Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,845 results • Latest
Printing Maplitho Paper (V3) Conforming to IS 1848 (Part 1) (Q2) (3 (3 ))
Bhavnagar Division:- Various modifications in LHB Coaches and power car.
1 KVAR & 3 KVAR metalized polypropylene gas filled capacitors
Vestibule Bellow Complete (LH side) for Gangway of LHB type coaches
Vestibule Bellow Top complete for Gangway of LHB type coaches
STAINLESS STEEL WASH BASIN.
Supply, Testing And Acceptance Of Hand Held Metal Detector., Delivery Days Supply Of Compatible 9V Rechargeable Batteries Of Suitable Capacity For HHMD., Supply Of External Battery Charger Suitable For Charging 9V Rechargeable Batteries For HHMD., Supply Of Cleaning Kit For Maintenance And Upkeep Of HHMD., Supply Of Sensitivity Adjustment Tool Compatible With HHMD.
Generalpurpose Machineryand Spindle Oils (V2) Conformingto IS493 (Q3)
BUFFING AND DRAW GEAR
Stainless Steel Window Bar.
12 V, 7 Ah Sealed Maintenance Free (SMF ) Lead Acid Rechargeable battery.
STANDARDIZED BRAKE DISC
Lifting Tackle assembly of 25 T
Paper-based Printing Services - Printing with Material; Question Paper; Offset, Paper-based Printing Services - Printing with Material; Answer Book; Offset, Paper-based Printing Services - Printing with Material; MAP OR GRAPH; Offset, Paper-based Printing Services - Printing with Material; PACHING ENVELOPE WITH STICKER OR PRINT; Offset
Note Sorting Machines (V2) (Q2)
Catering service (Event Based) - Breakfast; Veg; Regular Packet
Lunch Box (V3) (Q3)
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7
special repair and conservation of Talaja Buddhist caves including structural stabilization restoration of missing pillars and flooring works
External Repair and Repairing of new lab building DG Room Electric panel room and pot culture building CC paver block at CSIR CSMCRI Bhavnagar SH Balance work
Group Zone Work:Zonal Contract (2026-27) for Zone No. 5-A under ADEN-Dhola, Vartej- Sanosara, Sihor- Palitana Colony & station Building and Zonal Contract (2026-27) for Zone No. 5-C under ADEN-Dhola, All Level crossing, SSP, TSS All TRD Assets in Section Bhavnagar Terminus - Dhola & Sihor-Palitana Section.
Extension of Platform at 09 Stations. 1.Keshod 2. Sihor Jn 3.Jetalsar Jn 4.Bhavnagar Para 5. Navagadh 6. Joravarnagar 7. Liliya Mota 8.Virpur 9.Maliya Hatina.
Outsourcing of track maintenance activities under SSE(P.Way) Upleta in the jurisdiction of DEN/West/BVP for 02 years.
Extension of platform at Ranavav, Chorvad Road, Ranpur NSG-6 stations to accommodate 23-24 LHB coaches train.
Group Zone Work:Zonal Contract (2026-27) for Zone No. 9 under ADEN Junagadh, Jetalsar (Excl.) to Maliyahatina (Incl.) & Junagadh - Visavadar-Dhari (Incl.) & Visavadar -Talala( Exl.). + Zonal Contract (2026-27) for Zone No. 10 under ADEN Junagadh, Maliya hatina (Excl.) to Veraval (Incl.), Somnath, Veraval- Talala (Incl.) to Delvada & Prachi to Kodinar.
Group zone work: Zonal Contract for (2026-27) Zone No. 8 under ADEN Porbandar -Porbandar (Incl.)- Kanalus (Excl.)". + Zonal Contract for (2026-27) Zone No. 8/A under ADEN Porbandar "Jetalsar (Excl.)- Wansjalia
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Manpower Outsourcing Services - Fixed Remuneration - Others; Office Peon; High School
Replacement of Open well Submersible Pumpsets at
PVC flat moulding as per CWM/ PL DRG. NO. C/ CF-488/c, ALT- nil ITEM NO.-4; SIZE 38x3x2000 mm.
INSULATION MONITORING RELAY 110 VOLTS A.C
SE Safety Shoes - Leather with PVC Sole Brand: SE (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687754567209 dt.07/09/2026)
DAZE FURNITURES Mid-back Chair With Fixed armrest with Cushion Brand: DAZE FURNITURES (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687703089672 dt.25/07/2026)
Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 9 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 7 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 5 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Carbon Dioxide Fire Extinguisher; 2 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Dry Powder Fire Extinguisher; 9 Kg; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Foam Based Fire Extinguisher; 9 Litres; More than 5 Years, Refilling of Fire Extinguisher Cylinders - Water Based Fire Extinguisher; 9 Litres; More than 5 Years
Setting Gauge for LHB Control Arm Bush Assembly Fixture & Fixture for LHB Control Arm Assembly
WASHER FOR HEAD BRACKET FOR PRIMARY SUSPENSION OF FIAT BIOGIE
ALUMINIUM CRIMPING CONNECTOR.
ENTRANCE DOOR RUBBER SEALING GASKET
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Outstation 24*7
Calibration Services - As per scope of work; As per scope of work; As per scope of work; As per scope of work