98 live55 closing this weekmost from Public Works Department and Minor Irrigation Department
98 results • Latest
Construction of an Over Head Tank of 25KL Capacity at Poojarihatti Village Of Atthimagge Grama panchayath of Hosadurga Taluk, Chitradurga District. (Category-1 Reservation)
Construction of an Over Head Tank of 25KL Capacity at Gadiyappanahatti Village Of Atthimagge Grama panchayath of Hosadurga Taluk, Chitradurga District. (Category 2A Reservation)
Package 06 Construction of Over Head Tanks of 25KL Capacities at Doddathimmayyanahatti Village and Hullukatte Lambanihatti Villages of Atthimagge Grama panchayath of Hosadurga Taluk, Chitradurga District. (Category Scheduled Tribe Reservation)
Package 05 Construction of Over Head Tanks of 50KL Capacities at Obalapura Village of Heggere Grama panchayath and Arehalli Village of Mathodu Grama panchayaths of Hosadurga Taluk, Chitradurga District (Category Scheduled Tribe Reservation)
Package 3 Construction of Over Head Tanks of 50KL Capacities at Ajjayyanahatti Village of Kanchipura Grama panchayath and Dalavayikatte Village of Heggere Grama panchayath of Hosadurga Taluk, Chitradurga District (Category Scheduled Caste Reservation)
Construction of a concrete road at 2nd Cross Road in the E and F Blocks of the main market yard of the APMC Chitradurga UNDER SCHEME OF MARKET DEVELOPMENT FUND 2026-27
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Preparation of Detailed Project Reports (DPRs) for Upgradation of 111 existing Anganawadi Buildings in Hiriyuru Taluk Chitradurga District.
Const of C.C road from Yallamma temple to Allmaradahatti road in Suragondanhalli Bhovi Colony in Hiriyr Taluk.
Construction of Toilet room for Govt P.U college in Hiriyur town (Junior College Gilrs )(CAT-2A)
Construction of Samudaya Bhavana Near J J Hatti Maramma temple at Ward No 28 in Chitradurga town (CatII(A)
Improvements to road Patrehalli to Hoysalakatte cross road via Gollarahatti, Malagondanahalli, Madenahalli, Dindavara, Pilali, Kallenahalli, Dasoodi road from Ch 6.00 to 20.00 km in selected reaches in Hiriyur Taluk (Working Chainage 7.85 to 10.00 km and 10.40 to 13.00 Km)
Improvements to road Eshwaragere to Thimmalapura cross via Hoovinahole, Myadanahole road from Ch 0.00 to 9.07 km in selected reaches in Hiriyur Taluk (Working Chainage 0.30 to 3.60 and 3.90 to 9.07 Km)
Improvements to road Maradihalli to Maddihalli road via M.D.Kote, Maddanakunte, Kandikere, Rangenahalli, Shidlayyanakote, Gulya, Hosahalli, Suguru, Khanajanahalli, Betur, Hosakere, Khandenahalli road from Ch 33.00 to 57.44 km in selected reaches in Hiriyur Taluk (Working Chainage 37.64 to 37.84 Km and Km 50.24 to 56.94 Km)
Improvements to road Maradihalli to Maddihalli road via M.D.Kote, Maddanakunte, Kandikere, Rangenahalli, Shidlayyanakote, Gulya, Hosahalli, Suguru, Khanajanahalli, Betur, Hosakere, Khandenahalli road from Ch 0.00 to 7.70 and 7.90 to 15.39 km in selected reaches in Hiriyur Taluk (Working Chainage 0.00 to 7.70 Km and 7.90 km to 9.43 Km)
Improvements to road Connecting road from State Highway-19 (National Highway 150 A) Srirangapattana to Jeevargi road and National Highway-4 road from Ch 3.00 to 7.00 km (Via Somerahalli, Lakkanal) Balance Work in Hiriyur Taluk Chitradurga District. (Working Chainage 3.00 to 7.00 km)
Improvements to road Connecting road from State Highway-19 (National Highway 150 A) Srirangapattana to Jeevargi road and National Highway-4 road from Ch 0.00 to 3.00 km (Via Somerahalli, Lakkanal) Balance Work in Hiriyur Taluk Chitradurga District. (Working Chainage 0.00 to 3.00 km)
Improvements to State Highway-24 Tarikere to Dharamapura road via Hosadurga, V.V.Pura, Hiriyur road from ch 100.88 to 123.83 and 127.78 to 134.85 in selected reaches in Hiriyur taluk (Working Chainage 101.98 to 103.77 and 109.18 to 109.93 Km)
Improvements to State Highway-24 Tarikere to Dharamapura road via Hosadurga, V.V.Pura, Hiriyur road from ch 79.94 to 81.44 and 83.47 to 91.31 in selected reaches in Hiriyur taluk (Working Chainage 87.75 to 86.18 and 86.22 to 91.31 Km)
PROVIDING IRRIGATION FACILITY BY DRILLING BOREWELL TO LAND OF SRI DEVRAJ BIN MARAPPA BEARING SY NO 105 OF LAKSMISAGARA VILLAGE IN CHITRADURGA TALUK CHITRADURGA DISTRICT.
PROVIDING IRRIGATION FACILITY BY DRILLING BOREWELL TO LAND OF SMT GOWRAMMA COM HANUMANTHAPPA BEARING SY NO 72/4 OF BEERAVARA VILLAGE IN CHITRADURGA TALUK CHITRADURGA DISTRICT.
PROVIDING BOREWELL IRRIGATION FACILITIES TO SHIVANNA S/O THIMMAPPA OF UGANIKATTE VADDARAHATTI OF HOLALKERE TALUK CHITRADURGA DIST(RESERVED FOR CATEGORY-I CONTRACTORS ONLY)
Providing Basic Infrastructure Facilities (High Mast light, solar light, road, etc) for Medara Colony at Hosadurga town Hosadurga Taluk
PROCUREMENT OF CO ORDFINATORS IN AYUSHMAN BHARATH AROGYA KARNATAKA SCHEME TO DIST HOSPITAL-3 CLAIM EXCECUTIVES AND TALUK LEVEL HOSPITAL-5 CLAIM EXCECUTIVES OF CHITRADURGA DIST
LIFT IRRIGATION SCHEME FOR FILLING UP OF HALAGALADDI, MADDIHALLI, KHANDENAHALLI, BETHURU AND OTHER TANKS FROM DHARMAPURA TANK IN HIRIYUR TALUK, CHITRADURGA DISTRICT, Detailed Investigation & Conducting Survey, Design and Construction of Civil Works such as Intake arrangement, Jack well cum Pump house, chain link fencing & gate for Pump house yard and Design, supply and installation of Electro Mechanical components such as required capacity of Pumps and Motors, installation of 11 KV Switch Yard, 11KV / 433V Transmission line and Design, supply and laying of MS/HDPE Rising main Pipeline and Pressure Distribution Network canal crossing, road crossing, railway crossing / high way crossing by pipe jacking/horizontal drilling method, road restoration, utility shifting, Surge analysis, Tanks improvement works & Facilitating for land acquisition, Crop compensation, obtaining permissions from concerned Departments and other statutory clearance from the competent authorities for the successful running of Tank filling scheme for Filling of Water to the designated Tanks & other allied components including operation & maintenance for a period of Five years after successfully commissioning of the scheme on Turnkey basis.
WORK OF FILLING THE GOKATTE AT HARIYABBE VILLAGE, HIRIYUR TALUK, CHITRADURGA DISTRICT, BY PROVIDING PIPELINE AND INSTALLING PUMPING MACHINERY(INCLUDING 5 YEARS O&M)
CONSTRUCTION OF CHECK DAM TO JEEGALAYYANAKATTE HALLA FLOWING NEAR KADARAPPANAHATTI IN MAYAKONDA ASSEMBLY CONSTITUENCY.
TANKER SUPPLY TO SUPPLY POTABLE DRINKING WATER TO THE DROUGHT AFFECTED MOLAKALMURU TALUK IN CHITRADURGA DISTRICT
Tender inviting for Catching Stray Dogs, Implementing the Animal Birth Control (ABC), Anti Rabies Vaccination (ARV) Programme in TP Molakalmuru limit.
Tractors (V3) (Q2)
Installation of CCTV cameras at Important Places of Challakere CMC limits
Setting-up of Polymer Production Plant, Monomer Recovery System, Effluent Treatment Plant and Associated Tank Farm at BARC, SMF, Challakere through Engineering, Procurement and Construction (EPC) mode
Facility Management Services - LumpSum Based - Commercial; O&M of Electrical Work, O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Commercial; O&M of Mechanical Work, O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Hospitality; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
IMPROVEMENTS TO HONNANAYAKANAHALLI VILLAGE TANK IN CHANNAGIRI TALUK DAVANAGERE DISTRICT
Improvements to Karekalkere Tank Bund From Ch.600.00M to Ch.1100.00 M and From Ch.2000.00M to Ch.3900.00 M in Challakere Taluk ,Chitradurga District.
IMPROVEMENT OF GOKATTE ACROSS BASAVANAHALLA NEAR KADUREDEVARAHATTI VILLAGE IN HOLALKERE TALUK CHITRADURGA DISTRICT
IMPROVEMENTS TO GOKKATTE NEAR MALLASINGANAHALLI VILLAGE IN HOLALKERE TALUK,CHITRADURGA DISTRICT
IMPROVEMENTS TO GOKATTE NEAR KUNABEVU VILLAGE AND IMPROVEMENTS TO BAVI AND NALA BELOW TANK OF KADABANAKATTE VILLAGE IN TURUVANURU HOBLI CHITRADURGA TALUK AND DISTRICT
Raising of 15000 No,s 10x16 size polythene bagged seedlings at Molakalmuru Social Forestry Range Obainahatti nursery during 2026-27. (Category Reserved for SC)
Raising of 15000 No,s 10x16 size polythene bagged seedlings at Challakere Social Forestry Range Talaku nursery during 2026-27. (Category Reserved for Cat-1)
Raising of 24000 No,s 10x16 size polythene bagged seedlings at Hiriyur Social Forestry Range Metikurke nursery during 2026-27.
Raising of 3000 No,s 10x16 size polythene bagged seedlings at Holalkere Social Forestry Range H D Kanive nursery during 2026-27. (Category Reserved for SC)
Raising of 10000 No,s 10x16 size polythene bagged seedlings at Hosadurga Social Forestry Range Kumbaragatte nursery during 2026-27.
Raising of 15000 No,s 10x16 size polythene bagged seedlings at Molakalmuru Social Forestry Range Arundhati nursery during 2026-27. (Category Reserved for CAT-IIA)
Preparation of Detailed Project Reports (DPRs) of a) Upgradation of 1 hostel in Javanagondanahally, Hiriyur Taluk Chitradurga District. b) Upgradation of 05 hostels in Challakere Taluk, Chitradurga District of Tribal welfare Department
Preparation of Detailed Project Reports (DPRs) of a) Upgradation of 20 hostels in Hiriyur Taluk, Chitradurga District b) Upgradation of 14 hostels in Challakere Taluk, Chitradurga District of Social welfare Department