Loading…
Loading…
1,406 results • Latest
Supply of Materials and Erection for Increasing Capacity of T/F installed at 33/11 KV S/s Jahanabad Distt. Fatehpur in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur.
Improvement of hmp through road and lane work from nirala nagar at malikpuram lalypop school to sunil verma house Under Ward-07 Zone-5
Improvement of side patri through interlocking work from papular dharmkata to jhanda chauraha dubble side Under Ward-16 Zone-5
Renewal of Bindki Lalauli to Naraicha road (10)
Renewal of Korra Sadat Marg to Shankarpur Haswa Link Road (3)
Work of laying RCC humus pipe for drainage of contaminated water from Shoy Bakery to Dev Shukla house Kashyap Nagar in Ward-35 Kalyanpur North under Zone-6
Construction Of Platform And G.I. Chain Link Fencing For Static Cryovessel At Pashu Chikitsalaya Manjanpur Vikas Khand Manjanpur ,Distt. Kausambhi,
Cleaning of Nala and disposal of silt near Ramva railway station to Tripula.
Construction Of Platform And G.I. Chain Link Fencing For Static Cryovessel At Pashu Chikitsalaya Sadar Vikas Khand Teliyani, Tehsil Fatehpur Distt. Fatehpur (U.P.)
Cleaning of Nala and disposal of silt near Ravinder yadav khet to Akoopur Damar road Culvert.
Cleaning of Nala and disposal of silt from FCI Godam to near Ravinder Yadav Khet.
Cleaning of Nala and disposal of silt from Akoopur Damar road culvert to Tripula (G.T.) raod.
Cleaning of Nala and disposal of silt from Banda Sagar road Jhaupur Culvert (Dr. Om Prakash) to Sayedabag.
Cleaning of Nala and disposal of silt from Ekari Railway Culvert (Tripula) to Madaripur Nala.
Cleaning of Nala and disposal of silt from Sayedabag to Chaudhakiyapur.
Cleaning of Nala and disposal of silt from Patelnagar Chauraha to Shadipur in Civil line.
Cleaning of Nala and disposal of silt from Beldarayya Shiv Mandir to 620 talab (Coverd).
Cleaning of Nala and disposal of silt from ITI Culvert to Diwedi hotel to talab,
Cleaning of Nala and disposal of silt from Baqarganj Chauraha to Jwalaganj Chauraha (Right hand side).
Cleaning of Nala and disposal of silt from I.T.I Culvert to Anil Singh Vidhayak Awas and back side of Khadigramodhog and verma Chauraha Culvert.
Cleaning of Nala and disposal of silt from Patharkata (Rahees Machali wale) to Mahila Degree College to talab.
Cleaning of Nala and disposal of silt under of 50 nos Bridge from Sapa Karyalaya to Nai Tahsil Chauraha.
Cleaning of Nala and disposal of silt from Baqarganj to FCI Godam (Right hand side).
Cleaning of Nala and disposal of silt from Nirankari Culvert to Laxmi Takeej.
Cleaning of Nala and disposal of silt from Miya Sahab ki takiya to Mahooq Pahalwan culvert.
Cleaning of Nala and disposal of silt from H/O Ayenul to Andauli talab in Vinovanagar.
Cleaning of Nala and disposal of silt from Near water tank to ganda Nala in Aboonagar Redayya Nai basti.
New Construction of Fatehpur Joniha marg to Thakurainpur Link Road With Five year Maintenance as per attached SOP
Facility Management Services - LumpSum Based - Supply of Electrical Spares for Tube Well (T/W) Control Panels; Supply of Electrical Spares for Tube Well (T/W) Control Panels; Consumables to be provided by service provider (inclusive in contract cost)
Dosing pump (Q3) (3 (3 ))
Repair work of second floor of shelter home under Zone-04 Ward-15
Reparing and Painting work of Ananda Rao Park Situated in ward 91 Zone-6.
Crawler Hydraulic Excavator (V2) (Q2)
Pest and Animal Control Service - Maintenance Contract; 3 months; General Pests/Insects Control, Pest and Animal Control Service - Maintenance Contract; 3 months; Vector Control (Mosquitoes/insects), Pest and Animal Control Service - Maintenance Contract; 3 months; Rodent Control, Pest and Animal Control Service - Maintenance Contract; 12 months; Termite Control (Spot Treatment/Drilling treatment)
FUSE WIRE
Construction of 02 Nos Slab Culvert at KM No 01 of Khaga Naubasta Road FATEHPUR District
Work for Replacement of damaged pole in EDD Fatehpur
Work For Replacement of damaged PCC Pole in EDD Bindki, Fatehpur
Work for Extention of LT Lines in EDD-Bindki, Fatehpur
Work for Installation of RMU under semi turn key basisi in EDD- Bindki, Fatehpur
Work for Installation of cable jointing kit and various maintenance work in EDD Khaga Fatehpur
Work for Replacement of damaged pole in EDD Khaga Fatehpur
LED Luminaire For Road And Street Lights Conforming To IS
Pipe Unions confirming to IS 1239 (Part 2) (Q4) (3 (3 ))
Cast Iron Detachable Joints for use with Asbestos Cement Pressure Pipes as per IS 8794, IS 12987 (Q3) (3 (3 ))
Improvement of road and drain work from barra-3 anand mishra house to r.n aroda lig-219 Under Ward-34 Zone-5
Construction of Boundary wall at outlaying court, Khaga in Distt.-Fatehpur
Improvement work of drain and footpath by interlocking tiles from house no. G-508/11 to G-508/20 under zone 06 ward 23 housing development.
Improvement work of Drain and Street by Interlocking Tiles from House of Vaibhav Nishad to House of Dinesh Via R.R.K. School in Amrood Mandi Under Zone-06, Ward-40, Vishnupuri.
New Construction of Baraicha to Chirai Gaon Link Road (With Five year Maintenance as per attached SOP) (4)