Loading…
Loading…
1,398 results • Latest
Supply of Materials and Erection for Construction of 33/ 11 KV SUB STATION (2X5) MVA Amaon Distt. Fatehpur and its associated 33 KV and 11 KV Line in Business Plan 2026-27 on Semi Turnkey Basis under EDC, Fatehpur
Improvement of damages street near H.N 88/54 to 88/98 in ward-107 zone-01
zone-01 ward-107 ke antargat 105/665 to 105/691 tak Khastigrast Footpath Avam Side Pataery Ka Sudhar Karya
Canteen Service - Best Price on Fixed Menu Rate Model - Vegetarian; Breakfast, Lunch, Dinner, Snacks; Inside Building Premises (exclusive for employees/patients/in house personnel)
Biosafety Cabinet (Q2) (3 (3 ))
Pyrogallol (Q3)
ELECTRICAL CABINET
Construction work of lane by C.C. from 97/299 to 97/130 under ward-108 zone-4.
Repairing of foothpath and painting work at F.M colony in zone-04
Development of new A site Retail Outlet with facilities like Sales Building, Canopy, Paver block driveway and other allied civil electrical works at location Between KM Stone No. 118 to 122 on NH-34 (Old NH-86), Khanna Toll Plaza to Kabrai, Distr
Tanker on Agricultural Trailer (Q2) (3 (3 ))
Modular Toilet (Q3)
Muttaur to Shakha link road
Construction work of interlocking on both sides of the footpath from Krishna house to Dhirendra Kesharwani house in Ward No. 09 Thakur Dariyav Singh Nagar Sonari Road under Nagar Panchayat Karikan Dhata
Tourism development work of Baba Temple in Rahiman Ke Purwa, village Jamrava of Fatehpur district
LED Luminaire For Road And Street Lights Conforming To IS
Civil rectification and strengthening work of control room building at 33/11 KV Substation-Jafarganj, Fathehpur.
Civil rectification and strengthening work of control room building at 33/11 KV Substation-Bakewar and Dighrua, Fathehpur
Work of installing channel link fencing in the Jalkal store inside the Jalkal compound.
Work No-45 Construction of drain and CC from Amit Kumar Sharma house to Kalika Pal and Naseem house in Ward No. 15 Maswani.
Work No-14 Construction of drain and CC from Pappu mill to Sumit Kumar Maurya house in Ward No. 05 Garhiva.
Work No-43 CC construction work from Bhola Pal house to Nanki Devi house in Ward No. 15 Maswani.
Work No-67 Construction work of drain from Iqbal Bahadur house to Bhuiya Devi Temple drain in Ward No. 19 Muraintola.
Construction work of RCC drain from Anil Kumar house to Gupta ji house behind Hari Marriage Lawn in Ward No. 09 Ramganj Pakka Talab Mahpur.
Work No-07 Work of laying interlocking tiles on the footpath from in front of Kamal Singh house to Agrahari Sweets in Ward No. 23 Deviganj.
Construction of drain and CC from Mahendra Narayan house to Vijay Pal house and Ashok Kumar house in Ward No. 03 Buxpur.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7, Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Construction of boundary wall at 33/11 kv Substation-Chandpur, District-Fatehpur
Plunger Assembly
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM KALI MATA MANDIR TO DEV SHARAN HOUSE 115M BHOLA YADAV TO ASHOK NIRMAL HOUSE 45M RINKU MISHRA HOUSE TO AMARIT LAL SHAHU 41M AND RISHU MISHRA HOUSE TO SHAMI MISHRA VIA FOOLGENDRA HOUSE 93M IN WARD 14
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM MELA CHABUTARA TO JAIPAL HOUSE VIA FUDAN HOUSE IN WARD 14 THAKUR NIRMAL SINGH NAGAR HARDO NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM SHANI D J HOUSE TO VIKAS SHAHU HOUSE IN WARD 14 THAKUR NIRMAL SINGH NAGAR HARDO NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM MURARI SWEET HOUSE TO DHARMENDRA SINGH HOUSE IN WARD 14 THAKUR NIRMAL SINGH NAGAR HARDO NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD FROM JWALA SINGH HOUSE TO ALAI ROAD TAK IN WARD NO 10 TURANG SINGH NAGAR IN NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM KRISHNAPAL MASTER HOUSE TO RAM CHANDRA TUBEWELL TAK IN WARD 10 TURANG SINGH NAGAR HARDO NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD ANDRCC DRAIN FROM DAMER ROAD TO PHOOL SINGH HOUSE IN WARD 07 SHIV NAGAR SHIV DUTTA KA PURWA NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM BUDDU HOUSE TO CHHOTE HOUSE IN WARD 07 SHIV NAGAR KUKARI NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM BARAT GHAR PANCHAYAT GHAR TO ASHARAM HOUSE VIA JAISINGH HOUSE TAK IN WARD 05 VIVEKANAND NAGAR HASANPUR AKODIYA IN NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD FROM HASANPUR AKODIYA VILLAGE TO CHITULI LINK ROAD TAK IN WARD 05 VIVEKANAND NAGAR AKODIYA IN NAGAR PANCHAYAT KHAGA FATEHPUR
Millboard, Greyboard and Strawboard (V2) as per IS 2617 (Q3) (3 (3 ))
Construction of drain and CC from Indrapal house to Shankar Lal house and Dinesh Chandra house in Ward No. 22 Isinpurwa Bhikharipur.
CONSTRUCTION OF TYPE- II RESIDENCE, MULTIPURPOSE HALL, LAB AND LIBRARY BUILDING AT GOVERNMENT I.T.I KHAGA DISTRICT FATEHPUR(U.P)
CONSTRUCTION OF CC ROAD and RCC DRAIN FROM HARIKESH HOUSE TO PANI TANKI TAK IN WARD 05 VIVEKANAND NAGAR CHITAULI IN NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD and RCC DRAIN FROM RAJKUMAR HOUSE TO RAJENDRA SINGH HOUSE IN WARD 05 VIVEKANAND NAGAR GOPALPUR IN NAGAR PANCHAYAT KHAGA FATEHPUR
CCONSTRUCTION OF CC ROAD AND RCC DRAIN FROM MANDIR TO GARIBE HOUSE IN WARD NO 2 JYOTIBA PHULE NAGAR SUJARAHI IN NAGAR PANCHAYAT KHAGA FATEHPUR
CONSTRUCTION OF CC ROAD FROM DAYALPUR PANCHAYAT GHAR TO MEDAIPUR DAMAR ROAD TAK IN WARD NO 1 AMBEDKAR NAGAR DAYALPUR IN NAGAR PANCHAYAT KHAGA FATEHPUR
Operation And Maintenance Of Water Supply Systems - 30HP Sumersibl Moter with all work 10 nos, 25HP Sumersibl Moter with all work 5 nos, 20HP Sumersibl Moter with all work 5 nos
Extension and Inter Connection work of 110mm PVC pipeline from petrol pump to Kapoor Mishra house in Ward No. 12, Mohalla Radhanagar Bahua Road.
Construction of boundary wall at New EDC Office, District-Fatehpur.
Beautification Work of Ramlila Complex and Stage in Village Amauli, Development Bock Amauli District-Fatehpur (U.P.)