Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAdmitted-Finance AMMGARIPALLI P O AMMGARIPALLI BHADRADRI KOTHAGUDEM DIST TELANGANA STATE PIN 507116 | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹34.8 L | L1 | Admitted-Finance |
| 2 | L2₹36.0 L+₹1.2 L (3.38%)Admitted-Finance H NO 1 188 BUDUGU BAZAR ASWAPURAM MANDAL BHADRADRI KOTHAGUDEM DIST TELANGANA STATE 507 116 | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹36.0 L+₹1.2 L (3.38%) | L2 | Admitted-Finance |
| 3 | L3₹38.7 L+₹3.9 L (11.1%)Admitted-Finance H NO 3 52 CHAVITI GUDEM ASWAPURAM MANDAL BHADRADRI KOTHAGUDEM DIST 507 116 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹38.7 L+₹3.9 L (11.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s RADHA KRISHNA CONTRACT WORKS L1 | Sri Bhargavi Engineering Works L3 | M/s R R ENGINEERING WORKS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Shifting of Empty Drums : Shifting of 200 Ltrs. capacity empty SS drums to Distillation Unit from different storage areas/locations and DPS Stores located within the plant site. | 4,070 | Nos | 38 ₹1,54,660 Lowest | 44 ₹1,79,080 | 45 ₹1,83,150 |
| 2.00 | Cleaning of Product drums/Containers : Removal of rubber bumpers, split cap covers opening etc., pressurizing with air at 0.5 Kg/cm2 and leak testing the drum with soap solution and placing the rubber bumpers back in their position. Thorough cleaning of 200 Ltrs capacity empty SS drums with soap solution, other degreasing agents, filtered water, rinsing 2 to 3 times with DM water and hot condensate, Shifting the drums for drying, Rolling the empty drums from drying area to the adjacent building for filling. | 4,200 | Nos | 87 ₹3,65,400 Lowest | 99 ₹4,15,800 | 100 ₹4,20,000 |
| 3.10 | Shifting of filled product containers : Filled drums, weighing about 280 Kgs each (or equivalent no. of balloons), are to be shifted with utmost care from the filling/storage areas to different storage areas located within the plant site. Ensuring Leak tightness of the drums and replacement of ‘O’ rings before shifting, if required, and suitable positioning as per the existing two-tier storage arrangement of product drums | 5,340 | Nos | 72 ₹3,84,480 | 69 ₹3,68,460 Lowest | 80 ₹4,27,200 |
| 3.20 | Shifting of consignment drums: Filled consignment drums are to be shifted from D2O-4 storage area to D2O-2 storage area for palletization activity and shifting of palletized drum from D2O-2 to D2O-4 storage area after palletization. | 3,640 | Nos | 25 ₹91,000 Lowest | 31 ₹1,12,840 | 60 ₹2,18,400 |
| 4.00 | Filling of product in product containers : SS drums of about 220 Liters capacity (or equivalent no.of balloons) are to be handled for filling from product tanks at D.U. Maximum weight of one filled drum will be about 280 Kgs. Filing job involves placing empty drums on weighing scale, Nitrogen purging, filling, sampling, sealing, labeling and shifting the filled containers after filling to the nearby area within 50 meters. Weighing scale is to be calibrated once for every 5 drums filling. | 4,070 | Nos | 68 ₹2,76,760 Lowest | 69 ₹2,80,830 | 80 ₹3,25,600 |
| 5.00 | Shifting and charging of product in Storage tanks : Emptying job involves shifting the drums on a trolley/trailor from D.U area or other product storage godown to product storage tanks at different locations within plant premises, pressurising the drum up to 0.5 Kg/Cm2g with L.P.N2 and emptying the drum to the storage tanks, shifting back the empty drums to the nearby storage area. | 3,000 | Nos | 84 ₹2,52,000 Lowest | 99 ₹2,97,000 | 100 ₹3,00,000 |
| 6.00 | Cleaning of Process Vessels & equipments : External & Internal cleaning of process vessel , equipments and columns with chemical solutions at regular intervals, de-choking of all nozzles of Columns/ vessels and flushing thoroughly with water. Cleaning of vessels like evaporators and small storage vessels , pipe lines etc; with water by arranging spargers / sprayers. Replacement of charcoal, resin etc; of charcoal beds/ion exchange beds etc; periodically. Necessary tools and tackles are to be arranged by the contractor for cleaning, disposing waste as per the instructions of Engineer-In-Charge | 358 | Nos | 643 ₹2,30,194 Lowest | 719 ₹2,57,402 | 700 ₹2,50,600 |
| 7.00 | Drums charging and emptying of drums in O18 plant : Shifting of 230 kg NG Heavy water drum from Distillation unit filling area to O 18 plant , transferring to feed tank of Column-1 feed tank, collection of reject quantity from Column 1 and column 2 approx 230kg in to drums and shifting of this filled drums in to Distillation unit and transferring into 25 m elevation, emptying enriched seal water approx 300 lit from to seal water tank and makeup the seal water tank , shifting and transferring of 300 lit seal water in to Distillation Unit reject tank. | 117 | MT | 706 ₹82,602 | 749 ₹87,633 | 600 ₹70,200 Lowest |
| 8.00 | Cleaning of new product storage tanks : Cleaning of new product storage tanks by filling D.M water and draining twice, removal of rust by wire brush from the inner surfaces of the tank, preparation of chemical solution batch, charging, nitrogen bubbling, draining of solution, drying by purging nitrogen etc;. | 14 | Nos | 13,200 ₹1,84,800 | 14,499 ₹2,02,986 | 8,000 ₹1,12,000 Lowest |
