Loading…
Loading…
56 results • Latest
Improvement of Moti Kundal to Vavdi Road (NP) Km.0/000 - 4/450 Ta.Gadhada Dist.Botad (MMGSY NORMAL ~ 2025-26)
Construction of Various Roads of Botad District Under Suvidhapath Scheme PKG.No.RPC-2/BTD/2026-27/P.01 Ta.Gadhada District.Botad
Construction Work of Toilet Block, Water Room and PVC False Ceiling as Per Various Location At. APMC Botad Under Self-Fund.
Construction of CC Road at Malpara Village From Dhasa Gadhada Highway to Secondry School Ta. Gadhada Dist. Botad
Construction of Gram panchayat Building at Various villages of Botad taluka (Package no. BTD/ CDP-5 /GP /Pac 6/ 2026-27), Dist. Botad. (Bodki, Gadhali East)
Construction of Library Hall at Ratanpar Village Tal.Gadhada Dist. Botad
Construction of Gram panchayat Building at Various villages of Botad taluka (Package no. BTD/ CDP-5 /GP /Pac 7/ 2026-27), Dist. Botad. (Sitapar, Ingorala Gi.)
Construction of Gram Panchayat Building at Village Ishvariya Ta. Botad Dist. Botad
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 km x 320 hours; Outstation 24*7