Loading…
Loading…
7,211 results • Latest
Online Notice Inviting Tender for Additional Work Of Double Storied CPC Building For Areca Nut Processing Claster Project at Dist Darjeeling Under WBKVIB
Tarun Sangh Bhawan renovation, Phoobsering T.E. Village No.03 (Lebong Valley-I GP).APAS/01/023/121/0001
Chain Link Fencing foe Seer Godown at Mungpoo Division at Government Cinchona Plantation, Mungpoo
Installation of Solar Street Lights at Ward No.X, Lamahatta GP
Construction of Additional Rooms at Community samaj Ghar, Lamahatta GP
Installation of Solar Street Light from GL Dhura to Rongchong. Rongchong GP
Construction of C.C Track from Pipli Dara to Dil Bahadur House, Rampuria Khasmal, Pubong GP
Repair and Renovation of Principal Secretarys Residence (Cottage No 25) at Pintail Village, GTA.
Protection Wall at Aap Dara, Kimbu Dhyra, Rongchong GP
Drain from Salim Rai house to Buddha Thapa house at Dinesh Gram, Rongchong GP
Repairing of Road at Radha Krishna Mandir Gaon, Lamahatta GP
Repair Maintenance and servicing of EOT Crane 2 Ton
Deployment of High skilled manpower for 24 months at Rammam HPP withextended for a period up to three (3) months
Supply and commissioning of IGBT based constant/current/constant voltage battery charge/discharge panel (155V-100A) as per annexure
Granular Sub Base, WMM 150mm thick, Sand cushioning, Kerb stone M-50 Grade, Interlocking tiles M 50 grade not exceed 0.0264 sqm., 400 Micron Polythene Sheet, poly urethane sealant, Synthetic Enamel Paint, Primer for Kerb Stone, Cement OPC 43 grade, Fine aggregate Sand, Coarse aggregate 40mm, Quick Setting Compound 225kg barrel, Form work, Precast RCC Drain Cover, Transparent pipe 5mm dia, Plaster trowel with wooden handle, Fish line, Galvanised iron pan mortar Tasla, Picks axes with chiesel and point ends Kudali 14 CP, Showel square nose 14 gauge, Multipurpose non-slip rubber reusable gloves, Brick trowel steel 305 mm, Gum boot, Plaster Rod 1.2 M, Water Bucket steel, Crow Bar 5.1 Kgs, Measuring Tape 5 Mtr, Measuring Tape 15 Mtr
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
Repair and extension of service pathway from Herbivore enclosure-1 to 4 at PNHZ Park, Darjeeling
Repair, Partial Replacement of GCI Sheet Roofing including Framework, Thorough Replacement of Wooden Ceiling and Exterior Painting Works at Main Building of Kurseong College, Kurseong.
Restoration of Landslide below Lesser Carnivore enclosures by way of providing Gravity wall or RCC retaining wall at PNHZ Park, Darjeeling
SUPPLY OF LAB CONSUMABLES FOR DNA EXTRACTION KITS AT PNHZ PARK, DARJEELING
SUPPLY OF LAB CONSUMABLES (REAGENTS AND KITS) FOR BLOOD CELL COUNTER AND ELECTROLYTE ANALYZER
Construction of Bituminous road (600x3mt) from Bhojnarayan TE factory to Tutha Pakri with in Hetmuri Singhijhora GP under Phansidewa Development Block.
Upgradation of entire electrical distribution network including replacement of old damaged type wirings at bed rooms, bathrooms, passage including re-arrangement of security lights at Purneswari Girls Hostel within NBU main campus
Upgradation, replacement and rearrangement of entire electrical distribution system (Old block and Ground Floor of New block) including rearrangement of building security light at Central Library Building within main campus of NBU
Supply and laying of Underground Cable (for double source) of Chemistry Department from Salbagan Control Room within the main campus of NBU.
Day to day maintenance of university roads, drainage system, culverts, boundary wall and other infrastructures within the main campus of NBU
Upgradation of entire electrical distribution network system including replacement of old damaged type aluminum wirings at Nivedita Girls Hostel within NBU campus.
Construction of Burning Ghat at Lalpul Naxalbari GP, Naxalbari Block.
Supply and laying of Underground Cable including re-arrangement of main service cables for all Professor quarter in the Himalayan Sector of N.B.U. main campus
Partial modification of University Khelaghar for setting up of one Store Room within the main campus of NBU
Installation of Solar Street Light (8 Nos) at different Points of Suntalay Dhura Booth No.107, Labdah
Setting up of Solar Street Light (3 Nos) from Jai Bahadur Rai house to Khagen Tamang house, Takdah GP
Construction of water tank near Sanjay Chettri house at Soureni T.E.
Repair and Renovation of Office building of S.I office Mongpoo Circle (Primary Education) at Mongpoo Under Education Department, G.T.A.
Construction of C.C. road from Sim Forest to Dobata, Singrimtam GP
Installation of Solar Street Light at Ward No. IV (10 nos), Takdah GP
Setting up of Solar Street Light (3 Nos) from Rock Garden main Road to Bhakti Villa, Takdah GP
One time Repair & Rehabilitation of 12 nos CPM 401 (part no 40104546)/ CPM 402 (part no 40110453) cards of EMD LCC based 4000 HHP WDP4/ WDG4 Diesel Locomotives at SGUJ Diesel Loco Shed for a period of One (01) year.
Repair and renovation of room no. 346 at the second floor of Chemistry Department within NBU main campus
constt of gallery at Dr Z hussain Buty Girls MAktab premises
Const of eaves gutter WAQF estate JAma MAsjid, Wazu Khana DArjeeling
Day to day maintenance of University Roads, Drainage System, Culverts, Boundary Walls and other infrastructures within the main campus of NBU.
Sports equipemt for warrior Tae Kwonda Dojang
Construction of Drainage Channel from the house of the Purna Bahadur towards Rupen Thapa near Veterinary Office, Takdah GP
Installation of Solar Street Light at Booth No. 42(15 nos), Maneydara GP
SPL REPAIR TO BLDGS AT OLD KP AREA AND CS AREA UNDER AGE BR II AND AGE EM OF GE BENGDUBI
Construction of drain i) s/f Ranjit Paswan house to Kalashore Mallick house near Malati hotel at Sraban Nagar ii) Ratan Biswas house to Chandini Paswan house at Raja Ram Mahan coloney iii) Tapan Das house to Nitai Majumder House ...W-20