN 63 rating, Stainless steel construction, IBR quality; size: 15NB(1/2" ), IBR quality; size: 20NB(3/4" )
Manufacturing and supply of H2S Centrifugal Compressor (Gas booster) Seal housing
KTPS-V stage -BM-Overhauling of Main Steam stop valves ( Tag No.MS-I and II) size:14", M/O, 2500 class of Unit-10 Boiler/KTPS-V Stage during the Annual Overhaul period 2026-27.-Reg
KTPS-V-BM-Engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 KM per month for the conveyance of Divisional Engineer /BM/ KTPS V stage for the period from 01.04.2026 (or from the actual date of utilization) to 31.03.2027. (Reserved for ST category)-Reg
KTPS-V-Chemical-Engaging of Jeep along with driver on hire basis for a mileage up to 2000Km/Month and 12 Hours per Day for the conveyance of Chief Chemist/O and M/ KTPS V Stage and Chief Chemist/O and M/KTPS VI Stage for the Period from 01/04/2026 (or from actual date of utilization) to 31/03/2027.-Reg
KTPS-V-TM-Engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 KM per month for the conveyance of Divisional Engineer / TM/ KTPS V for the period from 01/04/2026 (or from the actual date of utilization) to 31/03/2027 (Reserved for ST category)-Reg
KTPS-V-EM and MRT-Engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 KM per month for the conveyance of Divisional Engineer /EM and MRT/ KTPS V stage for the period from 01.04.2026 (or from the actual date of utilization) to 31.03.2027. (Reserved for ST category)-Reg
KTPS-V-I and C-Engaging of Jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 KM per month for the Conveyance of Divisional Engineer/I and C Division/KTPS-V Stage for the period of one year from 01-04-2026 (or from actual date of utilizaion) to 31-03-2027.(Reserved for ST category)-Reg
KTPS-V-Engaging of AC car along with driver on hire basis for 12 Hours per day for a mileage up to 2000Km/month for the official utilization of Superintending Engineer/OandM/KTPS-V stage for the Period from 01-04-2026 (or from actual date of utilization) to 31-03-2027.(Open category)-Reg
KTPS-V-General-Engaging of jeep along with driver on hire basis,round the clock for unit emergencies and for the official utilization of DE/ General /KTPS-V Stage under the control of DE/General/KTPS-V Stage with mileage up to 2500 Km/month including fuel charges, driver salary, Maintenance charges, road taxes, insurance etc, for the period from 01/04/2026 (or from actual date of utilization) to 31/03/2027.(Reserved for ST contractors)-Reg
KTPS-V-CAM-Engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 KM per month for the conveyance of Divisional Engineer /CAM/ KTPS V stage for the period from 01.04.2026 (or from the actual date of utilization) to 31.03.2027. (Reserved for ST category)-Reg
KTPS-V-BM-Service charges for Conducting PAUT (Non- Destructive Test) on Welding Joints in Pressure Parts of Unit- X Boiler during Unit- X Annual Overhaul Works for the year 2026-27.-Reg
KTPS-V Stage- EM and MRT- Testing of 220kv Switchyard equipment of KTPS-V stage-Reg
SS-410 SHEET LENGTH 5Mtrs X width 1.25 Mtrs X 5mm Thickness as per IS-6911-992
Supply of insulation Mats for Electrical purpose
Rolled Aluminium cladding sheet having thickness of 22 SWG
Goods Transport Service – Per Trip based Service - SS drums filled with special material; Heavy Commercial Vehicle; 19 feet length X 7 feet width to maximum 25 feet length X 8 feet width, Capacity 9 MT on carriers risk basis
KTPS-V stage -BM-Service charges forconducting Radiography ( Non- Destructive Test) on welding joints in pressure parts of Unit-X Boiler during Unit-X Annual Overhaul works for the year 2026-27-Reg
KTPS-V stage -BM-Overhauling of Louver damper Assembly ( PAD-5AB,5CD and 5EF,8A,8B,8C,8D,8E,8F) Bypass dampers, GD-5,6,7,8 and Repair/ Erection of expansion joints along with protection plates in PA and SA ducts of Unit-X in the annual overhaul of 2026-27.-Reg
KTPS-V stage -BM- Hydro jet water cleaning of Boiler water walss,platen super Heater coils, Re-heater coils, Final SH coils and Boiler II pass ( includes roof tubes, steam cooled wall tube 4 sides panels, LTHS bank and Economizer banks) during the Annual Overhaul works of Unit-10 Boiler KTPS V Stage for the FY 2026-27.-Reg
KTPS-V stage -BM-Annual Maintenance Estimate for Machining works in Boiler Maintenance Division of Unit # 9 and 10 during the year 2026-27.-Reg
KTPS-V stage -EM and MRT-Annual Overhaul of ESP-X for the year 2026-27.-Reg
KTPS-V stage -TM-Removal and Re-Fixing of Rock- Wool mattresses and Aluminium metal cladding and Arranging sucffholdings at various locations during AOH of Unit-10 FY 2026-27 and Day to day maintenance works of TM Division in Unit-09 and 10 throughout the year 2026-27.-Reg
Machining and Fabrication Works during AOH of Unit-10 FY 2026-27 and Day to day maintenance works of TM Division in Unit-09 and 10 throughout the year 2026-27
KTPS-V- CAM - Annual Maintenance service contract for weighing equipment of 100MT 18 Mtrs x 3 Mtrs Electronic weigh Bridge for the Year 2026-27.-Reg
KTPS-V stage -CAM-Machining works required for Common Auxiliaries Equipment of KTPS-V Stage for the year 2026-27-Reg
KTPS-V stage -EM and MRT-Annual Maintenance contract of Gomaco make 400Kg Chimney Lift at KTPS-V Stage for the FY 2026-27-Reg
KTPS-V Stage- EM and MRT- Annual Maintenance contract on 1768Kgs Variable Frequency drive (VFD) Controller based Unit-X boiler lift at KTPS-V Stage for the period from 01.04.2026 to 31.03.2027-Reg
Non Sparking Combination Spanners (V2) (Q2)
Platform Step Ladder (V2) (Q3), Tower Ladder (V2) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete