Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹68.4 LAccepted-AOC D NO 7 1 332 220KV SUBSTATION ROAD AMBEDKAR CENTER BANDARUGUDEM BHADRADRI KOTHAGUDEM DIST 507117 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507117 | ₹68.4 L Quoted ₹69.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹71.4 L+₹2.2 L (3.14%)Rejected-AOC H NO 2 220 JAGGARAM ASWAPURAM BHADRADRI KOTHAGUDEM DIST TELANGANA 507116 | ASWAPURAM | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹71.4 L+₹2.2 L (3.14%) | 2 | Rejected-AOC L2 |
| 3 | 3₹81.4 L+₹12.1 L (17.5%)Rejected-AOC H NO 3 194 OPP HWP M COLONY GATE ASWAPURAM POST 507116 BHADRADRI KOTHAGUDEM DIST | ASWAPURAM | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹81.4 L+₹12.1 L (17.5%) | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical H NO 3 52 CHAVITI GUDEM ASWAPURAM MANDAL BHADRADRI KOTHAGUDEM DIST 507 116 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | - | - | Rejected-Technical Not Meeting NIT norms |
| Sl No | Description | Qty | Unit | SHRAVANI CONSTRUCTIONS L3 | naresh constructions L2 | M/s AYESHA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all types of soils other than hard rock up to a depth not exceeding 2.00 Mts from original average ground level, back filling around foundations with excavated soil in layers not exceeding 150 MM, watering and consolidating including shoring/ strutting if required, de-watering by appropriate method to ensure water free working environment at founding level and disposing of surplus earth within plant premises etc., all complete as per drawings, specifications and as directed by Engineer. | 110 | Cum | 500 ₹55,000 | 510 ₹56,100 | 450 ₹49,500 Lowest |
| 2.00 | Surface dressing and levelling of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish within plant premises etc., all complete as per drawings, specifications and as directed by Engineer in charge. | 1,160 | Sqm | 150 ₹1,74,000 | 110 ₹1,27,600 Lowest | 120 ₹1,39,200 |
| 3.00 | Providing and laying in position plain cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-II) : 4 graded stone aggregate 20 mm nominal size) approved quality, cement grade of OPC-43 of make ACC/Ultratech/ Birla or any other approved make for foundation / under floor including form work, consolidation, leveling, finishing and curing. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., all complete as per drawings, specifications and as directed by Engineer in charge. (The cement consumption for this item is 320 Kg/Cum). | 30 | Cum | 10,000 ₹3,00,000 | 8,700 ₹2,61,000 | 8,500 ₹2,55,000 Lowest |
| 4.00 | Providing and laying plain cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) using 40 / 20 mm nominal size stone aggregate of approved quality, cement grade of OPC-43 of make ACC/ Ultratech/ Birla etc for foundation / under floor including form work, consolidation, leveling, finishing and curing etc., In addition to the cement the agency has to add 30Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., all complete as per drawings, specifications and as directed by Engineer. (The cement consumption for this item is 170 Kg/Cum). | 82 | Cum | 7,500 ₹6,15,000 Lowest | 7,500 ₹6,15,000 Lowest | 7,500 ₹6,15,000 Lowest |
| 5.00 | Providing and laying Plain cement concrete of 1:3:6[1 cement,3sand 6 stone aggregate] grade, using 40mm and down gauge crushed stone aggregate of approved quality, cement grade of OPC-43 of make ACC/ Ultratech/ Birla etc in foundation and plinth, under floors, pavements, footings, pedestals etc. excluding centering and shuttering, spreading, leveling, ramming, finishing, curing etc. In addition to the cement the agency has to add 30Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., complete as per specifications and as directed by the Engineer-in-charge. (The cement consumption for this item is 220 Kg/Cum). | 35 | Cum | 8,000 ₹2,80,000 Lowest | 8,100 ₹2,83,500 | 8,000 ₹2,80,000 Lowest |
| 6.00Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (1 cement : 1.5 coarse sand (zone-II) : 3 graded stone aggregate 20 mm nominal size). make of ACC/ULTRATECH/BIRLA/JAYPEE cement grade of OPC-43, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete, laying at site, spreading and compacting mechanically by using needle and surface vibrator, curing by hessian cloth, carriage for all leads; excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. The cement consumption for this item is 400 Kg/Cum. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. The total cementitious content will be 440kg/Cum. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. It will be the sole responsibility of the contractor to matchthe property of fly ash to Grade I of IS 3812 before being used in the works. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, processing the fly ash to specified grading, mixing the fly ash with cement etc.free of cost. It is the sole responsibility of the agency to transport the fly ash field no.2 of Boiler in CPP site. Processing the fly ash to specified grading. mixing the fly ash with cement etc. | ||||||
| 6.10 | Up to Plinth Level. | 75 | Cum | 10,500 ₹7,87,500 Lowest | 10,600 ₹7,95,000 | 10,500 ₹7,87,500 Lowest |
| 6.20 | Above plinth level. | 17 | Cum | 12,000 ₹2,04,000 | 12,000 ₹2,04,000 | 11,500 ₹1,95,500 Lowest |
| 7.00 | Providing, laying and fixing in position TMT reinforcement bars of TATA/VIZAG STEEL/SAIL/JINDAL for RCC works, including cost of supplying, cutting, bending, transporting, erecting, binding with 16 gauge MS annealed wire, cement mortar spacer blocks etc. complete as per specifications and as directed by the Engineer in charge. | 8,300 | Kg | 120 ₹9,96,000 | 115 ₹9,54,500 Lowest | 117 ₹9,71,100 |
| 8.00Centering and shuttering including strutting, Propping etc, and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., with water proof ply 12 mm thick complete as per specifications and as directed by the Engineer in Charge. | ||||||
Tender Value
₹62.8 L
EMD Value
₹1.3 L
Closing Date
10 Apr 2026, 6:00 pmClosed
GENERAL MANAGER HWPM
O/o General Manager HWPM Bhadradri Kothagudem Dist Telangana State 507116
Providing RCC Grade Slab, dykes (Phase II), fencing work in D20 8 area, providing and fixing of stairs and exit door to the VFD buildings (North and South Substation) and miscellaneous works at BCPP in HWPM.
