Loading…
Loading…
418 results • Latest
Construction of link road Karloti to Sunali road SH Providing and laying cement concrete pavement at various damaged reaches in km 2/679 to 2/767.50 and 3/020 to 3/220 Under SDRF/NDRF
Restoration rain damages on Jol to Hari Devi road km0/00 to 1/500 SH C/o U-shape drain at RD 1/200 to 1/500 and Providing and laying RCCNP2 pipe.
Tatkal Reservation Slip, Advance statement of Gross earnings and traffic handled and Caution order.
(SH. Dismentling/relaying and testing of DI pipe 150 mm dia for shifting existing pipe and P/L jointing and testing of 200 mm dia DI pipe and C/o RCC Pillars for crossing damaged portion at village Nand Behala (Toba) near H/O Sh. Bachnau Ram)
(SH. Construction of diversion bandh and chhanel and repair of distribution system with dismentalling, relaying jointing and testing of GMS pipe with butt welding joints various dia at various locations).
(SH. C/O of RCC intake chamber and white washing of WTP, Pump house etc.)