Loading…
Loading…
360 live204 closing this weekmost from South Western Railway and Indian Railways
360 results • Latest
RECOMBINANT DNA ORIGIN MONOCOMPONENT INSULIN LISPRO 100IU/ML 3ML SOLUTION FOR INJECTION IN A PRE-FILLED PEN FOR SUBCUTANEOUS USE (JUNIOR)
Custom Bid for Services - 63 KVA Renutron UPS Similar Category Annual Maintenance Service - Desktops, Laptops and Peripherals
Nutrient Agar, Macconkey agr Himedia, Blood agar Base Himedia, Muller Hinton Agar, BHI Supplemented w per 0.05 SPS Pediatric, BHI Supplemented w per 0.05 percentage SPS Adults
Facility Management Services - LumpSum Based - EDUCATIONAL; PAINTING; Consumables to be provided by service provider (inclusive in contract cost)
Construction of 2 lane ROB in lieu of LC no.162 as 1x36.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Kolar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Bangarpet) (Approach Span) + RE Blocks and Retaining Wall (Approach Portion)at km 144/900-145/000 and construction of pedestrian subway between BWT-KQZ stations of YNK-BWT section of SBC division. (Composite work)
Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and Retaining Wall (Approach Portion)) at km 1/800-900 along with LHS between BWT-COL stations of BWT-MKM section of SBC division. (Composite work)
Operation and Maintenance of Redevelopment of MG Park for the year 2026-27
Hubballi Division-Proposed construction of additional Running Room at Castlerock (CLR)(24 rooms/48 Beds). (Maintenance Period 03 Years).
NAME OF WORK- Hubballi Division :- Shamiyana arrangements for various occasions like 26th jan, pulse polio programme, award function, RPF raising day, 15 Aug and other occasions in Hubballi.
HORIZONTAL DAMPER SECONDARY YAW for WDP4 locomotives of 6000N Capacity- Item No.3 of RDSO Drg No.SK.VL-484,Alt 4 or latest and to Spec No.MP.0.40.99.03 Rev.05, March 2021 or latest
HUBBALLI DIVISION: Hubballi-Alnawar-Cess widening for a total length of 41.99 RKm,(Maintenance Period : 01 Year)(Two Packet System)
Operation and maintenance of bengeri market and Unkal marketat hubballi for the year 2026-27
Hubballi Division: Proposed construction of Hostel for Post Graduate Men and Women Doctors and dormitory at Railway Central Hospital at Hubballi. (Maintenance Period: 03 Years)
Hubballi Division: Proposed construction of station approach road along with storm water drain and improvements to land scaping in lower circulating area at Hubballi Railway station.(Maintenance Period:12 Months)
Electrical arrangements for Repairs to solar pumps and Platform Extension at TDV, GNB, KNDV-H Stations
Operation and Maintenance of Nehru Stadium Sports Complex at Hubballi for the year 2026-27
Hubballi Division-Improvements to approach Road for RUB 237A at Km.482/345 at Navalur Yard between UBL-LD section. (Maintenance Period - 12 Months).
Maintenance of lawn and Garden at Hubballi for period of 04 Years.SW-I:- Maintenance of lawn and Garden at service buildings (DRM Office, Rail soudha, DRM camp office, GM Camp office, Railway station area, Railway hospital, Railway officers club, VVIP rest House) for a period of 04 Years.SW-II:- Hubballi Division: Maintenance to the lawn and Garden at colonies Hubballli(Golf Link officers colony, Keswapur colony,LBS Clony, Brook road colony, Rail Nagar colony, New Vidyaranya Nagar colony and at dyan vatika) for a period of 04 Years.
supply and installation of fire door at mess block 1st floor
Supply of Fire Resistant 80kg Capacity Hydraulic Door closers
Custom Bid for Services - PAINTING OF LPG PIPELINE ABOVE GROUND LPG BULLET CROSS OVER AND MISC STRUCTURE AT DHARWAD LPG PLANT Similar Category Professional Painting Service
Provision of SMS facility and mechanical brake releasing system for existing lifts at Railway stations.
SWR-SBC Division-Replacement of Six Quad cable between PRNT-PCV section of SBC Division
Earth discharge rod assembly for 25KV AC Traction to be supplied along with two rail clamps, Top clamp (10mm to 20mm dia conductor) and cable 9 meter (7.5 +1.5)m long with size:248/0.45mm and canvas bag as per RDSO Specn. No: ETI/OHE/51(9/87) Rev-1 (Oct-92) or latest.
License for Operating Packed Sweets and Savouries Store in SHA of New Terminal Building of Hubballi Airport
License for Operating Handicrafts Store in Security Hold Area of New Terminal Building of Hubballi Airport
PROVISION OF WHEEL WISE LOAD MEASUREMENT BY EIMWB AT CTA
Providing manpower service to APMC Kundgol For the year of 2026-27
Proposed construction of ROB at LC no 287 between BDKA-UNK section
Subwork 1: Signalling works in connection with SUBL-DWR section Provision of W beam metal crash barrier along side the track for a length of 42.06Km. Subwork2: UBL-GDG: Construction/Extension of Limited height subway (LHS) at Km 36/0-010 in Annigeri yard (NGR) at GDG end in UBL-GDG section.
SWR:UBL Div: Reliable working of signaling system by replacement of defective cable over Hubballi Division
Large span wire 130 sq.mm Stranded Cadmium Copper wire as per RDSO Spec No: TI/SPC/OHE/CAT(Cu-Cd)/0971 or latest.
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Supply and Fixing of Vinyl Flooring
SW-I:- Construction of Indoor shuttle badminton court at Chikajajur.SW-II:- Construction of Indoor shuttle badminton court at Harihar.
SW-I: HAS-SKLR section: Proposed closure of LC No. 39 at Km. 35/300-400 by diverting traffic through LC No.38 at Km. 34/900-35/000 duly constructing road parallel to the track between LC No. 39 to LC No 38.SW-II: MYS-HAS SECTION: Proposed closure of LC No. 65 at Km. 70/385 by diverting traffic through ROB No. 145B at Km. 71/216 BY CONSTRUCTION OF A ROAD PARALLEL TO TRACK BETWEEN LC NO.65 AND ROB No.145B
SW-I:- Additional floor requriment in JRU running room SW-II:- Improvements to Drainage arrangements for Railway Colony at JRU .SW-III:- Construction of S&T Building for Interlocking LC NO 61 (KTY-AVC Section)
AVC-KTY Section: Reconstruction of Existing Retaining Wall Parallel to Track at ROB Nos. 207, 208, 263, and 264, and Provision of Crash Barriers on ROB Approaches at ROB Nos. 207, 208, 219, 233, 263, and 264 in ADEN/DVG sub- division.
ADEN/SKLR Sub Divn- Re-guaging of track including renewal of worn out fastenings over curves and Greasing of rails in curves with railways grease between SKLR- SBHR stations for a period of two years
Expression of Interest for Parking of surplus amount in fixed deposit by UAS, Dharwad