Loading…
Loading…
360 live204 closing this weekmost from South Western Railway and Indian Railways
360 results • Latest
SUPPLY OF HOMEYCOMB OPTICAL TABLETOP NON MAGNETIC WITH PASSIVE VIBRATION ISOLATION SUPPORTS AT INDIAN INSTITUTE OF TECHNOLOGY DHARWAD
SUPPLY OF MEMBRANE ELECTRODE ASSEMBLY SETUP FOR CO2 ELECTROREDUCTION AT INDIAN INSTITUTE OF TECHNOLOGY DHARWAD
SUPPLY OF DIGITAL DELAY AND PULSE GENERATOR WITH ADAPTER AND CONNECTORS AT INDIAN INSTITUTE OF TECHNOLOGY DHARWAD
SUPPLY OF LASER POWER METER WITH VARIABLE ATTENUATOR AT INDIAN INSTITUTE OF TECHNOLOGY DHARWAD
PANP & S - Provision of General waiting room at PF-1, Toilet block at PF-2, Full length PF shelter at PF-1&2 at PANP & waiting room and parking development at S.
SUPPLY OF MASS FLOW CONTROLLER AT INDIAN INSTITUTE OF TECHNOLOGY DHARWAD
Holder Assembly as per ABB Drawing No. IB 016-00451 Alt 5 or CLW Drg No. 1209-01.238-123.
I.V CANNULA FIXATOR - U-shaped ending in rectangular, made of polypropylene transparent film spread evenly with an adhesive
Ready Mixed Paint, Air Drying, Red Oxide Zinc Chrome, Priming (V3) conforming to IS 2074 (Q3)
Online control and management system using an IOT module installation in the wet well network at Hanif Town which has been constructed to treat and reuse the sewage from the southern part of Hubballi city to the sewage treatment plant in Gabbur
S&T Estimate inconnection with Raydurga station proposed Track Machine siding
S&T Estimate inconnection with Talkal station proposed Track Machine siding
S&T Estimate inconnection with Badami station proposed Track Machine siding
Bengaluru City-Jolarpettai-- Section: Instrumentation of cable stayed bridge (ROB No 832A) 1x45m+1x135m at Km 341/800-342/000 between Krishnarajapuram- Whitefield stations. Maintenance period is 3 months.
TENDER ENQUIRY FOR FLOORING AND COVERING AT PRODUCTION AREA FOR DHARWAD PLANT.
Supplying and fixing mirror on wall (Full height) with 19mm and 12mm thick ply panel including MS framing to have level finish including all accessories for dance club at 3rd floor, Mess.
Shifting of Electro Pneumatic Pressurised Flushing System (EPPFS) from Underslung to Onboard in LHB Coaches of SBC Division for a Period of 12 Months on Outcome Basis.
DC4 Silicon Grease of Dow Corning or Loctite 8104 of Loctite or SELCO-SG-920 of Yale Synthlube Industries in 1 Kg pack/container.
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local, Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local
Hardware Forensic Imager with write blocker kit
Handling and Transport on Lumpsum Basis - Handling & Transport Service
Implementation of Cyber Security measures in Scada system for 25KV and 2x25KV single phase 50Hz Traction Power supply of Ashida make in Hubli Division.
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Outdoor
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Outdoor
SUPPLY OF ICU COTS TO KMCRI HUBLI-NEURO AND HUB CENTRE
Hubballi Division: UBL-KJG (Hubballi - Karjagi): Construction of Limited height subway [LHS] at KM 445/0-100 in Saunshi Yard (SNH) at UBL-KJG Section( Near Br.No-18A) (Maintenance Period: 04 Years)
MULTI VITAMIN DROPS (with Vitamin A, B, C, D) OF not less than 15ML bottel
Development, Operation and Maintenance of Wayside Amenities 01 O-M site in KarnatakaDharwad - Belgaum/NH4/457PLUS648/LHS/Dharwad/ Karnataka
PARACETAMOL 250 MG + PHENYLEPHRINE 5 MG + CHOLORPHENIRAMINE MALEATE 2 MG SYP-NOT LESS THAN 60 ml SYRUP