Loading…
Loading…
108 results • Latest
Construction of paver brick paving and a drain from Sachin house to Dharampal house, passing via the Panchayat Ghar, in village Daudpur
Construction of a paver block road from the Daraura Jarari connecting road to Ramghat Temple in Village Daraura with the consent of Village Head Shri Vineet Singh
MECHANISED APPLICATION OF FINISHES INCLUDING PLASTERING AND PERIODICAL SERVICES FOR OTM ACCN OF FATEHGARH CANTT
Supply of 40kVA 3 Phase Automatic Voltage Regulator (AVR)
Supply of LT switchgear panel with Sub Distribution Board at Akashvani Farrukhabad, Uttar Pradesh, Supply of LT switchgear panel with Sub Distribution Board at Akashvani Mandi, Himachal Pradesh, Supply of LT switchgear panel with Sub Distribution Board at Akashvani Pithoragarh, Uttarakhand, Supply of LT switchgear panel with Sub Distribution Board at Akashvani Leh (Ladakh)
Facility Management Services - LumpSum Based - NAGAR PALIKA PARISHAD FARRUKHABAD; SUPPLY WORK OF 6 MM 3 CORE COPPER CABLE 150 MTR; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - NAGAR PALIKA PARISHAD FARRUKHABAD; SUPPLY WORK OF 10 MM 3 CORE COPPER CABLE 150 MTR; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - NAGAR PALIKA PARISHAD FARRUKHABAD; SUPPLY WORK OF 16 MM 3 CORE COPPER CABLE 150 MTR; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - NAGAR PALIKA PARISHAD FARRUKHABAD; SUPPLY WORK OF 20 MM 4 CORE ARMOURED CABLE 140 MTR; Consumables to be provided by service provider (inclusive in contract cost)
MII Purchase Preference No Seamless Pipe Schdule-40 Size 6 Inch, Thickness 7 Mm In Meter ( 24 meter ), Seamless Long Bend Schdule-40 Size 6 Inch, Thickness 7 Mm In Each