Loading…
Loading…
212 results • Latest
Quarterly sampling and analysis of discharge water samples from different locations of Heavy Water Plant and Township area by NABL accredited Laboratory for the year 2026-28
Revamping and Up-gradation of ECIL make SMART RFID Access Control System, Time and Attendance Management System, and its associated systems for HWBF Vadodara
Clearing of Jungle in Ash Pond 1 and 2 at HWPM.
Providing RCC Grade Slab, dykes (Phase II), fencing work in D20 8 area, providing and fixing of stairs and exit door to the VFD buildings (North and South Substation) and miscellaneous works at BCPP in HWPM.
Housekeeping of Industrial and office buildings in Main Plant at HWP (M) for the year 2026-2028.
Support services for Administrative works in Heavy Water Plant Manuguru.
Servicing and maintenance contract for air conditioners, water coolers, refrigerators and water purifiers installed at HWBF-Vadodara in scheduled/breakdown routine
Replacement of R-134a compatible compressor with accessories in place of existing Freon compressor system in Main Plant of HWPM
Valve servicing maintenance of workshop machines and other misc works in R M shop at main plant of HWPM
Painting of Equipments pipe lines structures tanks and vessels in H2S Generation unit Na2SO4 recovery PTP area and R M shop
Piping Equipment Structural fabrication Works Patch repairs etc in Boron plants of HWPM
Tower internal reoval and fixing for 3HT 3 CT in XU1
InSitu Replacement Re-tubing of heat exchanger tube bundles in Main Plant of HWPM
dragger make pocl3 sensor part no 6810595
Internal Repair and Reconditioning work in exchange unit towers 3HT 3 ct in XU I in main plant of hwpm
Internal cleaning and Hydro testing of H2S storage bullets maintenance of valves and PSVs at Main plant of HWPM
Maintenance of CCTV System in HWPM Site and Colony
AMC of Level Gauges, level Switches, Scaffolding and H2S Monitors Calibration during the year 2025-2027
HANDLING OF CHEMICAL BAGS CONTAINING ALUM, LIME, P.E ETC AND PREPARARTION OF SOLUTION AT RWTP, DMP AND ETP
Handling and charging of salts, assembly / disassembly of Electro-Winning cell components and miscellaneous works in EBP
Assistance in cooking, catering and general housekeeping works in the industrial canteen of Heavy Water Board Facilities, Vadodara
1, 1 Dichloroethane, Chloroform ACS Grade
Mechanical Maintenance Assistance for Material Handling, Cleaning, Machining, Drilling, Lapping and Allied Works at Heavy Water Board Facilities, Vadodara.
MAINTENANCE OF ROTATING EQUIPMENT IN CAP/DU/NGP/VAR/BA/FWPH/BAS/O-18 AND UTILITY-1 AREA AT MAIN PLANT OF HWPM
Refilling of Industrial Gases in Cylinders - Nitrogen Gas; Cubic Meter
Laboratory Glassware Volumetric Flask (Q4)
Routine Maintenance of Material handling Equipment including boom extension reduction of all the MHEs in Main Plant of HWPM
Supply installation and commissioning of Optical fiber cable and Network infrastructure for interconnection of fire alarm control panels
Repair and Fabrication works in TG group at CPP HWPM for 02 years
GENERAL SCAFFOLDING WORKS AT CPP
Running Maintenance of Ash Handling Equipment
Inspection of Rubber lined MSRL Vessels and repair re-rubber lining of the vessels in DM Plant of Main Plant
Calibration and functional check of online environmental monitors,supply and installation of spare parts of dragger make environment monitors for the Year 2026-27
Laboratory Beakers (V3) Confirmingto IS2619 (Q2)
Vacuum Pump Oil (Q3)
Karl Fischer Titrator (V2) (Q3) (PACOnly)
Dismantling of structural member from a height, reinforcement of platform and material testing at HWBF Talcher.
MISCELLANEOUS MATERIAL HANDLING JOB AT DPS STORES UNIT HWBF TALCHER FOR THE YEAR 2026-27
External Painting Of Residential Quarters, at HWBF,Talcher,Colony For The Year 2026-27.
Maintenance and upkeeping of lighting and telephone system at HWBF, Talcher.
Platinum Cobalt Colour Standard, Sodium Hydroxide, Iso Amyl Acetate, Calcium Chloride Fused
HYDRAULIC PRESSURE TESTING AND REFILLING OF CO2 FIRE EXTINGUISHER CYLINDERS AND CARTRIDGES OF HWP, MANUGURU
supply of spares for VND Plastico Pumps
Operation And Maintenance of Electrical Installations at HWBF,Talcher
Contract for removal of old external plaster and plinth protection and providing new plaster, plinth protection etc. in ground Storied quarters at HWP K housing colony phase Two
Revamping (Cleaning and painting) of Safety Precautions on wall Boards at Public awareness Zone Villages in Breathing air Shelters of the HWPM.