Loading…
Loading…
37 results • Latest
PROVN OF URINAL POINT , TOILET NEAR BLDG NO OWT-140, PROVN OF 01 X SEPTIC TANK ,SOAK WELL NEAR BLDG NO 347, PROVN OF 02 X SOAK WELL FOR BUILDING NO OWT-233 OWT-273, SPL REPAIRS TO BLDG NO T-419, T-450 (OR LIVING), T-421 (TOILET BLOCK) , T-422 (BATHR
Surface dressing n exc 15 cm deep and getting out in soft/loose soil, complete all as specified and directed.
A) (a) Cleaning & deepening of catch water drain on hill top and tunnel top and cleaning of track side drain in cutting & tunnel in SE ghat section. (b) Removal of vegetaton including small trees, plants & shrubs from face of retaining walls of various heights, made on valley side hill top, tunnel face and on face deep cuttings by suitable arrangements of jhula/ rappeling with harness and other support system with trained personnel to avoid damage of walls due to vegetation growth. B)(a) Desilting of culverts, cleaning of waterway of bridges inluding removal of muck garbage, night soil etc. under ADEN (N) LNL. (b) Removal of Muck/Boulder accumulated behind retaining wall on top of cutting/hill/tunnels on SE Ghat section.
A1-catch water cleaning in cutting & Tunnels. 1623612.38 Below/P
CONSTRUCTION OF BARBED WIRE FENCING AT PT-2590 BOP OF 61 BN ITBP PASIGHAT (AR)
Earth work in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. (DSR 1997 VOL-1 ITEM No 2.6.1) All kinds of soil.
CONSTRUCTION OF BARBED WIRE FENCING AT JORGING BOP OF 61 BN ITBP PASIGHAT (AR)
Earth work in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. (DSR 1997 VOL-1 ITEM No 2.6.1) All kinds of soil.
CONSTRUCTION OF BARBED WIRE FENCING AT UNE-NALLAH BOP OF 61 BN ITBP PASIGHAT (AR)
Earth work in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. (DSR 1997 VOL-1 ITEM No 2.6.1) All kinds of soil.
CONSTRUCTION OF BARBED WIRE FENCING AT NAPE BOP OF 61 BN ITBP PASIGHAT (AR)
Earth work in excavation over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. (DSR 1997 VOL-1 ITEM No 2.6.1) All kinds of soil.