Loading…
Loading…
6 live1 closing this weekmost from Northern Railway and Central Police Organisation
6 results • Latest
Electrical Balance work for washable apron PF lines, Parcel office, water supply system (RO plant, O/H & UG tanks) and water recycling plant including service road in c/w construction of coaching terminal shakurbasti.
Electrical balance works in connection with Development/Redevelopment/Major Upgradation of Ghaziabad Railway Station of Northern Railway.
Metallazing of floor members of OWG at Br.52/DN on GZB-MB,Span No. 01 to 04 of Br.1137S/L & top flange,top lateral bracings,cross frame top angle and rest area by painting of Br.1062UP on BE-MB,Br.126 & 5 on BE-ALJN,Br.89UP on MB- GZB,Br.1232DN,1249UP&DN,1254DN,1255UP,1258DN on MB-SRE,Br.No.139 on HW-DDN,Painting of floor members of Br. 6SL on RWL-RKSH,Br.12A on GJL- MZM,Br.21UP on LRJ-HW,Br.43-A UP&DN on MB-GZB,Br.1268UP on MB-SRE & Through metallizing of Br.1244 UP&DN on MB-SRE over MB div.
Replacement of badly corroded Lateral bracings, X-Bracings, Gussets and top flange plates of Br. No. 19DN (8X12.2), 22DN (6X12.2), 36DN (4x12.2m), 44DN (2x6.1m+1x12.2m), 58A UP (9x12.2m) (Only Top flange replacement), Br. No 77UP (2x12.2m), 116UP (1x27.14m+1x12.2m) on MB-GZB Section over MB Division.
Echo Cardiography Scanning Machine (V2) (Q2) (3 (3 ))