Loading…
Loading…
563 results • Latest
Construction of Balance work Health Sub Centre building at Chokhna Tehsil Ghumarwin Distt. Bilaspur H.P.SH Providing and laying W.S. and S.I therof, 2. C/o Breast wall Back side AND Left side,Edge wall, 3. C/o Boundary wall and Gate, 4. Providing
Construction of link road Village Kothi in G.P. Kothi SH Formation cuting at RD 0/330 and Construction of R.C.C Slab culvert 3.00 mtr span at Rd 0/340 Under MMSY
Construction of link road from Kullarun to DAV School to Civil Court Ghumarwin SH Construction of Hume Pipe Culvert at RD 0/040 and Interlocking Paver Blocks at km 0/00 to 0/080Under DMFT
Providing and fixing lift along Matri Sharan Building for Temple Trust Shri Naina Devi Ji Distt Bilaspur (HP) (a) (Sub Head Civil work of lift)
Balance work of Special repair to Govt. Sanskrit College at Dangar Tehsil Ghumarwin District Bilaspur H.P.SH Providing and fixing Tiles, Painting , Distempering AND White washing etc Deposit work
Restoration of rain damages on Barota to Kudi Ghat road km 0/00 to 1/500 SH Providng and laying Cement concrete pavement at RD 0/900 to 1/016.50 and R/wall at RD 1/305 to 1/315 under PDNA year 2023.
Construction of link road Gehra Sumari G.P. Bharari to Baroun SH Improvement / widening of road at RD 0/030 to 0/095, C/o Breast Edge wall Left side at RD 0/037 to 0/055 and Right side at RD 0/043 to 0/055 and V-shape drain at RD 0/00 to 0/104 Un
Construction of link road to village Puwai G.P. Panol SH Balance work of Providing and laying cement concrete pavement in km 0/610 to 0/650 Under MMSY
C/o Link road to lower patta from Bhadrog SH Metalling and Tarring at RD 0/365 to 0/565 and Retaining wall at RD 0/076 to 0/084 under SDRF/NDRF
DEVELOPMENT OF COMMERCIAL FACILITY AT AUHAR ON NH 154 TEHSIL GHUMARWIN DISTRICT BILASPUR HIMACHAL PRADESH ON DBFOT BASIS UNDER PPP MODE