| 9.10 | Arrangment of Heavy water drums for radiation check : Arrangement of Heavy water consignment drums to create space between the drums for checking the background radiation of each consignment drum. s. | 1,820 | Nos | 46 ₹83,720 | 45 ₹81,900 Lowest | 60 ₹1,09,200 |
Tender Value
₹42.4 L
EMD Value
₹84,720
Closing Date
26 Aug 2026, 2:00 pmClosed
CGM, HWPM
HWP, MANUGURU
HANDLING AND STORAGE OF PRODUCT CONTAINERS AND PREPARATION OF DOSING OF CHEMICAL SOLUTION IN CWS, FWS and CHWS
2026_HWB_920003_1
HWPM/PP/DUCWS/26/01
Open Tender
Miscellaneous Works
Item Rate
730 days
HWPM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹84,720
Yes
17 Sept 2026
10 Aug 2026
27 Aug 2026
10 Aug 2026
26 Aug 2026
10 Aug 2026
10 Aug 2026 - 19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shifting of Empty Drums : Shifting of 200 Ltrs. capacity empty SS drums to Distillation Unit from different storage areas/locations and DPS Stores located within the plant site. | - | Nos | 48.07 | - |
| 2 | Cleaning of Product drums/Containers : Removal of rubber bumpers, split cap covers opening etc., pressurizing with air at 0.5 Kg/cm2 and leak testing the drum with soap solution and placing the rubber bumpers back in their position. Thorough cleaning of 200 Ltrs capacity empty SS drums with soap solution, other degreasing agents, filtered water, rinsing 2 to 3 times with DM water and hot condensate, Shifting the drums for drying, Rolling the empty drums from drying area to the adjacent building for filling. | - | Nos | 112.42 | - |
| 3.1 | Shifting of filled product containers : Filled drums, weighing about 280 Kgs each (or equivalent no. of balloons), are to be shifted with utmost care from the filling/storage areas to different storage areas located within the plant site. Ensuring Leak tightness of the drums and replacement of ‘O’ rings before shifting, if required, and suitable positioning as per the existing two-tier storage arrangement of product drums | - | Nos | 81.1 | - |
| 3.2 | Shifting of consignment drums: Filled consignment drums are to be shifted from D2O-4 storage area to D2O-2 storage area for palletization activity and shifting of palletized drum from D2O-2 to D2O-4 storage area after palletization. | - | Nos | 32.8 | - |
| 4 | Filling of product in product containers : SS drums of about 220 Liters capacity (or equivalent no.of balloons) are to be handled for filling from product tanks at D.U. Maximum weight of one filled drum will be about 280 Kgs. Filing job involves placing empty drums on weighing scale, Nitrogen purging, filling, sampling, sealing, labeling and shifting the filled containers after filling to the nearby area within 50 meters. Weighing scale is to be calibrated once for every 5 drums filling. | - | Nos | 81.62 | - |
| 5 | Shifting and charging of product in Storage tanks : Emptying job involves shifting the drums on a trolley/trailor from D.U area or other product storage godown to product storage tanks at different locations within plant premises, pressurising the drum up to 0.5 Kg/Cm2g with L.P.N2 and emptying the drum to the storage tanks, shifting back the empty drums to the nearby storage area. | - | Nos | 122.22 | - |
| 6 | Cleaning of Process Vessels & equipments : External & Internal cleaning of process vessel , equipments and columns with chemical solutions at regular intervals, de-choking of all nozzles of Columns/ vessels and flushing thoroughly with water. Cleaning of vessels like evaporators and small storage vessels , pipe lines etc; with water by arranging spargers / sprayers. Replacement of charcoal, resin etc; of charcoal beds/ion exchange beds etc; periodically. Necessary tools and tackles are to be arranged by the contractor for cleaning, disposing waste as per the instructions of Engineer-In-Charge | - | Nos | 737.97 | - |
| 7 | Drums charging and emptying of drums in O18 plant : Shifting of 230 kg NG Heavy water drum from Distillation unit filling area to O 18 plant , transferring to feed tank of Column-1 feed tank, collection of reject quantity from Column 1 and column 2 approx 230kg in to drums and shifting of this filled drums in to Distillation unit and transferring into 25 m elevation, emptying enriched seal water approx 300 lit from to seal water tank and makeup the seal water tank , shifting and transferring of 300 lit seal water in to Distillation Unit reject tank. | - | MT | 771.52 | - |
| 8 | Cleaning of new product storage tanks : Cleaning of new product storage tanks by filling D.M water and draining twice, removal of rust by wire brush from the inner surfaces of the tank, preparation of chemical solution batch, charging, nitrogen bubbling, draining of solution, drying by purging nitrogen etc;. | - | Nos | 14,850.19 | - |
| 9.1 | Arrangment of Heavy water drums for radiation check : Arrangement of Heavy water consignment drums to create space between the drums for checking the background radiation of each consignment drum. s. | - | Nos | 51.32 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_966831.xls
BOQ • 0.24 MB
TenderDocDUCWS.pdf
Tender Documents • 0.56 MB
AnnexureXI.pdf
Additional Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .