Loading…
Loading…
7,408 results • Latest
Construction of a Chabutra at Ranratand under Daludih Panchayat (2) Construction of a Chabutra near Bagdaha Mandap under Bagdaha Panchayat (3) Construction of a Chabutra near Dharkiro School under Dhavachita Panchayat (4) Construction of a Chabutra
Construction of a 300 ft PCC road from R.S. Resort to Bharat Residence under Amarpur Panchayat (2) Construction of a 200 ft PCC road in front of Anwars house at Parbatpur Neeche Tola under Bada Nawatanr Panchayat.
Construction of a guard wall from the madrasa towards Ramashish house in Fakirdih Tola under Karmatand Panchayat.
Construction of Marriage Hall in Brahman Tola under Madanadih Panchayat.
Construction of a shed at a public place under Pandra East Panchayat (2) Construction of a PCC road from Pandra More on the PWD road to Rajesh Bauri house under Pandra West Panchayat.
Construction of Marriage Hall at Mandal Tola under Ramkanali Panchayat.
Construction of a shed in front of Bishu Tudu house at Ramnagar under Barwatand Panchayat.
Construction of a shed beside the land of Mohan Soren, son of Late Babulal, at Bariyarpur under Maniyadih Panchayat (2) Installation of paver blocks in front of the cemetery under Maniyadih Panchayat.
Construction of a shed at a public place under Lokbad Panchayat.
Construction of a 200 ft PCC road from Main Road to outside Durga Mandap in Sahut Colony under Gomo South Panchayat (2) Construction of a 25 ftx25 ft shed in Ari Colony under Gomo South Panchayat.
Installation of paver blocks measuring 100 ftx15 ft in front of Rakesh Prasad house at Sahobahiyar under Madaidih Panchayat.
Construction of a drain for disposal of water from the pond at Khatal up to the previously constructed drain near the District Council under Bhamal Panchayat.
Installation of a hand pump near the Panchayat Bhawan in Banda village under Banda West Panchayat (2) Installation of a hand pump in front of Mangal Marandis house in Tola Sahar Ghutu village under Ledahariya Panchayat (3) Installation of a hand pump
Installation of a hand pump near Chiranjits house in Karabad village under Ekakendra Panchayat (2) Installation of a hand pump in front of Mantu Gops house at Kalubathan under Kaliasol Panchayat (3) Installation of a hand pump in front of Hazaris hou
Construction of a 200 ft drain from Chandrika Singhs house to Jitendra Singhs house in New Colony Putki under Siyalgudri Panchayat (2) Installation of a solarpowered water tower at the hand pump near Savadih Anganwadi under Petiya Panchayat.
Installation of a submersible pump in the boring inside the compound wall constructed at Mandra along with installation of a 2000litre water tank with RCC water tower and water supply through pipeline under Mandra Panchayat (2) Construction of a bath
Construction of a 50 ft bathing ghat and 150 ft drain at the lower side of the pond at Basjodia under Lachhurayadih Panchayat (2) Installation of a water tower in front of the house of Pradeep Murmu at Basaha under Begnaria Panchayat.
Renovation of Anganwadi Centre Dumariyatand under Govindpur Block in Dhanbad Dist.
Installation of a hand pump in front of Reena Sharma house at Daludih under Daludih Panchayat (2) Installation of a hand pump in front of Suresh Pramanik house under Raghunathpur Panchayat (3) Installation of a hand pump in Muslim Tola under Raghunat
Installation of a hand pump at Turi Tola under Birajpur Panchayat (2) Installation of a hand pump beside the church at Asanbani-1 (3) Installation of a hand pump beside the cemetery at Kurmidih under Bada Pichhri Panchayat (4) Installation of a hand
Construction of a 50 ft bathing ghat in the pond behind the house of Haji Rahmat at Bastipur under Godtopa Panchayat (2) Construction of a 50 ft bathing ghat in the pond in front of Karbala under Godtopa Panchayat (3) Construction of a 50 ft bathing
Construction of a shed at Neemdanga under Kalimati Panchayat (2) Construction of a shed in Brahman Tola under Medha Panchayat.
Renovation of Anganwadi Centre Babu baharadih under Govindpur Block in Dhanbad Dist.
Construction of Health Sub-Centre at Lukaiya, Block -Tundi, District - Dhanbad (Jharkhand)
Renovation of Anganwadi Centre Uper Ankura under Govindpur Block in Dhanbad Dist.
Renovation of Anganwadi Centre Ghoskadih under Govindpur Block in Dhanbad Dist.
Complete Repairing of 400 Amps 3.3 KV Sait Mineline Make VCB Switch Sl.No.1216 and Local Id.No. BCCL/JG/SW/3.3KV/61 for Power Controlling of 3.3 KV side of Power Transformer at 6 pit Bararee of Amal. Joyrampur Colliery under Lodna Area.
Dismantling Erection and Rectification of 220 Volts Overhead Lighting Line of Jealgora 16 No. Basti at Jealgora Colliery of Amal. Joyrampur Colliery Under Lodna Area
Complete Repairing/ Rewinding of (A) 01(One) No.500 KVA 11KV/440 Volt Mand B Switch Gear Make Lighting Transformer Sl.No.PRM 1210472 and Local Id.No. JL/TR/09 of Jealgora Colliery and (B) 01(One) No.400 KVA 11KV/380 Volt Lighting Transformer Sl.No.
(A)Making 3.3 KV Out door Cable end termination with heat shrinkable Jointing Kit of 185 Sq.mm XLPE Cable and (B) Indoor and Outdoor Cable end termination with heat shrinkable Jointing Kit and straight through cable jointing of 240 Sq.mm XLPE Cable a
Outsourcing for supplying vehicles (Tracker or any other suitable vehicle) and Labours, tools and plants etc. for repair and maintenance of departmental drilled tube wells in Baghmara Block Section Katras in 2026-27. (Group No RM/DT/07)
Complete Repairing and Overhauling of (A) One No. (01) HT Switch 11 KV 400 Amps VCB Switch Sl.No. SGI-2306 and Local Id.No.JL/SW/31 (B) One No. (01) Star Delta Starter ( Local ID.No. JL/STR/550V/09) 250 HP 550 Volt (C) One No. (01) 200 Amps 440
Outsourcing for supplying vehicles (Tracker or any other suitable vehicle) and Labours, tools and plants etc. for repair and maintenance of departmental drilled tube wells in Topchanchi Block in 2026-27. (Group No RM/DT/05)
Outsourcing for supplying vehicles (Tracker or any other suitable vehicle) and Labours, tools and plants etc. for repair and maintenance of departmental drilled tube wells in Tundi Block in 2026-27. (Group No RM/DT/04)
Providing and Fixing Door/Window at Community Center of Nunudih under Lodna Area
Repairing and Maintenance of Motor room and drains at Baniahir under Lodna Area
For electrical re-wiring of A type Qtr No.(1)E/III/495 Deepak Kr. Beldar Clerk Gr-1 P No.61447978 (2)Qtr No.E/V/111 Pratima Devi Gen.Asst. P No.61499441 (3) E/II/244 ,Rahul Kr Mallah Gen.Asst. P No.61518406 at Bhuli Township under Sijua Area
Complete Rewinding/ Repairing Commissioning and Transporting of 1000 KVA 11 KV/3300 Volt Crompton Greaves Make Power Transformer (Sl.No.32351V and Local Id. No. KUJ/TR/ 1MVA/04) at Kujama Section of Amal.NT-ST-Kujama Colliery under Lodna Area
Laying of Paver Block at Hospital Colony Block No.14 15 MOCP under Lodna Area
Providing and Laying of Pit water pipeline from Bhatta Pump Jeenagora to Kamakhya Mandir under Lodna Area
Partial Repairing/ Overhauling of Flow More Make 546 M3 2000 GPM III Stage Sl.No. 22065720-10-02 and Local Id.No. BCCL/JG/pump/ 2000GPM/14 size 10/8 of Amal.NT-ST-JG Colliery Under Lodna Area
Repairing/ Overhauling of engine assembly, 2 Nos. Steering cylinders, cabin assembly and 25 nos. line boring of PayLoader-9020 and Sl. no.1230 of Moonidih Coal Washery.
Complete Repairing/ Overhauling of Submersible Pump and Motor Make Pullen 180 H.P.550 Volt 1450 RPM and 180 Mtrs Head 8 Stage Pump Type Sl.No. 37061 Local Id. No.Jeal/ S.S.Pump/37 at Jealgora Colliery of Amal.Joyrampur Colliery under Lodna Area.
Repairing of 2 Nos. Track Adjuster Assembly and 2 Nos. Boom cylinder assembly of EX-350 Excavator at HV Section of Moonidih Coal Washery.
Complete repairing of rotating unit 3200 GPM, 250m head Flowmore make pump no-1 at ABOCP Mine under Block-II Area..
Repairing and maintenance of Hanuman Mandir at Barora Colony under Barora Area
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Schoool Building & Gov Staff Quarter; School Building & Gov Staff Quarter; Service Provider
Repair of PLC 1771 P6S Power supply card 6, six numbers, repair of PLC 1771 OMD output Modules 2, two numbers, Repair of Blower flap controller 2 numbers, repair of Tric card 2, two numbers, repair of opening and closing card for flap valve 2 , two
Repair of 03 nos. Protonic Controller, 01 no. opening and closing of working air flap card , 01 no. ultrasonic prob of KHD Humboldt Wedag make Jigs of Madhuban Coal Washery under Block-II Area, BCCL.
Up-keepemnt, Door Closing and Security of wagons, rake supplied for Rail Dispatch of Wash Coal and Washed Power Coal from 5.0 MTPA Madhuban Coal Washery under Block-II Area, BCCL.