Loading…
Loading…
211 results • Latest
Operation and maintenance of sewage treatment plant and supporting services at WTP etc at HWPK Colony for Two years during 2026-27 and 2027-2028
Renovation of Canteen facility and Miscellaneous works at Heavy Water Plant (Kota) site
Annual Maintenance contract of Instruments and Control system at HWBF Talcher for the Year 2026-27
Internal painting of vacant quarters and other works in HWPM colony for the year 2026-2028.
LAN Network revamping Work along with associated accessories for network upgradation
Statutory inspection and hydro testing of Ammonia storage tank including servicing and testing of associated isolation and safety relief valves
Surveillance and Maintenance of Ash Slurry Lines
Maintenance of centralised AC system of MCR, Packaged AC untis of chem.lab AHP control Room,Air Washer units AHUS and deluge system in transformer yards(2Y)at CPPHWPM
GENRAL SCAFFOLDING WORKS AT XU LPG ISG FLARE STACK AND DRAIN PIT AREAS IN MAIN PLANT AT HWPM
HANDLING AND STORAGE OF PRODUCT CONTAINERS AND PREPARATION OF DOSING OF CHEMICAL SOLUTION IN CWS, FWS and CHWS
Fabrication works in boiler Auxiliaries at CPP
Supply of 100 assembled vent plug components for process pipe lines at HWP Tuticorin
annual contract for piecemeal jobs on day to day basis in general shift and round the clock shift in sodium plant
Supply and fabrication, welding and erection of miscellaneous steel structures during year 2026-2028 at HWPK site
Provision of shed for the R club backside stage, kitchen in Vanasthali garden and extension of GYM, at HWPK housing colony
Construction and Repair work of RCC water storage Tank of G plus 2 Blocks and other public buildings at HWPK housing colony
Maintenance of safety equipments and records at HWBF Talcher during 2026-27
Annual Overhauling and Emergency repair of Steam generating units at CPP.
Running Maintenance of Air Compressors, Boiler Feed Pumps, Fuel Oil Transfer Pumps, Chemical dosing pumps and Ammonia system etc. of Boiler group at CPP
Maintenance contract for Insulation work on towers, tanks, exchangers and pipelines etc at HWPK site for Two years.
Material shifting fabrication welding and machining of fittings at HWPT
Audit and Re certification of ISO 9001 QMS ISO 14001 EMS and ISO 45001 OH and SMS to Heavy Water Plant Kota
Operation and Maintenance of 12 MWp Solar power plant at Heavy Water Plant (Manuguru)
Cleaning of floor and Drains at Bioiler basement area
Providing Pavilion Platform for Football Ground in HWPM Colony. Phase_I
Clearing of drain chokes in and around the Residential and Public buildings at HWPM Colony for the years 2026_2028.
De Chocking of coal bunkers, cleaning of oil guns and transportation of coal
SUPPLY AND APPLICATION OF COLD INSULATION ON EXCHANGERS,PIPELINES,EQUIPMENT LIKE COLUMN,VESSELS ETC.,AT MAIN PLANT OF HWPM
Maintenance of playgrounds i.e, Cricket Ground, Hockey Ground, Joggers park and CISF Unit line area in HWPM colony for the year 2026_2028.
Improvement in Lighting and ventilation system at RM shop and Miscellaneous works in Main Plant.
Re-insulation and Re-winding of AVK make 1250KVA DG alternator , type DKBN 120/1670 4TS, 415V,50HZ,1500 RPM
Improvement of Lighting at operating areas in Main plant of HWPM.
Biennial Maintenance of 440/230Volts power Distribution System at HWPM Colony 2026-27.
VPI (Vacuum Pressure Impregnation) based rewinding of 2 nos of 6.6 KV 215 KW Coal Mill Motor
External Painting Of Residential Quarters, at HWBF,Talcher,Colony For The Year 2026-27.
AMC OF XU-I/XU-II/UTILITIES DCS SYSTEM
Austenitic Stainless Steel Tubingfor General Service (As Per ASTMA269) (Q3)
Analytical works at PCAL Section of HWP(M) for two years
Removal and refilling of resin from Ion Exchange Beds, topping up of Resin in Resin beds, preservation activities of resin filled drums and cleaning, sorting of packing of Degassers at D.M.Plant
Supply and application of Cold insulation on pipe lines at HWP Tuticorin.
Biennial contract for Cutting of wild growth, grass at HWPK housing colony from the year 2026 to 2028
REMOTE SEAL TYPE PRESSURE TRANSMITTER
Maintenance of Street and Perimeter Lighting System of Electrical Process (2026-28)
HOUSEKEEPING CUM HORTICULTURE MAINTENANCE WORK OF BUILDINGS AND INDUSTRIAL AREAS AT HWBF TALCHER PLANT PREMISES FOR THE YEAR 2026-27.
Renovation of Training Hall 3 of works building and providing and fixing aluminium partition works at open area in front of recruitment section as video conference room.
Widening of outside existing drain from watch tower No. 8 to skew bridge and RCC Guide wall near stream merging point at HWP (M).
Structural repairs and painting works to the service water tank near DM plant of CPP at HWPM.
Biennial contract for repair and maintenance of Rolling shutter at HWPK plant site
Design and Detailed Engineering Procurement Construction Installation Testing and Commissioning of ETP with RO System of 240 KLD capacity at HWP Tuticorin
Overhauling of 6.6KV HT motors and thermography of HT and LT motors in main plant of HWPM