Loading…
Loading…
4,504 results • Latest
Supply of construction material for the works of All schemes RD and Prd and Vbg-ram-g Gp raowala
AS PER NIT
Refined Sunflower Oil (V4) (Defence) (Q3), Refined Groundnut Oil (V4) (Defence) (Q3) (3 (3 ))
CS010020034: NON METALLIC EXPANSION JOINT FOR BETWEEN COMBUSTOR AND CYCLONE OF SIZE 24300 MM X 880 M
SPARES FOR AIR COMPRESSORS
Unbranded 1200 X 600 (Length x Breadth) in mm Dunnage Pallets Made From Recycled Plastic Wastes For Warehousing Applications Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Con
NIB FOR COMMISSIONING OF ICT LAB
E-Tender year 2026-27 construction material supply under VB G RAM G (MNREGA) scheme GP BIJERI
E-Tender year 2026-27 construction material supply under General scheme GP BIJERI
ROJHA RATE CONTACT FOR MATERAIL SUPPLY FOR VB-G RAM G MGNAREGA AND OTHER SCHEMES FOR GRAM PANCHAYT ROJHA FOR FY 2026-27
As mentioned and described in BOQ
As mentioned and described in BOQ
Safes (V3) ISI Marked to IS 550 (Q2) (3 (3 ))
As mentioned in BOQ
Electric fitting work at 6 Nos. Barrack at Police Line Bikaner
Construction and Insttalation of Drill Nursery at PTS Bikaner
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
Modification of sole bar
Jointing sheet, Steel sheet carbon hot roller 1800x900, Anabond RTV slicon sealent 734, Elect welding rod, Soldering soft wire
Processor CORE I-5, Mother Board, BTY 12V 7AH Exide, Bty 12V 7 AH Exide Small, Power supply card
PROCUREMENT OF SPARES FOR ESP BHEL
CONSTRUCTION OF TUBEWELL VILLAGE DUSHARNA PANDRIK JI
HQ_Med_Sur_(PH NO.:47080) PRESTERILE POWDERED DISPOSABLE SURGICAL GLOVES SIZE 6.5
CE010510004: RETROFITTING OF SIEMENS MAKE S120 DRIVE INCLUDING ALL ACCESSORIES
Nylone Bush Size -41 x 30 x 16 mm.
Take up spring for IRSA-600 type slack adjuster.
Secondary brake beam assembly.
RATE CONTRACT OF MATERIAL SUPPLY AND EQUIPMENT PROCUREMENT FOR VB-G RAM G AND OTHER ALL YOJNA YEAR 2026-27 GRAM PANCHAYAT SIYASAR PANCHKOSA PS POOGAL
CHC kshetra ki siwirline se nishkashit upshisht pani ke niyantran hetu structure nirman kary Bhadla road ke pass , panchoo
Kheteshwer kuaa kshetra ki siwirline se nishkashit upshisht pani ke niyantran hetu structure nirman kary Sengal road ke pass , panchoo
ra u ma vi kshetra ki siwirline se nishkashit upshisht pani ke niyantran hetu structure nirman kary dharmlai nadi ke pass , panchoo
Liquid Chlorine, Technical conforming to IS 646 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of Integrated College of Yoga, Ayurved and Naturopathy at Bikaner (Excluding cost of cement)
E-BID-08-2026-27 WORK NO 12
E-BID-08-2026-27 WORK NO 09
E-BID-08-2026-27 WORK NO 06
E-BID-08-2026-27 WORK NO 04
E-BID-08-2026-27 WORK NO 03
Electrical work in c/w Provision of 3 mtrs wide FOB at Suchan Kotli, Satroad, Baraguda, Jakhod Khera, Jita Kheri & Zerpur Pali stations of Bikaner Division and Provision of an additional high level passenger platform at Ding station of Bikaner Division along with FOB & all requisite passenger amenities.
Supply of stone Ballast(machine crushed) 65mm gauge as per specification of RDSO track ballast of IS/RDSO-GE/0001:2023 February 2023 in connection with Track work for Provision of an additional PFNo.3 by slewing of line No.5 and TWS work at Sirsa station of Bikaner Division.