Loading…
Loading…
14,285 results • Latest
CONSTRUCTION OF PERMANENT RCC BRIDGE OVER RIVER ADAYAR AT OTA CHENNAI (PH II) (SPL WORK) (EXTERNAL ELECTRIC AND WATER SUPPLY) AND SPL REPAIR REPLACEMENT AGAINST QTY 06 X SPLIT AIR CONDITIONER DECLARED BER SQAE (V) CHENNAI UNDER GE STM
CONSTRUCTION OF BOUNDARY WALL IN THREE LOCATIONS AT ARMY CAMP PALLAVARAM AND MEENAMBAKKAM TO SAFE GUARD DEFENCE LAND FROM ENCROACHMENT UNDER GE STM CHENNAI
C18M260003 Free end bearing assembly NDE, Locating bearing assembly DE
Additional Spares for W6 Routine of Three Main Engine
1000 hourly routines of main engines (Volvo Penta) of 9.2M work boats
Train set pre fabricated Socket-A cable assembly as per clause 4.41 of RDSO Specification No. RDSO/PE/SPEC/EMU/0196-2019(latest) along with latest Annexure and Addendum/Corrigendum to M/s Harting par