2026_HWB_903370_1
HWPM/CIVIL/MP/NIT/2026/06
Open Tender
Civil Works
Item Rate
150 days
HWPM
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.3 L
1 Jul 2026
27 Mar 2026
17 Apr 2026
27 Mar 2026
10 Apr 2026
27 Mar 2026
27 Mar 2026 - 7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all types of soils other than hard rock up to a depth not exceeding 2.00 Mts from original average ground level, back filling around foundations with excavated soil in layers not exceeding 150 MM, watering and consolidating including shoring/ strutting if required, de-watering by appropriate method to ensure water free working environment at founding level and disposing of surplus earth within plant premises etc., all complete as per drawings, specifications and as directed by Engineer. | 110 | Cum | - | - |
| 2 | Surface dressing and levelling of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish within plant premises etc., all complete as per drawings, specifications and as directed by Engineer in charge. | 1,160 | Sqm | - | - |
| 3 | Providing and laying in position plain cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-II) : 4 graded stone aggregate 20 mm nominal size) approved quality, cement grade of OPC-43 of make ACC/Ultratech/ Birla or any other approved make for foundation / under floor including form work, consolidation, leveling, finishing and curing. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., all complete as per drawings, specifications and as directed by Engineer in charge. (The cement consumption for this item is 320 Kg/Cum). | 30 | Cum | - | - |
| 4 | Providing and laying plain cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) using 40 / 20 mm nominal size stone aggregate of approved quality, cement grade of OPC-43 of make ACC/ Ultratech/ Birla etc for foundation / under floor including form work, consolidation, leveling, finishing and curing etc., In addition to the cement the agency has to add 30Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., all complete as per drawings, specifications and as directed by Engineer. (The cement consumption for this item is 170 Kg/Cum). | 82 | Cum | - | - |
| 5 | Providing and laying Plain cement concrete of 1:3:6[1 cement,3sand 6 stone aggregate] grade, using 40mm and down gauge crushed stone aggregate of approved quality, cement grade of OPC-43 of make ACC/ Ultratech/ Birla etc in foundation and plinth, under floors, pavements, footings, pedestals etc. excluding centering and shuttering, spreading, leveling, ramming, finishing, curing etc. In addition to the cement the agency has to add 30Kg of fly ash per Cum of concrete. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, mixing the fly ash with cement etc., complete as per specifications and as directed by the Engineer-in-charge. (The cement consumption for this item is 220 Kg/Cum). | 35 | Cum | - | - |
| 6Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (1 cement : 1.5 coarse sand (zone-II) : 3 graded stone aggregate 20 mm nominal size). make of ACC/ULTRATECH/BIRLA/JAYPEE cement grade of OPC-43, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete, laying at site, spreading and compacting mechanically by using needle and surface vibrator, curing by hessian cloth, carriage for all leads; excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. The cement consumption for this item is 400 Kg/Cum. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. The total cementitious content will be 440kg/Cum. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. It will be the sole responsibility of the contractor to matchthe property of fly ash to Grade I of IS 3812 before being used in the works. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, processing the fly ash to specified grading, mixing the fly ash with cement etc.free of cost. It is the sole responsibility of the agency to transport the fly ash field no.2 of Boiler in CPP site. Processing the fly ash to specified grading. mixing the fly ash with cement etc. | |||||
| 6.1 | Up to Plinth Level. | 75 | Cum | - | - |
| 6.2 | Above plinth level. | 17 | Cum | - | - |
| 7 | Providing, laying and fixing in position TMT reinforcement bars of TATA/VIZAG STEEL/SAIL/JINDAL for RCC works, including cost of supplying, cutting, bending, transporting, erecting, binding with 16 gauge MS annealed wire, cement mortar spacer blocks etc. complete as per specifications and as directed by the Engineer in charge. | 8,300 | Kg | - | - |
| 8Centering and shuttering including strutting, Propping etc, and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., with water proof ply 12 mm thick complete as per specifications and as directed by the Engineer in Charge. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
ANNEXUREXI.pdf
Additional Documents • 0.09 MB
BOQ_949523.xls
BOQ • 0.30 MB
GCCMaintenanceWorks2023.pdf
Additional Documents • 24.43 MB
TD0202606.pdf
Tender Documents • 6.87 MB
TechnicalBids202606.xls
Tender Documents • 0.90 MB
AERBSAFETYGUIDE.pdf
Additional Documents • 0.23 MB
TENDERUNDERTAKING.pdf
Tender Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .