Loading…
Loading…
2,184 results • Latest
CONSTRUCTION OF BURNING CHULLY AND INSTALLATION OF TUBEWELL AT KATHANDARI PASCHIM SAMSAN and others 4
Materials Supply
Materials Supply
Materials supply Dh 2
DHARAMPUR I materials supply
Protection work for a length of 500.00 M along the left bank of river Sui from Satanus House to Khalil Rahamans House via Mofizuddin House at village Pukuria
Emergent Rain Damage Repairing of potholes and patch Repairing of Chopra Udrail Road from 1.00 km to 2.00 km and 3.00 km to 5.85 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent repairing of potholes of Solpara Rasakhowal Road from 7.00 kmp to 11.00 kmp in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
PANJIPARA TO KULAMONI bearing PKG No WB15MTN082
Protection work for a length of 300m along the right bank of river Sui from Doli deoyalchock pachim Eidgaha to Doli deoyalchock Purba Eidgaha
SUIGACHH TO KHUJALUGACHH bearing Package No. WB15MTN079
DALUAHAT TO MIRCHA FP SCHOOL and TEPAGAON TO DOALPARA bearin Pkg No. WB15MTN078
Emergent Rain Damage repairing of potholes and patch repairing of Bhoisbita Soldighi Road from Ch. 1.00 km to 4.950 km and Ch. 5.80 km to 7.72 km in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Emergent Rain Damage repairing of potholes and patch repairing of Maharajahat Bhatol Road from 6.70 km to 11.70 km in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Emergent Rain Damage repairing of potholes and patch repairing of Kaderganj BOP Road from 0.00 km to 0.500 km in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage repairing of potholes and partch repairing of Bindol Bishnupur Road from 0.00 km to 5.00 km in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage repairing of potholes and partch repairing of Kaliyaganj Kunorhat Road from 0.00 km to 2.00 km and 7.50 kmp to 9.00 kmp in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage repairing of potholes and partch repairing of Durgapur kunorhat Road from 7.00km to 10.00 km in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Supply of different type of materials of Surun-I Gram Panchayat
Supply of different type of Saplings and Nursery materials for 12 nos Gram Panchayat
Entry and Mid Level Desktop Computer (Q2) ( ( 3 3 ))
Installtion of high mast electrical light at Amalia Graveyard in Sahapur-II GP, Goalpokher-II Block
Repairing of Polling Station (Such as Ramp, Drinking Water, Electricity, Furniture, Wiring with fittings, Toilet shed) under Chhayghara Gram Panchayat under Itahar Development Block. (Booth No-231 to 238)
Supply of Pesticide (2nd Call)
Construction of Additional Room at GP Building for BSK Purpose.
Construction of Paver Block at GP Premises with necessary repairing.
Construction of Integrated Approach for making a Model School at Dholigaon FPS.
Construction of RCC Covered Drain from Fagu Karmakar House to Alam House at Kamargachh.
Construction of RCC Covered Drain from Pakhortala Transmiter to Poliya Chowka at Budhugachh..
Construction of RCC Covered Drain from Najrul House to Jahedul House at Nandoi.
Installation of Drinking Water with Solar Based Reservour with purifier at Kuchila.
Installation of Drinking Water with Solar Based Reservour with purifier at Naigachh.
Installation of Drinking Water with Solar Based Reservour with purifier at Khatakhua.
Installation of Drinking Water with Solar Based Reservour with purifier at Kuchila Saharab Chowk.
Post DLP - Kushgram to Medinipur bearing Pkg No WB15MTN129.
Repairing work of M-7 Quarter and J-5 Quarter at New Town, Islampur under Uttar Dinajpur Division, PWD during the year 2026-2027.
CHAKULIA (PATHATI MORE)- MAJLISHPUR (VR) ROAD - Chainage from 1.00 Km - 6.00 Km , 7.50 km to 9.00 km and 10.00 km to 13.00 km - Patch Repairing and Maintenance Work (in stretches) under Uttar Dinajpur Division, PWD during the year 2026-27.
Kishanganj-Dinajpur Road-Ch 15.20 Km -15.50 Km and Ch. 20.70 Km to Ch. 21.00 km- Patch Repairing Work and Maintenance Work under Uttar Dinajpur Division, PWD during the year 2026-27.
Installation of Solar Light at infront of Tungoilbilpara Sib Mandir at Bilpara kaliyaganj Block Code 120466143
(1) CONSTRUCTION OF TIN FENCE AT WEST SIDE OF PALAI BARI PRIMARY SCHOOL UNDER SURUN-II GP UNDER ITAHAR BLOCK (2) CONSTRUCTION OF PCC ROAD FROM AYUB HOUSE TO LAND OF MOBARAK UNDER SURUN-II GP UNDER ITAHAR BLOCK
CONSTRUCTION OF PCC ROAD FORM FROM THE HOUSE OF PARIMOHAN TO THE HOUSE OF ANANDA UNDER SURUN-II GP UNDER ITAHAR BLOCK
Emergent Repairing of Potholes of Hemtabad Bishnupur Road from 5.75 kmp to 6.50 kmp, 8.50 kmp to 9.50 kmn and 12.75 kmp to 13.25 kmp in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
(1) CONSTRUCTION OF PCC ROAD FORM NANAHAR SHOSAN TO KALIMONDIR FROM NIPEN ROY POKUR PARA TO KALITOLA UNDER SURUN-II GP UNDER ITAHAR BLOCK (2) REPAIRINGRENOVATION OF UTTAR PALAIBARI FPS UNDER SURUN-II GP UNDER ITAHAR BLOCK
Operation and Maintenance of IE Plant (Pressure Type) for PAHARAJPUR Water Supply Schemes under Raiganj Division, PHE Dte. In the district of Uttar Dinajpur. Period for 12 (Twelve) Months.
Day to Day operation of PAHARAJPUR Piped Water Supply Scheme
Installation of Solar high mast light near Baragachhia Kabarsthan
Day to Day operation of BARUA Piped Water Supply Schemes
Clearing and grubbing at both sides of road flanks including removal of vegetation etc and disposal of rubbish cutting of kutcha drains from Ch. 0.00 km to 4.30 km and 7.20 km to 10.50 km of Churaman Itahar Kushmandi Road from Ch. 0.00km to 13.00 km
Installation of Solar Street light near Masjid at Dakhin Bijubhita and others 3 nos
Emergent Repairing of potholes of Ramganj Udrail Daspara Road from 0.00km to 7.00 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur