Loading…
Loading…
7,094 results • Latest
SHEET CELLULAR, PLYWOOD, PAPER WRAPPING BROWN UNGLAZED 560MM X 7 20KG, CLOTH MUSLIN BLUE, LEATHER CLOTH CREAM, REXINE FOAM BLACK, PLASTIC TRANSPARENT
GTA/DWO/ BCW/ NIeT-04(Sl No 10)/2024-25
GTA/DWO/BCW/NIeT-09(Sl. No. 01)/2025-26
GTA/DWO/BCW/NIeT-09(Sl. No. 02)/2025-26
GTA/DWO/BCW/NIeT-09(Sl. No. 04)/2025-26
GTA/DWO/BCW/NIeT-09(Sl. No. 05)/2025-26
GTA/DWO/ BCW/NIeT-10/2025-26
GTA/DWO/BCW/NIeT-09(Sl. No. 03)/2025-26
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
Supply, Installation and Finishing of Resilient Linoleum Sheet Flooring with Adhesive
High performance work PC, Microsoft Surface Book Laptop, Ultra Slim Laptop
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2), Soap Dish - Case (Q4), Bell push MODULAR TYPE, Cover plate for modular switch 2 modular, Cover plate for modular switch 3 modular, Cover plate for modular switch 8 modular, Modular stepped type regulator, Modular Switch 10A 1 Module with cover plate complete, Modular Switch 20A 2 Module with cover plate complete, Modular type switch 16 Amp, Switch socket combination Delux 6 Amp piano type, with shutter and 2fixing holes, surface mounted indoor commercial green square LED luminaries 20 Watt size 2 x 2 Feet, Geyser hot or cold water ss connection pipe 600m long, Casing N caping of size 25 x 16 mm Double locking System, Tape insulation off sizes 25MM x 25 mtr
A4 Paper, Legal Paper, Trans Tape 2 Inch, Brown Tape 2 Inch, Trans Tape 1 Inch, Dusting Cloth, Carbon Paper, File Binder, Policy Folder, Stapler Small, Stapler Large, Stamp Pad, Stamp Pad Ink Blue, Stamp Pad Ink Red, Tape Dispenser, Glue Stick, Photo Signing Pen Green, Cutter, Cutter Blade, Canteen Offr Stamp
LED Bulkhead Light (Q3), LED Batten Light (LED Tube Light) (V2) (Q2), Towel Ring (Q3), Towel Rail (Q3), PLASTIC BIB TAPS, PILLAR TAPS, ANGLE VALVES & STOP VALVES FOR HOT & COLD WATER SERVICES Conforming to IS 9763 (Q3), Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2) (3 (3 ))
Extra Corporeal Shockwave Therapy Unit with focused and unfocused probe
Drug and pharmaceutical items
Heatx, Wall mount TV Stand, switch box, 1MM 3 Core cable, Havels socket and switch, 15Amp switch and socket
Haldi Powder
BUSHING SLEEVE, BOOT, PACKING MATERIAL 76546185, GASKET, PIN RETAINING, RING SEALING TOROIDAL, PACKING 313, AUTOMATIC CIRCUTE BRAKER AZS10, AUTOMATIC CIRCUTE BRAKER AZS15, PIPE ASSY, SPRING HELICAL COMPRESSION, PACKING PREFORMED, GASKET 76546292, PACKING, HOSE ASSY, BELT, PRESSURE SENDING UNIT, SEAL PLAIN
Synthetic Web Equipment Improved Version (MHA) (Q2)
Repair and Overhauling Service - built up trucks; EICHER; Yes; Buyer Premises
media control systems or wireless presentation system (Q2) ( ( 3 3 ))
Circular Sheathedwith Rigid Conductor (V2) ISIMarked To IS694 (Q2)
Cellulose Nitrate Filter Paper (V2) (Q3)
LAB CONSUMABLES
PLYWOOD GD I9, SHEET CELLULAR, ROD WELDING HARD FACING 3.15MM, THROTTLE CLEANER, ARALDITE, THREAD ROLL, WIRING CLIP, ANABOND, PAINT RED OXIDE
Anti Fatigue Mat (Q3)
Slope stabilisation work to protect landslide at 0.150 km of Lebong Cart Road under Darjeeling Division in the district of Darjeeling.
Slope stabilisation work to protect landslide at the backside of Richmond Hill under Darjeeling Division in the district of Darjeeling. (Approach road to DM Bungalow)
Repair, painting, renovation and other allied works at existing Excise Office cum barrack, Darjeeling and Construction of godown and boundary fencing (front face) at Excise Office premises, Darjeeling, under PWD Darjeeling Division during 2025-2026
Slope stabilisation work to protect landslide in between chainage 0.00Km to 7.00Km at Hillside and Valleyside damaged due to heavy rainfall on 05th of October 2025 of Lebong Cart Road under Darjeeling Division in the district of Darjeeling.
Renovation of Dukha Sewa Samaj Ghar (Dabaipani GP).APAS/01/023/140/0001
Const. of Drain from Bikash Rai house to Bine Rai land , Approx-01 KM (Dabaipani GP).APAS/01/023/139/0005
Const. of Drain from Sangham house to Arpan house, Approx-01 KM (Dabaipani GP).APAS/01/023/139/0004
Const of Drain from Bhanu house to Deepak Chettris house
Repair of road from Zero point to Ambotey, Approx-01 KM (Dabaipani GP).APAS/01/023/139/0002
Repair of road from Upper Subhan Dhora to lower Subhan Dhora (Dabaipani GP).APAS/01/023/139/0001
Const. of pony road from Panchayat Bhawan to Bibek Rai, Dist.-500 Mtr Approx (Dabaipani GP).APAS/01/023/138/0004