Loading…
Loading…
1,107 results • Recent activity
Construction of Fire Fighting Reservoir of 50000 Litres capacity at FSD Baripada, FSD Keonjhar, FSD Ranital and FSD Rupsa under DO Balasore Odisha Region ... 4th call.
Construction of E type Quarter two storied of R.W.Division-II, Bhadrak in the District of Bhadrak for 2025-26.
Construction of both side Flood Embankment of river Salandi from RD 86500m to 88500m (working RD 85.100KM to 86.300KM).
Construction of both side Flood Embankment of river Nalia from RD 23.100KM to 26.700KM
Construction of Flood Embankment on River Nalia right from Susua to Rajuali Bindha (Tiadisahi) from RD 5.900KM to RD 12.100KM
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) (3 (3 ))